Six Sigma DMAIC project to improve the performance of an aluminum die casting
operation in Portugal
Pedro Alexandre de Albuquerque Marques Robert Matthé
Article information:
To cite this document:
Pedro Alexandre de Albuquerque Marques Robert Matthé , (2017)," Six Sigma DMAIC project to
improve the performance of an aluminum die casting operation in Portugal ", International Journal of
Quality & Reliability Management, Vol. 34 Iss 2 pp. 307 - 330
Permanent link to this document:
Downloaded by University of Newcastle At 01:48 30 January 2017 (PT)
http://dx.doi.org/10.1108/IJQRM-05-2015-0086
Downloaded on: 30 January 2017, At: 01:48 (PT)
References: this document contains references to 40 other documents.
To copy this document: permissions@emeraldinsight.com
The fulltext of this document has been downloaded 27 times since 2017*
Users who downloaded this article also downloaded:
(2015),"A systematic review of Lean Six Sigma for the manufacturing industry", Business Process
Management Journal, Vol. 21 Iss 3 pp. 665-691 http://dx.doi.org/10.1108/BPMJ-03-2014-0019
(2017),"Z and W charts for controlling service processes", International Journal of Quality &
Reliability Management, Vol. 34 Iss 2 pp. 295-306 http://dx.doi.org/10.1108/IJQRM-05-2015-0085
Access to this document was granted through an Emerald subscription provided by emerald-
srm:173272 []
For Authors
If you would like to write for this, or any other Emerald publication, then please use our Emerald
for Authors service information about how to choose which publication to write for and submission
guidelines are available for all. Please visit www.emeraldinsight.com/authors for more information.
About Emerald www.emeraldinsight.com
Emerald is a global publisher linking research and practice to the benefit of society. The company
manages a portfolio of more than 290 journals and over 2,350 books and book series volumes, as
well as providing an extensive range of online products and additional customer resources and
services.
Emerald is both COUNTER 4 and TRANSFER compliant. The organization is a partner of the
Committee on Publication Ethics (COPE) and also works with Portico and the LOCKSS initiative for
digital archive preservation.
*Related content and download information correct at time of download.
Downloaded by University of Newcastle At 01:48 30 January 2017 (PT)
The current issue and full text archive of this journal is available on Emerald Insight at:
www.emeraldinsight.com/0265-671X.htm
Six Sigma
Six Sigma DMAIC DMAIC project
project to improve the
performance of an aluminum
die casting operation in Portugal 307
Abstract
Purpose – The purpose of this paper is to illustrate an application of the Six Sigma define, measure, analyze,
improve, control (DMAIC) problem-solving methodology in a Portuguese industrial enterprise, aimed at
reducing the rejection rate of a specific manufactured product due to defects generated in an aluminum
gravity die casting operation.
Design/methodology/approach – Along the five-stage roadmap, a set of analytical and conceptual tools
was systematically employed to better characterize the problem, define the product’s critical to quality
characteristics, estimate the process baseline, determine the relevant cause-and-effect relationships, identify
the root causes leading to the high rejection rate, implement an improvement plan, determine the effectiveness
of the improvement actions, and put in place a control plan.
Findings – The project team discovered that the high rejection rate was caused by factors inherent to the
gravity die casting operation itself and by the mixing of rejected parts made of different types of alloys from
other locations within the plant. Another key finding was that the successful execution of the project was only
possible due to the belief and support of top management and to the active involvement of the team members.
Practical implications – This case study illustrates a successful practical application of a Six Sigma
project in a small-medium enterprise in Portugal, as well as the operational and financial benefits that derived
from it; thus providing a good example for others to follow.
Originality/value – Few cases of continual improvement initiatives, including Six Sigma projects,
developed at a Portuguese company are available in the literature; this paper fills such void by describing a
very successful application that demonstrates the advantages that other companies can learn in terms of
adopting structured methodologies to improve the quality of their products and the efficiency of their
processes. Moreover, the analysis and conclusions herein presented can be of great importance for companies
using gravity die casting technology.
Keywords Six Sigma, DMAIC, Design of experiments (DOE), Low pressure die casting
Paper type Case study
1. Introduction
Six Sigma is a project-based, customer-focused, and data-driven approach (Black and Revere,
2006) that makes use of a structured and systematic methodology, which relies on the define,
measure, analyze, improve, control (DMAIC) roadmap for continuous improvement, to
enhance the capability of business processes (El-Haik and Al-Aomar, 2006). To be effectively
implemented, this problem-solving methodology requires full management belief and
commitment, a well-trained and experienced technical project leadership to act as a change-
agent, and a dedicated and competent multifunctional project team (Goldstein, 2001).
Despite its growing popularity, few practical applications of Six Sigma in Portugal have
International Journal of Quality &
been reported. This paper describes a concrete application of a Six Sigma project in a Reliability Management
Portuguese industrial enterprise, by outlining the activities that were carried out during Vol. 34 No. 2, 2017
pp. 307-330
each phase of the DMAIC approach, and by illustrating how, when, and why a set tools and © Emerald Publishing Limited
0265-671X
techniques were employed. The project was identified and selected to improve the current DOI 10.1108/IJQRM-05-2015-0086
IJQRM manufacturing process, in order to minimize the rejection rate of a specific manufactured
34,2 item, an aluminum window handle model.
The paper is organized around five main sections. In Section 2, a brief overview of Six
Sigma is given. The current state of the implementation of Six Sigma in Portugal is analyzed
in Section 3. The case study is presented and described throughout Section 4, as well as the
discussion of its results and practical implications. Finally, the conclusions of this paper are
308 summarized in Section 5.
2. Six Sigma
Six Sigma has been labeled and defined in a variety of ways, but it is often described from
the following three viewpoints:
(1) metric;
(2) methodology; and
Downloaded by University of Newcastle At 01:48 30 January 2017 (PT)
Conceição and Major (2011) conducted a survey to determine the extent to which
Six Sigma is adopted by the largest 500 non-financial companies operating in Portugal.
Their main conclusions were the following:
• the implementation of Six Sigma still has little expression in those companies; and
• despite this, companies demonstrate a good interest in Six Sigma, just surpassed by
ISO 9001 and the balanced scorecard.
Pacheco (2012) surveyed a set of Portuguese ISO 9001 certified companies from different
activity sector about their perceived importance of a wide set of quality tools, techniques,
and methodologies; 76 percent of the respondents considered Six Sigma to be an important
methodological approach, but the study also reveals that other less complex quality
methods, such as benchmarking and many of the quality basic tools, are considered to be
more important than Six Sigma.
Recent research from Fonseca et al. (2014) reveals that Six Sigma still unknown
methodology for most of the small and medium enterprises (SMEs) in Portugal, even for the
Portuguese excellency SMEs. In the authors’ opinion, this largely explains the low levels of
adoption of the Six Sigma methodology.
Silva et al. (2010) concluded that the inability to quantify benefits could be other of the
obstacles to the widespread of more advanced approaches, such as Lean and Six Sigma;
according to the authors’ study, managers are reluctant to adopt new continual improvement
paradigms if the expected benefits are unclear. For Lopes et al. (2011) one of the reasons that
can explain why just a small number of Portuguese industrial companies adopt Six Sigma is
the fact that its implementation is more demanding when compared to other quality
improvement approaches, requiring more investment in training and resources.
Peer-reviewed literature containing case studies or practical applications of Six Sigma in
Portugal was identified and shown in Table I. According to our literature review, the first
case study was published in a Portuguese journal in 2009 by Matthé (2009). In the following
year, Delgado et al. (2010) published the first Six Sigma case study that took place in
Portugal in an international journal.
Since then, every year at least one case study has been published. There are other
indicators that demonstrate an increasing interest in Six Sigma in the country. One of them
is the positive evolution on the number of MSc and PhD theses from Portuguese universities
on the subject. Figure 1 was constructed based on the information provided by the thesis
and dissertations repositories of the Portuguese universities.
The first doctoral theses were published in 2012 and 2013. Most of the MSc and PhD
theses contain practical applications of Six Sigma projects in different types and sizes of
organizations with activity in Portugal.
IJQRM References Project scope Company
34,2
Matthé (2009) DMAIC project to reduce the delivery time of produced goods STA (producer of systems
for doors and windows)
Delgado DMAIC project to speed-up the auto loan process GE Money Portugal
et al. (2010)
Riesenberger and DMAIC project to errors during the customer complaints Bosch Car Multimedia
310 Sousa (2010) process
Gomes (2010) DMAIC project to reduce errors in the Printing Systems area Xerox Portugal
Marques Integration of Six Sigma with ISO 9001 and execution of a Six STML- (engineering
et al. (2011) Sigma DMAIC project services provider)
Baía (2015) DMAIC project to increase the filling operation capability Company that sells
fertilizer bags
Abreu DMAIC project to the reduce the response time of the Bosch Car Multimedia
et al. (2012) complaints
Ferreira DMAIC project to improve the internal logistics processes Producer of domestic
Downloaded by University of Newcastle At 01:48 30 January 2017 (PT)
10
MSc thesis PhD thesis
9
8
7
6
5
4
3
2
Figure 1.
Evolution of the 1
number of MSc and
PhD thesis on Six 0
Sigma in Portugal Before 2008 2009 2010 2011 2012 2013
2008
Another indicator is the increasing number of short- and long-term training courses on Six
Sigma offered in the country. For instance, currently, four post-graduate degrees on the
subject are offered, while before 2006 no such type of course existed in the country. Since
2008, a Six Sigma conference has been taking place in Portugal almost every year. Various
companies from distinct business sectors have presented communications at these events,
showing concrete Six Sigma projects and their results.
To sum up, despite the adoption of Six Sigma by companies operating in Portugal
remains very low, there is a set of indicators that reveals an increasing interest from both
the academic and professional communities.
4. Case study Six Sigma
This section describes a Six Sigma project developed at Sociedade Transformadora de DMAIC project
Alumínios, S.A., from now referred as STA, an organization that is specialized in the design
and production of systems for doors and windows, particularly for aluminum profiles. STA
has implemented ISO 9001, it is certified ISO 9001 by TÜV Rheinland since 2006, and uses both
Lean and Six Sigma for their continual improvement. Projects are selected using a matrix that
rates them in function of different parameters linked to STA’s strategy such as: environmental, 311
safety, time reduction, savings, and payback in case of an investment is required.
German). But today the quality and aesthetical expectations require significant process
improvements. In this company the process is used to produce architectural hardware in low
silicon aluminum, in order that the products can be anodized. That makes the products
corrosion resistant, and it requires low maintenance.
Moreover, many of the defects could only be detected at the end of the manufacturing
process. These two related problems used to lead to significant waste factors and costs,
including the following:
(1) Waste of time and unnecessary consumption of resources in processing already
defective items.
Figure 2.
Window handle
model Ho-2AG
IJQRM (2) Too much rework prevents other products to be manufactured, thus creating two
34,2 additional problems:
• To satisfy the specified service levels to the customer, the levels of safety stocks
need to be higher, which increases the holding costs.
• The company has more difficulties in complying with the necessary lead time to
deliver on-time the order demanded by the customer.
312
(3) The mentioned waste factors result in additional labor, materials, and energy
consumption costs, among others.
(4) Non-quality costs resulting from the lack of capability of the process in meeting the
product specifications.
(5) Intangible costs, including image and reputation costs.
Downloaded by University of Newcastle At 01:48 30 January 2017 (PT)
(6) The sales of anodized aluminum architectural hardware represent 5 percent of the
company’s turnover, and it is growing.
(7) Depending of experience of the operators and other unknown factors occasionally
sometimes the production yield was higher.
The company decided to select this as a Six Sigma project using the DMAIC approach. Each
project phase of this roadmap, together with the main activities comprising the planning
stage, is described in the next subsections. In the last subsection, the results and conclusions
of the project are presented and discussed.
Project statement This Six Sigma project aims to optimize the current manufacturing process of
window handle model Ho-2AG, in order to reduce the high rejection rate
Description of the problem or Current results shows that the rejection rate for this product is more than
opportunity 50%. This is due to the high-standards: (1) the surface of the handle needs to
be impeccable and (2) invisible region of the surface cannot have objects
which can be felt by touch. Currently, the manufacturing process shows
major objects only at the end of the process
Project scope Manufacturing process of the handle Ho-2AG
Importance of the project The current process is taking too much time, and it is too costly. This justifies
the importance of this project
Table II. Main goals of the project There are two main objectives for this project: (1) to optimize the current
Project charter manufacturing process in order to minimize the rejection rate and (2) to
characterizing and determine to which extent a new or redesigned process would be needed in
scoping the Six Sigma order to elevate its capability to the desired levels
project (partial) Main resources for the project Time of the team members, external consultant
diagram, depicted in Figure 3, were carried out. The team then gathered and analyzed data Six Sigma
from the manufacturing process, by inspecting handles that were rejected in the previous DMAIC project
two weeks of production. At the same time, an affinity diagram was constructed to group
similar types of defects into a same class/category of defect.
Data depicted in Table III, showing the number and percentage of defects that occurred
in both weeks for each category of defects established in the affinity diagram, enabled the
project team to conclude that more than 50 percent of the defects that occurred in both 313
weeks concerned “pores” and “filling errors,” which are known to have their origin in the
gravity die casting operation. In addition, the patterns observed for the die casting defects in
weeks 1 and 2 differ; for instance, “filling errors” were much more common on week 1 than
on week 2; on the contrary, “solidification shrinkages” and “pores” occurred more often on
the second week. It was also possible to conclude that grinding errors, created at the
grinding operations, were the most relevant class of defects on week 2; however, its
incidence on week 1 is very small.
Downloaded by University of Newcastle At 01:48 30 January 2017 (PT)
Ingots supplier Aluminum alloy ingots Melted aluminum alloy “Die casting” operation
Rejected casted materials Fusion
Furnace temperature
Fusion time
“Fusion” operation Volume of melted aluminum Solidified casted materials “Separation of the
alloy rigging” operation
Temperature of the melted
alloy
Temperature of the mould Die casting
Type of die coat applied
Rotation speed of machine
Die casting cycle times
“Die casting” operation Solidified and cooled casted Rigging system separated “Separation of the
materials Separation of the fron the window handles extractor pin” operation
Positioning during cut rigging system
Type of saw
“Separation of the Window handles with an Extractor pin separated “Manual grinding”
rigging” operation extractor pin from the window handles operation
Separation of the
Cutting force extractor pin
Positioning of the handles
“Separation of the Handles with roughness Surface of the handles “Automatic grinding”
extractor pin” operation Manual grinding smoothed in the feed operation
Type of ribbon used
(filing) region
D 62 þ55 þ10 þ6 þ6 þ1
DPMO ¼ 106 ¼ 106 ¼ 216; 049 (1)
PO 108 6
In this formula, D is the total number of defects detected in the tests; P, the number of
handles produced in those tests; and O, the considered number of opportunities for defects.
The number of opportunities for defects comprises the six categories of defects depicted in
the Pareto chart of Figure 5. For this DPMO, the corresponding Sigma level (Z ) value is
approximately 2.2 (Z ¼ 2.2).
Week 1 Week 2
Group of defects Number of occurrences Percentage Number of occurrences Percentage
1. Subtype of defect 1: rounded edge in the border of the functional and aesthetical regions
Operational definition
Description of the requirement Visual detection
The handle will conform if:
315
• The edge delimiting the functional and aesthetical regions of the
handle does not present a rounded shape.
3. Subtype of defect 3: Incomplete filling in the lateral surface of the square block
Operational definition
Description of the requirement Visual detection
The handle will conform if:
• The block presents a perfect square shape.
• All the four faces of the square block are flat, are absent of any
cavity, and do not have any lack of material.
34,2 70 120%
60
100%
50
80%
Cumulative Percent
Occurences
316 40
60%
30
40%
20
20%
10
Figure 5.
Pareto diagram of the – 0%
die casting defects Impurities and Solidification 0.006 Buried Other types of
Downloaded by University of Newcastle At 01:48 30 January 2017 (PT)
Feeding
channels
Type of
Absence of
die coat Method of
ventilation
Filling Temperature Solidification application
Volume of errors of the mould shrinkages of the die
Size of the coat
melted
ventilation bags
casting alloy
poured into
the mould
Mixes of
different alloys
Contamination of
Pores Impurities
Figure 6. Roughness the casting alloy
Cleaness of
tend to
Chain of causes-and- appear the melted
effects that lead to the casting alloy
occurrence of die Mould Cleaness of the
cleaning Method for pouring the Operator of the
casting defects melted casting alloy rotating machine
casting alloy in the
fusion furnace
a test or series of tests in which purposeful changes are made to the input variables or
factors of a process so that we may observe and identify corresponding changes in the
output response (Montgomery, 2009). A critical observation of the output variables using
the design of experiments (DOE) should thus allow the team to isolate the factors that
influence the variability of the gravity casting process. To carry out the DOE in the analyze
phase, the following sequence was adopted:
(1) selection of the response variables;
(2) choice of the controllable factors (input variables);
(3) preparation of the DOE;
(4) conduction of the DOE; Six Sigma
(5) analysis of the results; and DMAIC project
(6) identification of possible interactions.
Selection of the response variables. A DOE strategy was developed in order to investigate
which controllable input factors of the gravity die casting operation have a significant effect on
the CTQ characteristics of the handle model under study. Three specific CTQs were considered: 317
(1) filling errors (CTQ1);
(2) solidification shrinkages (CTQ2); and
(3) pores (CTQ3).
The variables inherent to these three CTQs are not continuous, since the detection of any of
these defects in a handle is only possible by visual inspection.
Downloaded by University of Newcastle At 01:48 30 January 2017 (PT)
Choice of the controllable factors. Using the information from the interrelationship
diagram, the audit of the production process, several brainstorming meetings were held
with the shop floor people and their supervisors to identify which factors could have an
effect on the CTQs (output variables).
The project team agreed to screen the following four controllable input factors:
(1) volume of molten alloy poured into the mould;
(2) temperature of the molten alloy;
(3) rotation speed of the gravity die casting machine; and
(4) type of die coat.
To investigate their individual and combined influence on the CTQs, two distinct levels
were defined for each factor, as shown in Table IV.
Preparation of the DOE. To avoid running all the 16 possible combinations among the
levels of the four factors, corresponding to a 24 full factorial, a two-level fractional factorial
strategy was designed. In particular, a 24−1 experimental design was defined, thus only half
of the 16 treatments needed to be considered. In this resolution IV design, single factors are
not aliased with two-factor interactions, but some two-factor interactions are aliased with
other two-factor interactions (Schmidt and Launsby, 1994). To estimate the experimental
error, each combination was replicated two times. Furthermore, it was decided that for each
replicate, a total of 120 handles would be produced and then inspected. The experimental
design strategy is exhibited in Table V. To avoid the negative influence of noise factors on
the output during the experiments, a set of control procedures were established.
The experimental results in terms of proportion of defectives for the three CTQs are
depicted in Table VI. Proportions follow a binomial distribution, rather a normal
Alternatively to the mentioned approach, a general linear model, namely a logistic regression
model, could have been used to work with the original binary data.
Conduction of the designed experiments. Unfortunately, it was not possible to get equal
Downloaded by University of Newcastle At 01:48 30 January 2017 (PT)
sample sizes in all the experiments. For this reason, a balanced design was not achieved, so
data were analyzed using the general linear model of the analysis of variance (ANOVA).
Analysis of the results, including the identification of possible interactions. The resulting
ANOVA tables for the three CTQs, after unusual observations were removed from analysis,
−1 −1 −1 −1 120 2
+1 −1 −1 +1 120 2
−1 +1 −1 +1 120 2
+1 +1 −1 −1 120 2
Table V. −1 −1 +1 +1 120 2
Experimental design +1 −1 +1 −1 120 2
strategy of the −1 +1 +1 −1 120 2
screening DOE +1 +1 +1 +1 120 2
ANOVA table
Source df Seq SS Adj SS Adj MS F p
3 P
1
2 4
S
5
6 L
7 Figure 7.
Factory plant
layout, areas where
operations of the
Figure legend: handle Ho-2AG take
1 Fusion 5 Automatic grinding L Lacquering
place, and point
where problematic
2 Low pressure die casting 6 Polishing P Polishing by vibration
issues were identified
3 Separation of rigging system 7 Anodization S Stainless steel conformation
in the audit
4 Manual grinding Problems detected
Plate 1.
Photos from one of
the creativity sessions
IJQRM A set of creativity sessions with the personnel from the company, including operators, was
34,2 undertaken (Plate 1). Many ideas of improvement actions were collected, combined,
analyzed, and the most promising ones considered.
The final version of the improvement plan contained a set of actions that were grouped
around the four areas indicated in Figure 8.
4.6.1 Area of action 1 – improvements in the gravity die casting operation. The main
322 effects plots for the three types of defects assessed in the DOE are depicted in Figure 9, while
the most relevant interaction plots, according to the conclusions that were described in
Table VIII, are shown in Figure 10.
The analyses of these plots enabled the team to determine the best level combination
regarding the four controllable factors, as follows:
(1) volume of molten alloy: large die casting spoon;
(2) temperature of the molten alloy: 730°C;
Downloaded by University of Newcastle At 01:48 30 January 2017 (PT)
2 On-the-job training
Main Effects Plot for Filling errors Main Effects Plot for Solidification shrinkages
Fitted Means Fitted Means
Volume Temperature Volume Temperature
0.9 0.45
0.8
0.40
0.7
0.6 0.35
0.5 0.30
Mean
Mean
0.40
0.35 and plot of the
0.30 0.35
interaction that has an
important effect on
0.25
0.30
solidification
730 750 42.5 Hz 50.0 Hz shrinkages (left)
Temperature Rotation speed
A higher temperature
benefits the functional
region of the handle
Figure 11.
Illustration of the
physical contradiction
that needed to be
solved using the
A lower temperature separation principles
benefits the aesthetical of TRIZ
region of the handle
IJQRM technical skills of the personnel. The on-the-job training program covers several topics,
34,2 including the following ones:
• promotion and dissemination of the best practices to be adopted in the operational
procedures involved in gravity die casting and in manual grinding;
• standardization of the inspection criteria in all the control points of the process, in
order to ensure exactly the same criteria are adopted by everyone; and
324
• provision of knowledge and guidelines to increase the ability of people to visually
distinguish items or parts casted in different types of alloys, with the objective to
prevent alloy mixes.
4.6.3 Area of action 3 – prevention of alloy mixings. During the analyze phase, the project
team concluded that alloy mixings are more likely to occur at workplaces located
downstream in the manufacturing process. It happens not only due to lack of knowledge,
Downloaded by University of Newcastle At 01:48 30 January 2017 (PT)
but also because an effective procedure to properly sort rejected items according to their
type of alloys does not exist.
To solve this problem, a simple but effective preventive system, comprising
a set of procedures, was implemented. Figure 13 together with the following description,
Located heat
C
Stainless steel
Fabrication of
components
D
A
B
Plate 2.
Central point to
deposit the rejected
items according
to the alloy that
they were casted
IJQRM BEFORE AFTER
34,2
326
Downloaded by University of Newcastle At 01:48 30 January 2017 (PT)
Plate 3.
Examples of
the results of the
5S program
Figure 14 shows the evolution of these metrics from May 2014 to February 2015. From the
graphs, it is possible to conclude that the performance of the process has increased
dramatically, thus proving the effectiveness of the improvement actions. The capability of
the process, given by the Sigma Level enhanced from 2.3 to 3.1, the average number of
defects per handle lowered from 1.47 to just 0.36, and the rate of defective handles were Six Sigma
reduced from about 79 percent to less than 25 percent. DMAIC project
The financial benefits derived from this project were also estimated. Two savings
categories were considered: one-off and recurring. One-off savings correspond to the delay
or avoidance of investments; recurring savings correspond to financial benefits that occur
every year. The results are presented in Table IX. Since the costs that were assumed in the
Six Sigma project were around 50,000 euro, it means that the cost of the project is paid in one 327
year by the recurring income. The cost avoidance equals two times the project cost.
5. Conclusions
After providing a review about the state of implementation of Six Sigma in Portugal, this
paper describes the activities that were carried out to select, plan, and execute a continuous
improvement Six Sigma project based on the DMAIC roadmap at a Portuguese company,
STA – Sociedade Transformafora de Alumínios, S.A. The define phase allowed the team to
Downloaded by University of Newcastle At 01:48 30 January 2017 (PT)
better understand the problem, and determine that most of the defects had origin at the die
casting operation. Further data were collected in the measure phase by means of production
tests, which led to the estimation of the performance baseline of the manufacturing process.
In the analyze phase of DMAIC approach, a set of studies, including DOE, were conducted to
identify the root causes of the die casting defects. Some of the relevant causes had origin in
the gravity die casting operation itself, but others had origin in downstream operations
where alloy mixings tended to occur, thus jeopardizing the mechanical propertied of the
AG4Z alloy. The improve phase involved the development and implementation of a set of
Saving Estimated
Saving description type saving (€)
Diminution of costs due to a lower rework rate for the Ho-2AG handle Recurring 37,000 €/year
Some of the lessons learnt could be extended to other products to decrease their Recurring 13,000 €/year
rejection rates
Due to the decrease in the rework, the gravity die casting machines is available One-off 36,000 €/year
to produce other products to be sold Table IX.
Due to the decrease in the rejection rate, the levels of safety stocks could One-off 300 €/year Estimation of the
be decreased financial benefits of
Investment in a low gravity casting robot could be deferred for the future One-off 65,000 € the project
IJQRM improvement actions that were grouped around four areas of action. The introduction of the
34,2 improvement actions significantly decreased the rejection rate of the Ho-2AG handle. The
effectiveness of the improvement actions were also confirmed by the significant
enhancement on the values of other metrics.
References
328
Abreu, P., Sousa, S. and Lopes, I. (2012), “Using Six Sigma to improve complaints handling”,
Proceedings of the World Congress on Engineering, London, July 4-6.
Altshuller, G. (1999), The Innovation Algorithm – TRIZ, Systematic Innovation and Technical Creativity,
Technical Innovation Center, Worcester, MA.
Antunes, D.L., Sousa, S. and Nunes, E. (2013), “Using project Six Sigma and Lean concepts in internal
logistics”, Proceedings of the World Congress on Engineering, London, July 3-5.
Baía, A.P. (2015), “Achieving customer specifications through process improvement using Six Sigma:
Downloaded by University of Newcastle At 01:48 30 January 2017 (PT)
case study of Nutrisoil Portugal”, The Quality Management Journal, Vol. 22 No. 4, pp. 48-60.
Barone, S. and Lo Franco, E. (2012), Statistical and Managerial Techniques for Six Sigma Methodology:
Theory and Application, Wiley, Chichester.
Black, K. and Revere, L. (2006), “Six Sigma arises from the ashes of TQM with a twist”, International
Journal of Health Care Quality Assurance, Vol. 19 No. 3, pp. 259-266.
Breyfogle, F. (2003), Implementing Six Sigma: Smarter Solutions Using Statistical Methods, 2nd ed.,
John Wiley & Sons, NJ.
Carvalho, M.T. (2008), The Impact of Total Quality Management in the Financial Performance of
Portuguese Companies, Faculty of Economics, University of Coimbra, Coimbra (in Portuguese).
Conceição, A.C. and Major, M.J. (2011), “Use of the Six Sigma by the 500 largest companies in Portugal”,
Revista Brasileira de Gestão de Negócios, Vol. 13 No. 4, pp. 312-331.
De Mast, J. (2007), “Integrating the many facets of Six Sigma”, Quality Engineering, Vol. 19 No. 4,
pp. 353-361.
Delgado, C., Ferreira, M. and Castelo-Branco, M. (2010), “The implementation of lean Six Sigma in
financial services organizations”, Journal of Manufacturing Technology Management, Vol. 21
No. 4, pp. 512-523.
El-Haik, B.S. and Al-Aomar, R. (2006), Simulation-Based Lean Six Sigma and Design for Six Sigma,
Wiley, Hoboken, NJ.
Ferreira, I.S., Cabral, J.A., Saraiva, P.M. and Oliveira, M.C. (2014), “A multidisciplinary framework to
support the design of injection mold tools”, Structural and Multidisciplinary Optimization, Vol. 49
No. 3, pp. 501-521.
Ferreira, L.M., Silva, C. and Mesquita, C. (2013), “Using the Six Sigma DMAIC methodology to improve
an internal logistic process”, in Azevedo, A. (Ed.), Advances in Sustainable and Competitive
Manufacturing Systems, Springer, Charm, pp. 1461-1473.
Fonseca, L., Leite, D. and Lima, V. (2014), “Six Sigma methodologies: implementation and impacts on
Portuguese small and medium companies”, International Journal for Quality Research, Vol. 8
No. 4, pp. 583-594.
Goldstein, M. (2001), “Six Sigma program success factors”, Six Sigma Forum Magazine, Vol. 1 No. 1,
pp. 36-45.
Gomes, M.J.S. (2010), “Improvement of segment business using DMAIC methodology: a case study”,
International Journal of Performability Engineering, Vol. 6 No. 6, pp. 561-576.
Hoerl, R.W. and Gardner, M.M. (2010), “Lean Six Sigma, creativity, and innovation”, International
Journal of Lean Six Sigma, Vol. 1 No. 1, pp. 30-38.
Hoshmand, R. (2006), Design of Experiments for Agriculture and the Natural Sciences, 2nd ed., Chapman
& Hall/CRC, Boca Raton, FL.
Karthi, S., Devadasan, S.R. and Murugesh, R. (2011), “Integration of Lean Six-Sigma with ISO Six Sigma
9001:2008 standard”, International Journal of Lean Six Sigma, Vol. 2 No. 4, pp. 309-331. DMAIC project
Kubiak, T.M. and Benbow, D.W. (2009), The Certified Six Sigma Black Belt Handbook, 2nd ed., ASQ
Quality Press, Milwaukee, WI.
Lopes, I.S., Nunes, E.P., Sousa, E.D. and Esteves, D. (2011), “Quality improvement practices
adopted by industrial companies in Portugal”, Proceedings of the World Congress on
Engineering, London. 329
Marques, P.A., Requeijo, J.G., Saraiva, P.M. and Frazão-Guerreiro, F.J. (2013), “Integrating Six Sigma
with ISO 9001”, International Journal of Lean Six Sigma, Vol. 4 No. 1, pp. 36-59.
Marques, P.A., Saraiva, P.M., Requeijo, J.G. and Frazão-Guerreiro, F.J. (2011), “Integration of Six Sigma
with a QMS based on the ISO 9001 requirements: a Portuguese SME case study”, Proceedings of
the 2011 IEEE International Conference on Quality and Reliability, Bangkok, pp. 391-397.
Marques, P.A., Saraiva, P.M., Requeijo, J.G. and Frazão-Guerreiro, F. (2014), “Six Sigma life cycle”,
in Henriques, E., Peças, P. and Silva, A. (Eds), Technology and Manufacturing Process Selection:
Downloaded by University of Newcastle At 01:48 30 January 2017 (PT)
Further reading
Breyfogle, F.W. III (1999), Implementing Six Sigma: Smarter Solutions Using Statistical Methods, Wiley,
New York, NY.
George, M.L., Rowlands, D. and Kastle, B. (2005), Wat is Lean Six Sigma?: Sneller en Slimmer Werken
met Beter Resultaat, Uitgeverij Thema, Zaltbommel (in Dutch).
Harry, M.J. and Schroeder, R. (2000), Six Sigma: The Breakthrough Management Strategy
Revolutionizing the World’s Top Corporations, Currency Doubleday, New York, NY.
Marques, P.A. (2013), “Six Sigma: management system and innovation methodology in an
integrated and structured approach”, PhD dissertation, NOVA University of Lisbon, Caparica
(in Portuguese).
Pande, P.S., Neuman, R.P. and Cavanagh, R.R. (2000), The Six Sigma Way, McGraw-Hill, New York, NY.
IJQRM About the authors
34,2 Pedro Alexandre de Albuquerque Marques received a Diploma in 2001 and a PhD in Industrial
Engineering from the NOVA University in Lisbon in 2013. He is certified Six Sigma Black Belt by the
American Society for Quality (2014), a Senior Consultant with ISQ (2006 till now), an Assistant
Professor at the Faculty of Engineering of the Lusófona University (2014 till now), an Invited Lecturer
at the Faculty of Engineering of the Catholic University of Portugal (2008-2012), an Invited Researcher
at the Unit for Research and Development in Mechanical and Industrial Engineering of the NOVA
330 University of Lisbon (2007-2013), a Researcher at the I&D Lab of ISQ (2012-2014), a Lecturer in various
post-graduate and professional training courses at ISQ (2007 till now), Portuguese Association for
Quality (2014 till now), Norma Azores (2013), Verlag Dashöfer (2008-2011), and SQS Portugal
(2008-2010). His interests are in the areas of Lean, Six Sigma, Design for Six Sigma, Management
Systems, and Product Design. Pedro Alexandre de Albuquerque Marques is the corresponding author
and can be contacted at: pamarques78@gmail.com
Robert Matthé Graduated in Applied Economics and Industrial Economy from the University of
Antwerp (1974), MBA from the KU University of Leuven (1978), MSc in Accounting from the VLECHO
Brussels – Flemish School of Economics (1982). He is certified Six Sigma Black Belt at Praxair,
Downloaded by University of Newcastle At 01:48 30 January 2017 (PT)
a General Manager of STA in Portugal (2005 till now), a Senior Consultant with the Ideas@work
Managing Consultant Six Sigma in Belgium (2004-2005), Executive and Management roles at Praxair
Europe (1983-2003), a General Manager at Union Carbide Industrial Gases in the UK (1983-1985),
an Invited Lecturer in Financial Analysis and Accounting at the Graduate School of Schoten in
Belgium (1974-1975), an Advisor in the Economics Diplomacy to the Belgium Embassy in Lisbon (2013
till now), a Representative Administrator in Oporto of the Belgium-Luxembourg-Portuguese Chamber
of Commerce (2010 till now). His interests are in the areas of Lean, Six Sigma, Theory of Constraints,
Business Economics, and Economics.