Laboratory Test Frequency, LGED
S| item of Works Type / Name of test | ae
1) Plasticity Index (PI) | One 2,000 m!
it) 4 day soaked CBR One 2,000 mi?
4. Embankment iti) MDD. (Standard) _ "One 2,000 m> *|
iv) FDD. ‘One 600 m5 =|
| __| wer One200m |
| i) Plasticity index (P1) One 5,000 m#
| ii) 4 day soaked CBR (One 5,000 m#
2 ‘Sub grade iii) MDD z ine 5,000
iv) FDD One 900 me |
¥) DCP ~ One 300 m? |
)FM/Gradation ‘One 500 m?
ii) 4 day soaked CBR ~One,000m |
3 | Improved Sub grade| ii) MOD E- Sele tT ||
iv) FDD One 300m |
[ vy) DCP 4 sc. One 100 m' ]
i)Gradation = ‘One 500 m?
| | ii) 4day soaked CBR 6 X, One 750m
| ii) LAA 1 .) One 1,000m |
4 | sub-base iv) MDD One 750 mi |
web | One 150 m? |
vi) W/A (Stone/Brick) ones00m' |
wii) DCP One 50 m*
if i) Gradation One 500 m?
| ij4daysoaked CBR One 750m?
iii) MDD. a One 750 m?
5 | Base Course ivyeDD | One1s0m |
V)LAA One 1,000 m?
vi) W/A (Stone/Brick) One 500 m*
wil) DCP [ One 50m?S| ttemorworks Type / Name of test Saal
Teal i} Compressive Strength Set 1,000 m
& | Edging ii) Water Absorption Set 1,000m
1) Compressive Strength set 2,000 m?
hap se 1 Water Absorption “_set2,000 me
i) Softening Point One 10,000 m2
i) Flash Point : One 10,000 m*
ii Penetration (One 7.500 m=
ie iv) Gradation of FA One 5,000 m=
8 | Materials ¥) Gradation of CA One 5,000 mi
vi) WA of CA One 5,000 m#
vi) LAA One 5,000 mé
vii) Flakiness Index One 5,000 m#
DFM One 50 mé
ii) W/A (Coarse Aggregate) One $0 m?
it AA /acy One 50 m®
9 | concrete iv) Gradation of CA
¥) Setting Time of Cement
vii) CS of Concrete
| i) Compressive Strength of et 300 me?
if) Water Absorption of Bricks Set 300m’
it Bfflorescence of Bricks Set 300 m?
10 | Brick Works
iv) Setting Time of Cement Set 300 a
¥) CS of Cement Set 300 mi
Wi) FM of Sand Set 300 m*
=i aac | NR sat/0 10000
If the number of test(s) to be pefformed as per specified test-frequency for any item becomes
‘whole number with a fraction equal to 0.20 or less,
that case the actual number of test (s) shall
the whole number only. On, the other hand if the fraction is more than 0.20 then the actual number‘
test(s) for that item shall be rounded to next whole number Engineer in-charge has the right
increase the no. of tests for any item beyond the set frequency as he deems required to ensure the
{quality and contractor is to perform the additional tests on his own,
Implementation of various items of work should be carried out according to the set frequency.
costs of all tests even additional to the frequency requirement should be covered by the quoted rate.‘TEST FEES FOR QUALITY CONTROL TEST, LGED
a name of est vit | Rate
A CEMENT
2 [Seng Tine tach | 700.00
3 T compressive Strength (3,7,28 days) (Each Set comprises with 3 cubes) Set 1,200.00
4 T Fineness by sieve Each 500.00
AGGREGATE
Sieve aa of ie Area bach
4 unit ‘weight 400.00
S| Absorption of Coarse Aggregate z Each 300.00
7 | Los Angles Abrasion 2 Each 1,000.00
@ [Te Percent Fes vatFV) Fach | 1860000
9 | Aureaate Casing Value Fach | 90000
70 | Agrees impoct Value tech | 60000
11 | CBR of Coarse Aggregate - Each 8,000.00
12 | CBR of Fine Aggregate Fach | 7.00000
15 cP Test tach | 20000
16 | Field Density by Sand Cone Method Each 800.00
7 Field Density by Core-Cutter Method Each 400.00
418 | Voids Ratio Each 300.00
19 | Soundness of. Aggregate Each 2,000.00
20" | lngtion index (EN) Fach 30000
21 | kines index (1) sch) 20000
cick
2 | Water Absorption (6 Nos) Set 1,000.00
3 | Sie & Shape (Nos) se] stn00
4 | weight (vo) sar | 20000
~[ orescence (Nos) se | 30000
Page 369Name of Test
D. CONCRETE:
Compressive Strength Cylinder (Each set comprises with 3 specimen)
Compressive Strength of Cube (Each set comprises with 3 specimen)
| Concrete Gylinder Casting & Testing (Each set comprises with 3 specimen)
| Concrete Cube Casting & Test prises with 3 specim:
‘Slump test
Design of Concrete Mixes
Impact of Hammer Test
Core Cutter
“ng Tote
{i) Transportation TK.500/day
E. Bitumen :
1 _| Softening Point (R&B) E
ae Ae LACEY : =
te a
4 | Loss-on-heating test ois, : fol
S| Standard Penetration 7 -
“6 | Core cutter ae =
‘) Cutting
[ ii) Transportati
‘Bituminous material Test
') Sample Preparation (Each set comprises with 3 specimen.)
1) Stability & Flow
i) Asphalt Mix Design
Bitumen Extraction
Shrinkage Limit
Zou Sertakeas LS
| Natural Moisture Content
| Liquid Limit
Plastic Limit
“Unit weight
Specific Gravity
Sieve & Hydrometer combined Analysis +Specific glavity
Sand equivalent test
Void ratio
Consolidation test
Field Vane Shear Test for cohesive SollName of Test
1) Unconsolidated Untrained
Direct Shear test
ee Fach | 1,600.00
Bach [2,500.00
L ee
75 [nal Sear Tex
| Uacnsldatd Unraned zach | _is0000]
i const fen | 280000
on 150000
3.50000
16 | Permeability
| Dcohesive 2,000.00
i) Non -Cohesive Each | 1,000.00
G. Sub-Soll Investigation:
“Sub-soll exploration & testing to be executed according to the advice of design unit, LGED in regards tothe no. of
bore hole, types &no, of laboratory test P
1 | Mobilization and demobilization of boring equipment such as drilling rig,
drilling pipes. drop hammer, tripod, pulley, chain wrangle, sample collection |
‘devices tools and plants tripod for temporary camp.& arrangement for water
Supply, other accessories and manpower at work site within 25 km from district
head atrs. etc all complete and accepted by the Engineer. I aT
visit and inspection of sampling by the Geo-tech. Expert/Engineer _| Persite | 3,678.69
Persite | 579639
| Erection and placement of boring equipment at site
TVOn diy ground ae with 02.75m depth of water ias308
“IVA te wth wae depth betwen 075m ad 3 er point| 258267
site with water depth above 3m ~ [er point | 3.97400
Execution of Boring :Driling 100 mm dia bore-hole by wash boring method
i) 0 109 meter
)) 9 meter to 18 meter
Execution of Standard Penetration Test
1) 0 9 meter : Per Point
ii) 9 meter to 18 meter See Per Point |
10 meter to 27meter [Per Point
iw) 27meter to 36 meter [Per Point
¥) 36 meter to 45 meter Per Point |
i w)Above 45 meter [Per Point |
| caneclon ot bisrbed Sepa Wevery Lim baer Werieon [Pers
Collection of Undisturbed soil Samples by Shelby Tube from cohesive layer
including preservation, transportation and accepted by the Engineer (ASTM
.1587-83)
Per Sampleae Name of Test Unit Rate
Mapping & Reporting
1 Preparation of Topographic map ofthe site
Preparation, writing and submission of report on sub-soll investigation containing
2. | all parameters, bearing capacities, x-sections, two or more sets of data ete. ll
Complete as per satisfaction and direction of engineer in-charge
Plate Load Test
7 | Plate load test mobilization, demobiliation arrangement of plates forloading and | Per test
allother required materials, execution of tests recording the data preparation and
submission of test report and accepted by the Engineer-in charge. |
‘Cone Penetration Test (CPT)
7] Hlectronic Gone Penetration Test with pore pressure measurement, dissipation test | Each
| up to S0m depth to measure friction ange, un-drained shear strength, SPTIN6O,
Relative density, pore pressure etc. Test on- ground surface
2 | sectronic Cone Penetration Test with pore pressure measurement, dissipation
test up to 50m depth to measure friction angle, undrained shear strength, SPT N6O,
Relative density, poe pressure etc. Test on- water
Each
H. Reinforcement
1 Tensile Strength (Bar dia up to 19mm) I
T ‘Tensile Strength (Bar dia > 19mm - 40mm)
3 Bend (Bar dia up to 19mm)
+ Bend (Bar dia > 19mm - 40mm)
|. Miscellaneous.
1 | Calibration of Pressure gauge
2 | calibration of Hydraulic jack without Pressure Gauge
3. | calbration of Hydraulic Jack with Pressure Gauge
Calibration of Compre
Calibration of Proving Ring
Pile Integrity Test
Bearing Pad
1 Hardness (ASTM D-2240)
ii) Test of Compression Set for 22hr at 100°C (ASTM D-395)
1a) Ash Content
vill) No. and thickness of Elastomer layer and Steel Plate
In case of smaller works up to an estimated cost of 10,00,000.00 (Ten lac) for each Individual
prescribed lab test frequency is not mandatory. The concerned Engineer can determine the test
practical needs and demands and then perform those tests inthe field to ensure quality