IS 1199 (Part 6) : 2018

All dimensions in millimetres.


FIG. 6 MEASUREMENT OF SEGREGATED P ORTION

28 TEST RESULT a)
Identification of the test sample;
The segregated portion SR is calculated from the b) Location
where the test was performed;
following equation and reported to the nearest c) Date and
time of test;
1 percent. d) Ambient
temperature;
e) Segregated
portion SR, to the nearest
1 percent;
SR = f) Presence
of bleed water, if any, after standing
for 15
min;
where g) Any
deviation from the standard test method;
SR = segregated portion in percent; h)
Declaration by the person technically
mps = mass of sieve receiver plus passed material,
responsible for the test that it was carried out
in g; in
accordance with this standard, except as
noted in
(g).
mp = mass of the sieve receiver, in g; and
j) The report
may include,
mc = initial mass of concrete placed onto the sieve,
in grams. 1)
temperature of the concrete at the time
of
test; and
29 TEST REPORT 2) time
between completion of mixing and
The test report shall include the following:
performance of the tests.