YEMAARCHITECTURE P.L.

C
Eyerusalem Wonde Project
Design process: comments and responses
Wednesday 5,2020

ERP EL
Issues Raised Response Assigned to
1. As per our previous discussion at least 50cm wide wall was agreed 1. Provided and will be part of 1. Amabaye
on Axis C/4-5 at lift lobby entrance for distribution boards at each the next version (V2)

floors of basements 01, 02, and 03. But this is not shown in this
drawing.
2. What about "Injera Mitad" in kitchens. Please locate if they are to be 2. Provided and will be part of 2. Ambaye
powered. the next version (V2)
3. In Gym room at 10th floor better to change locations (or Mirror 3. There is a wall up to 90cm 3. Ambaye
image them) the cycling and running tracks. Running tracks need and you will have enough
space for the sockets .It
power and therefore better to them opposite to solid wall in order to
stays as is
avoid floor mounted sockets.
4. Need reflected ceiling plan or interior decorators idea before starting 4. We are working on It . One 4. Harerta ,Interiod deisgner and Ambaye
electrical design for exact location of fittings and detectors. we know the layout of the
sanitary we will provide the
Reflected ceiling

ERP SN/ST
Issues Raised Discussions Made Decisions Passed
5. NA 5. 5.
6. 6. 6.

Page 1 of 1