Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

30/12/2020 C18 Industrial Engine WRH00001-UP(SEBP3816 - 85) - Documentación

Pantalla anterior
Bienvenido: pvaldez
Producto: INDUSTR IAL ENGINE
Mode lo: C 18 INDUSTR IAL ENGINE W R H
C onfiguración: C 18 Industrial Engine W R H00001-UP

Desarmado y Armado
C15 and C18 Industrial Engines
Número de medio -RENR8630-11 Fecha de publicación -01/05/2020 Fecha de actualización -18/05/2020

i03192802

Cylinder Head - Install


SMCS - 1100-012

Installation Procedure
Table 1
Required Tools

Tool Part Number Part Description Qty

A 4C-5592 Anti-Seize Compound -

B 8T-2998 Lubricant -

C 9S-3263 Thread Lock Compound -

NOTICE
Keep all parts clean from contaminants.

Contaminants may cause rapid wear and shortened component life.

https://sis.cat.com/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/mediasearch/mediaheaderinfoframeset.jsp&calledpage=/sisweb/sis… 1/6
30/12/2020 C18 Industrial Engine WRH00001-UP(SEBP3816 - 85) - Documentación

Illustration 1 g01067188

Note: Thoroughly clean the spacer plate and the bottom surface of the cylinder head and the top of the cylinder
block. A new spacer plate gasket and a cylinder head gasket must be installed when the cylinder head is
removed.

1. Install O-ring seal (19) on the dowel in the cylinder block.

2. Install spacer plate gasket (21) on the cylinder block.

3. Install spacer plate (18).

4. Install seals (22) and seal (20).

5. Install cylinder head gasket (17) on the spacer plate.

https://sis.cat.com/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/mediasearch/mediaheaderinfoframeset.jsp&calledpage=/sisweb/sis… 2/6
30/12/2020 C18 Industrial Engine WRH00001-UP(SEBP3816 - 85) - Documentación

Illustration 2 g01067444

6. Attach a suitable lifting device to cylinder head (16). The weight of cylinder head (16) is approximately 235 kg
(518 lb).

7. Carefully install the cylinder head on the dowel pins on the cylinder block.

8. Apply Tooling (A) to the threads of cylinder head bolts (15) and both sides of the washers. Install cylinder head
bolts (15).

Illustration 3 g01072801

Note: The bolts that are Marked "X" are 216 mm (8.5 inch) long: 11, 12, 13, 14, 16, 18, 20, 22, 24 and 26. The
rest of the bolts are 194 mm (7.6 inch) long.

9. Tighten the cylinder head bolts according to the following procedure.

a. In a numerical sequence, tighten Bolts 1 through 26 to a torque of 270 ± 15 N·m (200 ± 11 lb ft).

b. In a numerical sequence, tighten Bolts 1 through 26 to a torque of 450 ± 15 N·m (330 ± 11 lb ft).

c. In a numerical sequence, again tighten Bolts 1 through 26 to a torque of 450 ± 15 N·m (330 ± 11 lb ft).

https://sis.cat.com/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/mediasearch/mediaheaderinfoframeset.jsp&calledpage=/sisweb/sis… 3/6
30/12/2020 C18 Industrial Engine WRH00001-UP(SEBP3816 - 85) - Documentación

Illustration 4 g01067185

10. Position the gasket and air inlet elbow (11) on the cylinder head and install bolts (12), if necessary.

11. Connect hose assembly (9) at the cylinder head.

12. Connect hose assembly (8) at the cylinder head. Install the bolt and the clip that secures the hose assembly to the
front housing. Install the bolt and the clip that secures the hose assembly to the cylinder head.

13. Position the breather tube on the cylinder head and install bolt (14). Tighten the bolt to a torque of 10 ± 3 N·m
(89 ± 27 lb in).

14. Position the bracket on the cylinder head and install bolts (7).

15. Connect inlet air temperature sensor (13).

16. Connect boost pressure sensor (10).

https://sis.cat.com/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/mediasearch/mediaheaderinfoframeset.jsp&calledpage=/sisweb/sis… 4/6
30/12/2020 C18 Industrial Engine WRH00001-UP(SEBP3816 - 85) - Documentación

Illustration 5 g01067192

17. Install O-ring seal (5) and O-ring seal (6) on sealing plate (3). Lubricate O-ring seal (6) with a 50/50 mixture of
Tooling (B) and clean engine oil.

Illustration 6 g01067193

Illustration 7 g01067195

18. Install adapter assembly (4) and sealing plate (3). Ensure that the dowel in adapter assembly (4) engages the hole
in the camshaft.

Note: Ensure that the O-ring seal stays in the groove in sealing plate (3).

19. Install thrust plate (1) . Apply Tooling (C) to bolts (2). Hold the thrust plate in position and install bolts (2). Evenly
tighten bolts (2) until sealing plate (3) and the O-ring seal are seated against the cylinder head.
https://sis.cat.com/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/mediasearch/mediaheaderinfoframeset.jsp&calledpage=/sisweb/sis… 5/6
30/12/2020 C18 Industrial Engine WRH00001-UP(SEBP3816 - 85) - Documentación

End By:

a. Install the water temperature regulator housing. Refer to Disassembly and Assembly, "Water Temperature
Regulator Housing - Remove and Install".

b. Install the exhaust manifold. Refer to Disassembly and Assembly, "Exhaust Manifold - Remove and Install".

c. Install the valve mechanism cover base. Refer to Disassembly and Assembly, "Valve Mechanism Cover Base -
Remove and Install".

d. Install the electronic unit injectors. Refer to Disassembly and Assembly, "Electronic Unit Injector - Install".

e. Install the camshaft gear. Refer to Disassembly and Assembly, "Camshaft Gear - Remove and Install".

f. Install the aftercooler, if necessary. Refer to Disassembly and Assembly, "Aftercooler - Install".

C opyright 1993 - 2020 C ate rpillar Inc.


W e d De c 30 2020 11:56:27 GMT-0500 (hora e stándar orie ntal)
Todos los de re chos re se rvados.
R e d privada para lice nciados de l SIS. pvalde z

https://sis.cat.com/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/mediasearch/mediaheaderinfoframeset.jsp&calledpage=/sisweb/sis… 6/6

You might also like