Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

PREVENTIVE MAINTENANCE CHECKLIST

AREA / LOCATION: INSPECTED BY:


PM DATE / TIME: LAST PM DATE / TIME: SIGNATURE:
ELECTRICAL & ELECTRONIC EQUIPMENT DCN: MIL-PMS-02
PM FREQUENCY: AS NEEDED  WEEKLY  MONTHLY  OBSERVATIONS INDOOR  OUTDOOR 

DEFFECTIVE

REQUIRED
WORKING
ITEM #

REPAIRED

REPLACE
EQUIPMENT NAME DESCRIPTION REMARKS

1 SECONDARY CONE CRUSHER a) HMI    


b) Lubrication pump    
c) Hydraulic pump    
d) Fan cooler    
e) Sensors    
f ) Solenoid valve    
h) Control circuit,relay    
contactor    
   
2 REGENERATION KILN a)    
b)    
c)    
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   

Reviewed by: Noted by:

Reynaldo L. Obina Renan H. Caminero


Instrumentation Engineer Mill Electrical Superintendent

You might also like