1) Task(s) assigned to me this week
o July 22- Regarding the updated file of bundle packs, I needed to separate computation of
pallets for the input or the inbound finished goods from the output or outbound finished
goods and to sort it by target month of bundling.
o July 25- Measure the dimensions of the column post and the outer line enclosed to it in
South Mega DC. It was measured to verify if the dimensions of the post matches with the
dimensions given to the supplier of the racks.
o July 26- Measure the dimensions of the dock leveler and racks in the DC of the former
plant in Rosario, Pasig. To check if the dimensions of the rack would be compatible for
the charging station of the MHEs in South Mega DC. Based on the layout of the South
Mega DC, we needed to count the number of water closets, urinals and sinks per work
station and to compute for the capacity of the persons to be served.
1|Page
University of Santo Tomas
Faculty of Engineering
Industrial Engineering Department
4) My Accomplishments
4.1) Highlights
July 26- Consolidated all the data gathered of a DC in Rosario, Pasig.
July 25- Determine the number of water closets, urinals, sinks per toilet and
computed for the capacity of persons to be served for each toilet.
4.2) Lowlights
July 23- Consolidated and sorted the data from the new file sent to us.
6) Issues being experienced/encountered
6.1) Difficulties experienced/encountered
We had a problem in measuring the rack high using the laser measuring tool since
it was a selective type of rack.
6.2) How do I manage and resolve it?
We measured it at a different angle using the Pythagorean method. We measured
its adjacent and hypotenuse and solved for the rack high.
8) Next Steps
Encoding of files and finish Project 1.