Ee To Se

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

GOVERNMENT OF ANDHRA PRADESH

WATER RESOURCES DEPARTMENT


FROM TO
SRI S.V.RAJENDRA PRASAD, B. Tech., THE SUPERINTENDING ENGINEER
EXECUTIVE ENGINEER, PIPLMC CIRCLE
P.I.P.L.M.C.DIVISION NO.3, TUNI
JAGGAMPETA-533 435.
E.G.DISTRICT.

Letter No.EE/PIPLMC Div.3/JPT/DB/ATO/LMC / 218SE Dated: 15.09.2020


Sir,
Sub: -Water Resources Department-Polavaram Irrigation Project Left Main Canal Division No.3,
Jaggampeta- Breaches on PIPLMC Right Bank at KM 52.010 in Ramavaram(v),
Jaggampeta (M) and at KM 58.450 on Pushkara main canal - Submission of flood report –
Reg.

Ref: -1) Dy EE/PIPLMC/ sub Division No.2/Jaggampeta Lr.No. Camp No.1 Dt: 15.09.2020.
***
It is to bring to your kind notice that the due to heavy unprecedented rains and the
subsequent surplussing of the Surampalem Reservoir scheme along with other uncontrolled vagus
lead to the heavy inflows into the Polavaram canal causing rise of rapid water level thereby
causing breach on PIPLMC right bank at CH. KM 52.010 in Ramavaram (V), Jaggampeta (M)
Due to heavy flows from the breach of PIPLMC at KM 52.010 into the Pushkara canal,
the breach has occurred at right side inspection path of Pushkara main canal at Chainage KM
58.450 in Peddanapalli (v) of Yeleswaram (m) in E.G Dist.

I herewith submit the detailed flood report for favour of information and for taking
further necessary action.

Encl: 1) flood damage report – 1 no


2) Flow diagram of breach- 1 no
3) News paper clippings- 3 nos

Yours faithfully,

Executive Engineer,
PIPLMC Division No.3,
Jaggampeta: E.G.Dist.,

You might also like