Ouantity Eguipment
2 ea. Balanced Pressure Proportioning Pump Skids to inelude the following:
1 ea. Foam concentrate pump, electric motor driven, rated 45 gpm at
200 psi
1 ea. Foam concentrate pump, diesel engine driven, rated 45 gpm at
200 psi
1 ea. Foam pump controller, electric drive
1 ea. Foam pump controller, diesel drive
1 ea. Pressure balancing valve
1 ea. Ratio flow controller, 4" Proportioner, 3%FP (ANGUS FP-70)
2 ea. Pressure relief val ves
1 lot Control val ves, interconnecting piping, pressure gauges, etc. to
make complete functioning skid.
2 ea. Foam Concentrate Storage Tanks, 1050 Gallon Capacity
2 ea. Flexible Connections, Model CVMC2.0, Zn Plated, 2", Flanged
2 ea. Flexible Connections, Model CVMC2.5, Zn Plated, 2.5", Flanged
TABLE OF CONTENTS
SECTION 1................... Manual - Balanced Pressure Proportioning Pump Skid
SECTION 4 ............. ..... .Manual - Foam Concentrate Pump Controller, Diesel Drive
SECTION
,.:-'
5 ................... Manual- Foam Concentrate Pump Pressure ReliefValve
CflEMGUARD I , I I I , I I
! N e o R POR A T E o
BALANCED PRESSURE
PROPORTIONING SYSTEMS
rHEMGUARD,~ 204 S. 6th Aven"e • MansOeld,Texas, USA 76063 • (817) 473-9964 • FAX, (817) 473-0606
- - - - - - - - - - - - - - - - BALANCED PRESSURE PROPORTlONING SYSTEM
TABLE OF CONTENTS
CHAPTER 1 - INTRODUCTION
CHAPTER 2 ·INSTALLATION
CHEMGUARDIIl":. 204 S. 6th Avenue • Mansfield. Texas. USA 76D63 • (Si?) 473·9964 • FAX: (817) 473-0606
- - - - - - - - - - - - - - - - - BALANCED PRESSURE PROPORTIONING SYSTEM
CHAPTER 5 - TROUBLESHOOTING
6-1 Figure 2-1 Balaneed Pressure Skid Pak with 21/2" - 8" (3% Proportioning).............................................. 6-1
Figure 2-2 Balaneed Pressure Skid Pak with 21/2" - 8" Ratio Controller (6% Proportioning).................... 6-2
Figure 3-1 Operating Sehematie Drawing................................................................................................... 6-3
CHEMGUARO.Nt: 204 S. 6th AvenuE • Mansfield, Texas, USA 76063 • (817) 473-9964 • FAX: (817) 473-0806
- - - - - - - - - - - - - - - - - BALANCED PRESSURE PROPORTlONING SYSTEM 1-1
CI-IAPTER 1 - INTRODUCTION
CHEMGUARD, INC.
Fire, hazardous material spill, or any other emergeney serviee Chemguard, Ine. can provide is
available 24 hours a day, 365 days a year. A "GuardianAlert"TM Emergeney eall will be handled by
a qualified Chemguard, Ine. professional who will respond to your needs and satisfy your
requirements for emergeney foam, equipment or serviee, and work with you until the emergeney
is under control.
Call the "GuardianAlert"TM telephone number anytime, anywhere in the world for Chemguard, Ine.
emergeney serviee or produets.
"GuardianAlert"TM
817-473-9964
E-mail: info@ehemguard.eom
CHEMGUARD,NC 204 S. 6th AvenUE • Mansfield, Texas. USA 76063 • (BH} 473·9964 • FAX: (817) 473-0606
- - - - - - - - - - - - - - - - BALANCED PRESSURE PROPORTIONING SYSTEM 1-2
o WARNING:This manual has been prepared as an aid and guide for personnel
involved in the installation, operation and maintenanee of a Chemguard,
Ine. Balanee Pressure Proportioning System. AII instruetions must be
read and understood thoroughly before attempting any installation,
operation or maintenanee to this system. Failure to follow any
instruetions eould result in personal injury ancl!or damage to this
equipment.
Various Danger, Warning, Caution and Note signal words appear in the Operating and
Maintenance Manual text which must be observed for safe personnel and equipment operation.
Signal word selection is base upon hazard classification.
The International Alert Symbol· O. is used with the signal word to gain and direct operating
personnel's attention to the signal word.
The following explains each signal word. Personnel operating and maintaining equipment must
familiarize themselves with each particular signal word's intent.
o DANGER signal words indicate an extremely hazardous situation which, if not avoided,
will result in death or serious injury to the operator.
O WARNING signal words indicate a potentially hazardous situation which, if not avoided,
could result in serious injury to the operator.
NOTE signal words indicate statements which must be observed for essential and
effective operating procedures, conditions, and statement
It is the responsibility of all personnel involved in the operating and maintenance of this equipment
to fully understand the DANGER, WANING, CAUTION, and NOTE procedures by which hazards
are to be reduced or eliminated. Personnel must become thoroughly familiar with all aspects of
safety and equipment prior to operation or maintenance of the equipment.
Operating and Maintenance instructions and layouts shall be posted at control equipment with a
second copyon file. AII persons who may be expected to inspect, test, maintain or operate foam-
generating apparatus shall be thoroughly trained in the functions they are expected to perform.
(NFPA 11, para 7-3, Operating Instructions and Training)
CHEMGUARD,M:. 2D4 S. 6th Avenue D Mansfield. Texas, USA 76063 • (817) 473-9964 • FAX: (817) 473-0606
- - - - - - - - - - - - - - - - - BALANCED PRESSURE PROPORTIONING SYSTEM 1-3
The Chemguard Balanced Pressure Proportioning System is designed to inject foam concéntrate
into the Water supply at the correct percentage. This system will automatically and accurately
proportion over a wide range of flows and pressures without manual adjustments.
The principleof operation is based on the use of a modified venturi proportioner commonly called
a ratio controller. As water flows through a jet at the inlet of the ratio controller, it creates a
reduced pressure area between the jet and a downstream section called a throat or receiver. This
reduction in pressure causes foam concentrate to flow through a foam concentrate metering
orifice and into the reduced pressure area.
As the water ñow through the ratio controller jet increases, so does the level of pressure
reduction, thereby affecting a corresponding pressure drop across the foam concentrate metering
orifice. This corresponding pressure drop results in a foam coneentrate flow whieh is
proportionate to the water flow through the ratio eontroller. As both the water and foam
concentrate ñow into a eommon redueed identieal water and foam redueed pressure area, it is
necessary only to maintain identieal water and foam eoneentrate pressures at the respective inlets
of the ratio eontroller.
Pressure sensing lines lead from the ratio eontroller foam eoneentrate sensing eonneetion and
water supplyline. upstream of the ratio eontroller, to the foam eoneentrate and water sensing
inlets on the diaphragm valve. The diaphragm valve automatieally adjusts the foam eoneentrate
pressure to eorrespond to the water pressure. A duplex gauge indieates balaneing of both the
foam eoneentrate and water pressures at the ratio eontroller.
For manual regulation, the diaphragm valve ls not required. The pressure of the foam
eoneentrate is adjusted to eorrespond to the water pressure by means of a manually operated
valve in the foam eoneentrate bypass piping.
Chemguard Balaneed Pressure Proportioning Systems are suitable for use with all foam
eoneentrates and either fresh or salt water.
• Ratio Controller - proportions quantity of foam eoneentrate required into the water supply.
Model size varies aeeording to foam system requirements. System may be supplied with
multiple ratio eontrollers.
• Foam Pump - with relief valve, driver and starter/eontroller. GPM and PSI pump rating vary
aeeording to foam system requirements. May be supplied with primary/seeondary foam
pumps (Eleetrie and/or diesel)
• Diaphragm Valve - balaneing valve. Maintains equal foam eoneentrate and water supply
pressures at ratio eontroller.
CHEMGUARD,ron: 204 S. 6th Avenue o Mansfield. Texas, USA 76063 • (817) 473-9964 • FAX: (817) 473-0606
- - - - - - - - - - - - - - - - BALANCED PRESSURE PROPORTIONING SYSTEM 1-4
Specification:
AH valving shall be arranged to permit routine checking of the foam concentrate pump and
driver and periodic circulation of foam concentrate in the skid piping.
The unit shaH be completely assembled and tested where possible, at the factory.
1. AH correspondence relating to this system should refer to the sales order number, file number,
user name and location.
2. Before instaHation is begun, the final plans and design data should be presented to the
authorities having jurisdiction.
3. Chemguard recommends that those individuals charged with designing, installing, operating,
testing and maintaining a foam fire protection system, or the replacement of equipment and/or
components of an existing system refer to the appropriate authority having jurisdiction for
compliance with applicable standard(s), code(s) and regulation(s) for that particular type of
system and its components.
5. The foamsystem provided is based on specific design requirements, that ls, products(s) being
protectedand area(s) of coverage. The design requirements may or may not have been
provided to Chemguard. Any changes to the area(s) of coverage or additions of other
products could exceed the design parameters of the system. Contact Chemguard's
Engineering Dept. for questions regarding changes to designo
6. Before operatlnq the system, the foam concentrate pump should be serviced in accordance
with the manufacturer's instaHation and maintenance sheets and the recommended start-up
procedures outlined in this manual.
rHEMGUARD~'.JC 204 S. 6th Avenue 11 Mansfíeld, Te:xas, USA 76063 • (B17) 473-9964 • FAX: (817) 473-0606
- - - - - - - - - - - - - - - - BALANCED PRESSURE PROPORTlONING SYSTEM 1-5
7. In accordance with the requirements of NFPA 11, Chemguard recommends that the system be
inspected and tested by qualified personal. Testing shall meet the approval of the authority
having jurisdiction, and as a minimum, shall be as outlined in NFPA 11 to insure that the
system has been properly installed and will function as intended. The services of a qualified
field engineer are available to perform this testing and inspection. Please contact
Chemguard's Service Department for additional details. If initial start-up tests are carried out
by persons not employed by Chemguard, please forward copies of the inspection test report
to the Chemguard Service Department.
8. AII electric:al installations and equipment must conform to the provisions of the National
Electrical Code and also all local codeso
o WARNING: Foams are not suitable extinguishing agents for fires involving
gases, liquefied gases with boiling points below ambient temperatures such
as butane, butadiene, propane, etc. or cryogenic Iiquids.
CHEMGUAB.D,
INCORPORATED
CHEMf;UARD""c.. 204 S. 6th Avenue • Mansfield. Texas, USA 76063 • (817) 473·9964 • FAX: (817) 473-0608
- - - - - - - - - - - - - - - - BALANCED PRESSURE PROPORTIONING SYSTEM 2-1
CHAPTER 2 -INSTALLATION
The serviees of a qualified field engineer are available to perform this testing
and inspeetion. If initial start-up inspeetion and test are earried out by
persons not employed by ehemguard lnc, please fouward copies of the
inspeetion test reports to Chemguard, Ine.'s Serviee Department.
Chemguard,lne. may supply eomponents sueh as a ratio eontroller, diaphragm valve, gauges,
controls, etc. for use in new or refurbished balaneed pressure systems. Chemguard, Ine. makes
no warranty,either expressed or implied and assumes no responsibility on the engineering and
design of sueh systems.
CHEMt;UARD,NC 204 S. 6th Avenue • Mansfield. Texas, USA 76063 • (817) 473-9964 • FAX: (817) 473-0606
- - - - - - - - - - - - - - - - BALANCED PRESSURE PROPORTIONING SYSTEM 2-2
NOTE: The following reeommendations are for materials whieh will be in eontaet with the foam
eoneentrates.
1. With Synthetic Based Polar SolventlAFFF and Conventional AFFF Foam Concentrates
a. Piping:
• Brass or Branze (Note: AII foam eoneentrate lines on standard Chemguard skid paks are
brass)
• Stainless Steel 304L or 316 grades
• High density polyethylene
• PVC
• Fiberglass with isophthalie based polyester and an internallayer (50-100 mils ,minimum)
of vinyl ester resin in eontaet with foam eoneentrate
b. veives:
• Brass or bronze. Cast brass valves filled with stainless steel (304L or 316 grades) or brass"
trim are aeeeptable. Teflon seats and paeking are preferable for foam eoneentrate serviee.
EPT (EPDM), Buna-N or Viton are also aeeeptable seal materíals for use with Chemguard
foam eoneentrates.
• Stainless steel304L or 316 grades
e. Storage Tanks:
a. Piping:
• Same materials as Synthetie Based Polar Solvent/AFFF and Conventional AFFF Foam
Concentrate with the exception of stainless steel
• Black steel pipe and malleable iron fillings
CHEMGUARDwr 204 S. 6th AvenuE • Mansfleld, Texas. USA 76063 • (817) 473-9964 • FAX: (817) 473·0606
- - - - - - - - - - - - - - - - BALANCED PRESSURE PROPORTIONING SYSTEM 2-3
b. Va/ves:
• Brass or bronze. Cast brass valves fitted with stainless steel (3D4L or 316 grades) or brass
trim are acceptable. Teflon seats and packing are preferable for foam concentrate service.
EPT (EPDM), Buna-N or Viton are also acceptable seal materials for use with Chemguard
foam concentrates.
c. Storage Tanks:
• Steel
• Same materials as Synthetic Based Polar SolventiAFFF and Standard AFFF Foam
Concentrate with the exeeption of stainless steel
Refer to Fig. :2-1 for a 3% proportioning system or Fig. 2-2 for a 6% proportioning system.
A. Site Selection
1. The proportioning skid should be located on a flat and level surface large enough to
support the entire skid frame.
B. OffLoading
1. Do notmove the skid using piping or installed equipment as a Iifting device. Use a crane
or other suitable Iifting apparatus to move the skid. Uft with a lift truck from the underside
of the skid frame.
C. Installation
rHEMGUARD,~ 204 S. 6th Aven"e • Manstield. Texas. USA 76063 • (B17) 473-9964 • FAX: (B17) 473-0606
- - - - - - - - - - - - - - - - BALANCED PRESSURE PROPORTlONING SYSTEM 2·4
1. The skid should be suitably ancho red to eliminate vibration and movement. Level and
shim as neeessary. Chemguard reeommends a elear distanee of 2 ft. (0.6096m) on the
pump end and 3 ft. (0.9144m) on the drive end be allowed by the installer to faeilitate
serviee/removal of the pump and motor.
NOTE:: AII field eonneetions, with the exeeption of the water/foam solution eonneetion at
the ratio eontroller, shall be flush with the edge of the base plate.
2. Remalle and diseard any shipping support braeket befare installing the skid unit into the
pipingsystem.
3. If not provided by Chemguard and to faeilitate future serviee/removal of the ratio eontroller,
the installer should provide a spool pieee upstream of the ratio eontroller. See ehart whieh
follows far minimum spool pieee lengths.
4. A minimum of five (5) pipe diameters of straight unobstrueted pipe is required upstream
and downstream of eaeh ratio eontroller.
5. AII intereonneeting piping must be self-supported. Plastie foam eoneentrate storage tanks
must have flexible eonneetion fittings installed between the tank and proportioning
equipment to eliminate stress imposed by the piping and to eliminate vibration.
6. Chemguard hydrostaetieally tests and where possible, flow tests all skid units befare they
leave the faetory. However, due to vibration and handling experieneed during transit, the
tightness of joints on tlle skid eannot be guaranteed. Therefore, Chemguard reeommends
that the installer hydrostatieally test the skid piping in aeeordanee with proeedures outiined
in the latest edition NFPA 11, befare introdueing foam eoneentrate into the system.
7. Flush the foam eoneentrate piping befare introducing foam eoneentrate into the foam
system. Refer to Chapter 4, Seet. 4-14 for foam eoneentrate piping flushing proeedures.
8. Flush tlle water lines and all foam solution lines. The foam solution lines shall be flíJshed at
or aboye design flow rates. The flushing shall be done prior to installing any foam makers,
sprinklers or nozzles.
CHEMC:;UARD,NC 204 S. 6th Avenue • Mansfield, Texas, USA 76063 • (817) 473-9964 • FAX: (817) 473-0606
- - - - - - - - - - - - - - - - BALANCED PRESSURE PROPORTlONING SYSTEM 2-5
NOTE: In order to remove foreign materials that may have entered during installation, water
supply mains, both under- ground and aboveground, shall be flushed thoroughly at the maximum
practical rateof flow before connection is made to system piping. The minimum rate of flow for
flushing shallnot be less than the water demand rate of the system, as determined by the system
designo The flow shall be continued for a sufficient time to ensure thorough cleaning. Disposal of
flushing water must be suitably arranged. AII foam system piping shall be flushed after
installation, using its normal water supply with foam forming materials shut off, unless the hazard
cannot be subjected to water f1ow. Where flushing cannot be accomplished, pipe interiors shall
be carefully visually examined for cleanliness during installation. (NFPA 11, para. 6-2, Flushing
After Installation)
9. After flushing, remove all strainer screens and clean. Reinstall screens after cleaning.
10. Check that the system is properly installed according to design with all necessary valves,
corree! pipe size, discharge device locations and is installed in compliance with local
codeso
11. Service foam concentrate pump before installation into the system. Service pump, reducer
and motor in accordance with the manufacturer's recommendations. Be sure that the
reducer is filled with oil and the pump and motor are lubricated. The pump body is coated
with a petroleum based rust preventative for protection during shipment. The pump drain
plug must be removed, anyexcess Iiquid drained and the plug reinstalled. The pump must
then be flushed with mineral spirits for approximately five (5) minutes and then drained.
Finally, it must be flushed with water. Always rotate the pump by hand to be sure it turns
freely before start-up, Never start-up the pump when it is dry. .
12. Check alignment of all pump and motor shaft couplings to manufacturer's
recommendations.
13. Check the foam concentrate pump motor and controller to insure it is wired properly.
14. Check the motor rotation to insure it is running in the correct direction to allow proper foam
concentrate pump rotation. "Bump" run the motor (and pump) by alternately actuating the
"ON" and "OFF" buttons until the direction of rotation is determined. Correct if necessary.
15. If the pump is driven by a gasoline or diesel engine, refer to the manufacturer's start-up and
installation instructions prior to using.
rHEMGUARO,~ 204 S. 6th Aven"• • Mansfi.ld. Texas, USA 76063 • (817) 473-9964 • FAX: (817) 473-0606
- - - - - - - - - - - - - - - - BALANCED PRESSURE PROPORTIONING SYSTEM 2-6
16. If the foam concentrate pump is driven by a gasoline or diesel engine, anti-vibration
connections must be installed in the foam concentrate line on both the inlet and outlet sides
of the pump. Also, anti-vibration fittings must be installed on the foam concentrate pump
base if the base is skid mounted.
17. If the system has automatic valves, check these valves to insure that they open and elose
properly
18. Place all valves in their standby position. Refer to Normal standby Valve Position Chart
on Operating Schematic Dwg. Fig.3-1.
19. It may be desirable to install shutoff valves between the foam concentrate storage tank and
the flexible connections in addition to Valves A & B, which are on the proportioning skid.
These valves will be useful if the foam concentrate piping has to be broken for repairs
between the tank and skid. The shutoff valves can be closed, thereby eliminating the need
to drain the tank before making repairs.
20. Install, clean and fill the foam concentrate storage tank in accordance with the
rnanutacturer's recommended procedures.
22. If applicable, check the relief valve for proper installation. See manufacturer's instructions.
23. Run a pump pressure output and relief valve pressure setting check as follows:
a. Starting with all valves in their normal standby position, open valves "A", "B" and "C" and
close valve "L".
b. Start foam concentrate pump; concentrate will recirculate back to foam tank.
c. Slowly close valve "C" and observe the red pointer on the duplex gauge until it shows a
sudden decrease. This will indicate opening of the relief valve. Adjust setting if required.
24. Return all valves to standby position and proceed with full system test as described in
Section 2-4, Testing Afier Installation in this manual.
NOTE: When system is supplied as loose components refer to the individual component's
manual forinstallation instructions.
NOTE: Although Chemguard offers skid units as shown in Fig. 2-1 and Fig. 2-2, when system
component parts are supplied as loose equipment, the customer may choose not to arrange
the components in a skid type unit but rather in their own individual piping configuration.
However, installation instructions in this manual must be followed to insure proper system
operation and to prevent possible system failure.
CHEMGUARO,M: 204 S. 6th Avenue • Mansfield, Texas. USA 76063 • (817) 473-996<1 • FAX: (817) 473-0606
- - - - - - - - - - - - - - - - BALANCED PRESSURE PROPORTlONING SYSTEM 2-7
Chemguard, Ine. is con cerned about the possibility tl1at any manually
operated valve(s) in the foam solution line to the hazard(s) eould inadvertently
be left in the elosed position during a fire eondition, whieh would prevent the
foam solution from reaehing the hazard(s) in the event of an automatie trip
sequenee.
1. If applieable, follow Sect. 2-2, Skid Mounled Proportioning Syslem, ílem A, Sile Seleelion
procedures.
2. A minimum of five (5) pipe diamelers of slraighl unobslrueled pipe is required upslream and
downslream of eaeh ralio eonlroller.
3. AII inlereonneeling piping musl be self-supported. Plaslie foam eoneenlrale slorage tanks
musl have flexible eonneelion fittings inslalled between lhe lank and proportioning
equipmenl lo eliminale slress imposed by lhe piping and lo eliminate lhe effecls of vibralion.
5. Proportioning syslem slrainer mesh shall have 1/4" openings for alcohol resistanl foam
concentratss and 1/8" openings for all other foam eoneenlrales.
6. If applieable, lhe foam eoneenlrale and waler sensing lines lo lhe diaphragm valve rnust be
a minimum 3/16" 1.0. pipe and lubing.
8. Follow reeommended procedures 6 thru 24 for skid mounted proportioning systems where
applicable. -
NOTE: Reference Sect. 2-2, item 19 - when the syslem is supplied as loose eomponents, it may
be desirable lo position valves A and B at the foam eoneentrate storage tank, between the tank
and lhe flexible eonneelions. This may eliminate the need for valves A and B plus shutoff valves in
the suetion and return piping. However, the need for valves A and B in place of tank shutoff valves
will have lo be evalualed on an individual system design basis. For questions or problem solving,
contact Chemguard, Ine. Engineering Department.
CHEMGUARDJNC 204 S. 6th Avenue • Mansfield, Texas. USA 76063 • (817) 473-9964 • FAX: (817) 473-0606
- - - - - - - - - - - - - - - - - BALANCED PRESSURE PROPDRTlDNING SYSTEM 2-8
Ball Drip Valves are used on a Balanced Pressure Proportioning System as an automatic
low point drain between the ratio controller and the water shutoff valve. l.lquld which
remains undrained between the ratio controller and the water shutoff valve could cause
pipe corrosion in this area. Also, if líquld is present in this area, the possibility of freezing is
another potential problem.
FOAM
WATER CONCENTRATE
A. Installation SHUTOFF VALVE WATER SUPPLY
TO
¡
·=
DRAIN 1 .
~~~ d::uum}:ium~:::"
= '
) CONTROLLER
BAlL DRIP VALVE .
PIPE
NOTE:
BALL DRIP VALVE MUST BE /NSTALLED
IN THE HORIZONTAL POSITION.
.Q
"...
\
. ./'7
3/4" THREADOLET
,¡:----.//
~
~
l
WELD ro 80rrOM OF PIPE
• 3/4" ELBOW (LOW POINT)
B. Maintenance .:f
no maintenance required ~ BALL DRIP VALVE
1. The completed system shall be tested by qualified personnel to meet the approval of the
authority having jurisdiction. These tests shall be adequate to determine that the system
has been properly installed and will function as intended. (NFPA 11, para. 6-3*,
Acceptance Test, latest edition)
2. Foam systems shall be examined visually to determine that they have been properly
lnstalled. They shall be inspected for such items as conformity with installation plans;
continuity of piping; removal of temporary blinds; accessibility of valves; controls, and
gages and proper installation of vapor seals, where applicable. Devices shall be checked
for proper identification and operating instructions. (NFPA 11, para. 6-1, Inspection and
Visual Examination, latest edition)
3. Beforeacceptance, all operating devices and equipment shall be tested for proper function.
(NFPA 11, para. 6-3.2, Operating Tests, latest edition)
CHEMGUARD,N:: 204 S. 6th Avenue • Mansfield, Texas, USA 76063 • (817) 473·9964. FAX: (817) 473-0606
- - - - - - - - - - - - - - - - - BALANCED PRESSURE PROPORTlONING SYSTEM 2-9
4. A full scale test shall be conducted after the system is installed and prior to acceptance of
the system. The test run shall include running water to each discharge device to insure that
proper pressures and flow rates can be achieved and to insure there is no blockage. Then
foam solution shall be run to the devices protecting the greatest singlehazard and to the
device with the lowest flow rate. The foam test shalllast a minimum of one (1) minute -
actual injection time - to insure the proportioning system has stabilized before taking
samples. At this time, the quality of the foam shall be observed and the foam solution
concentration shall be checked by the refractive index method. Conductivity measurement
is an acceptable alternative, consult Chemguard, Inc. Engineering Department for
additional assistance. The foam test shall be conducted for each ratio controller when
multiple proportioners are present in the system. See NFPA 11 tor detailed procedures.
5. Afier completion of acceptance test, the system shall be flushed and restored to
operational condition. (NFPA 11, para. 6-4., System Restoration, latest edition)
CHEMGUARD"
INCORPORATEO
rHEMGUARD,~ 204 S. 6th Aven"• • Manslield. Texas. USA 76063 • (817) 473-9964 • FAX: (817) 473-0606
- - - - - - - - - - - - - - - - BALANCED PRESSURE PROPORTIONING SYSTEM 3·1
1. Verify that all valves on the proportioning system are in their normal stand-by position.
Referto Operating Schematic Owg. Fig. 3-1.
3. If an auxiliary pump is provided, open appropriate pump suction vale "B1" or "B2".
NOTE: If the system ls automated, both valves "B1" and "B2" shall be open.
4. Verify that the diaphragm foam concentrate discharge valve "L" is in the open position.
This valve shall be open when the system is in its stand-by status.
5. Start the foam concentrate pump and observe the duplex gauge to be sure the foam
concentrate pump is building some pressure on the duplex gauge.
7. Open the foam concentrate discharge valve "O". If more than one proportioner is
provided, open appropriate discharge valve "O" to the corresponding proportioner. Verify
that pointers on the duplex gauge are balancing; if not, follow the procedures under
Manual System Override below.
In the event that the diaphragm valve fails, indicated by an imbalanced pressure on the duplex
gauge, the system can be balanced manually (Referto Operating Schematic Owg. Fig. 3-1):
1. Close the foam concentrate discharge valve "L" adjacent to the diaphragm valve.
NOTE: The manual concentrate bypass valve "C" is adjusted by either opening or closing
valve "C" and observing the Red Pointer (Foam Concentrate) and Black Pointer (Water) on the
duplex gauge. The system is balanced when the concentrate pressure corresponds to the
water pressure.
rHEMGUARD,~ 204 S. 6th Aven"e • Manstield. Texas. USA 76063 • 1817) 473-9964 • FAX: 1817) 473-0606
- - - - - - - - - - - - - - - - BALANCED PRESSURE PROPORTlONING SYSTEM 3-2
3-3 SHUTDOWN
3. Allow the water to run until clear water discharges from the devices being operated.
5. Place the foam solution zone discharge valve(s) in their normal stand-by position.
6. Afier flushing system solution piping, remove all strainer screens and clean. Reinstall
screens afier cleaning.
7. Return all valves to their stand-by status. Refer to Normal Stand-By Valve Position Chart
on Operating Schematic Dwg. Fig. 3-1.
o CAUTION: Only foam concentrate ot type Iisted on the tank nameplate should
be used to replenish the tank. Mixing of different types of foam concentrates
could cause failure of the system.
9. Replace all frangible components such as glass diaphragms, ruptured disc, etc., in foam
lines or foam making devices.
For automated systems, refer to the Automatic Operation or Control Panel section of the
Operating and Maintenance Manual for automatic operation and sequence.
CHEMGUARo.
INCORPORATED
CHEMGUARD,Nt: 204 S. 6th Avenue .. Manslield, Texas. USA 76063 • (817) 473-9964 .. FAX: (817) 473-0606
- - - - - - - - - - - - - - - - - BALANCED PRESSURE PROPORTIONING SYSTEM 3-3
3-5 MINIMUM INLET PRESSURE REQUIREMENTS
Since it is no! uncommon for water inlet pressures to be quite low in sorne systems applications, re"
is necessary to determine that the minimum proportioning system inlet pressure is adequate to
allow proper system operation. The curves in Fig. 3-2 indicate the minimum inlet pressure
required relative to the anticipated flow rate of the system. These curves apply to all proportioning
systems which utilize Chemguard ratio controllers.
PSI
1
'00
19:]
1
lOO 1
110
1
lOO
6" B"
'''' 4"
'''''
lJO 1 1 1
21/2" 1 3"
1m
110 1
~ 100
1 1 1 1 1
1 11
¡¡J
en '" I
w ao
a:
o. 70
11 1/
1
I:i:i '" / 1/
~ fiJ
/
ffi 40
V / / 1/
1- JO
~ 20
10
~ lOO W ~ ~ ~ ~ ~ 1~ ~ ~ ~ ~ ~ Q~
SOLUTION FLOW
FIGURE 3-2
RATIO CONTROLLER MINIMUM INLET PRESSURE VS. SOLUTION FLOW CHART
CHENfGUAB.D
INCORPORATEO
CHEMGUARDINC. 204 S. 6th Avenue • Mansfield, Texas. USA 76063 • (817)473-9964 • FAX: (817) 473-0606
- - - - - - - - - - - - - - - - BALANCED PRESSURE PROPORTlONING SYSTEM 4·1
See Table 4-1 far recommended inspection and maintenance procedures. These
procedures and recommended intervals are based on normal operating conditions and
may have to be modified to meet the existing conditions.
.. CAUTION: When cycling automated valves, make sure the main water valve,
Foam Concentrate Suction Valve "B" and Return Valve "A" are closed. After
cycling, return all valves to their normal standby position.
For various proportioning system components (diaphragm valve, foam concentrate pump,
valves, actuators, etc.) refer to that particular component's operating and maintenance
manual or instruction sheet far inspection and maintenance procedures.
NOTE:
The services of a qualified field engineer to inspect the system and run the test for start up and
the annual inspection can be provided. Additional details can be obtained by contacting the
Chemguard, Inc. Service Department.
If testing of the system for initial start-up is performed by other than Chemguard, Inc. personnel,
please forward a copy of the test report or letter stating that the system performed satisfactarily, to
Chemguard Inc. Service Department.
CHEMGUARD,M: 204 S. 6th Avenue • Mansfield, Texas, USA 76063 • (817) 473·9964 • FAX: (817) 473-0606
- - - - - - - - - - - - - - - - BALANCED PRESSURE PROPORTIONING SYSTEM 4·2
4-3 ANNUAL TESTING
No less than annually, all foam systems shall be thoroughly inspected and checked for proper
operation. This shall include performance evaluation of the foam concentrate or premix
solution quality or both. Deviation of results exceeding 10% from those recorded in acceptance
testing shall be discussed immediately with the Chemguard, Inc. Service Department. Regular
service contracts are recommended. The goal of the inspection and testing shall be to ensure
that the system is in full operating condition, and that it will remain in that condition until the
next inspection. The inspection report, with recommendations, shall be filed with the owner.
Between the regular service contract inspections or test, the system shall be inspected by
competent personnel following an approved schedule. (NFPA 11, para. 7-1, Periodic
Inspection, latest edition)
NOTE: The following recommendations are based on normal operating conditions. Due to
environmental or other conditions unique to your system, the frequency of sorne inspection and
maintenance procedures may need to be adjusted. Additional inspection and maintenance
procedures may also be required.
CHEMI.';UARDJIIJC. 204 S. 6th Avenue .. Mansfield, Texas, USA 76063 .. 1817) 473-9964 • FAX: (817) 473-0606
- - - - - - - - - - - - - - - - BALANCED PRESSUREPROPORTlONING SYSTEM 4·3
•
Check all valves to insure that they are in the
normai slandby conditlon. See System
O eratin Drawin Fi . 3·1
2. Inspecl system for h slcal damage and re airo
3. Check lhe complele systern, all vaives, filtings &
connections for leaka e.
4. Perform normal maintenance and inspection of
Ihe fire waler supply syslem lo Insure Ihat 11 wili
be o erational when re uired.
5. Perform Ihe after Inslallation lesl as prescrlbed in
Cha ler 2 Sec!. 2·4 01 Ihis manual.
6. Perfarm annual syslem test as prescrlbed in lhe
Cha ter 4, Sec!. 4·3 of lhis manual.
7. Flush proportioning system. See flushing Afier mainlenance
inslructions Chapler 4, sect, 4·14 of thls manual lopipIDg
8. Cele automaled valves where raclical.
9. Circulale Ihe foam concenlrale.
rHEMGUARD,~ 204 S. 6th Avenue • MansHeld, Texas, USA 76063 • (817) 473·9964 • FAX: (817) 473-0606
- - - - - - - - - - - - - - - - - BALANCED PRESSURE PROPORTIONING SYSTEM 4-4
, .. I
D!mil
Inspect the pressure vacuum vent to insure
that the poppets move Ireely, the screens are clean
and there Is no other dirt or blocka e.
rHEMGUARD,~ 204 S. 6th Avenue • Manslleld. Texas, USA 76063 • (B17) 473·9964 • FAX: (817) 473-0606
- - - - - - - - - - - - - - - - - BALANCéD PRéSSURé PROPORTlONING SYSTéM 4·5
•
Check the levei 01 cancenlrate In the tank.
Plasllc tanks do nal require a speciflc expansian
dome, bul shauid have a suilable allawance far
faam expansian and cantracllan. Steel and
s!ainiess steel tanks shauld be filled lo lhe mid
painl af lhe expansian dome. Reler lo Chemguard
manuals lar recammendatians far Chemguard
su lIed tanks.
2. Service the pressure vacuum venl in accardance
wilh lnstructlons aullined Sec!. 4-10 01 this manual.
3. Check lar rusl, carrasian, leakage, and weak
soots ar ather h sical dama e.
4. Check paly lank fianged fittings far leakage.
1.
•
Check lhal starage temperalure is wilhin
acceplable Iimils. Reler lo Chemguard
manuals far recammended lemperalures far
Chem uard laam cancentrale.
2. Sample laam cancentrate and submit sampie ta
laam manufacturer lo be lested lar sedlmentatian,
carrasian, dllutian, ar cantamlnalian. Refer ta
Chemguard manuals lar sampllng Inslrucllans.
•
1. Check lhal proper indicatars are presen!. See
control anel data.
2. Check su ervisian af all circults.
3. Check alarm o eratians.
4. Check s slem o erallans.
5. Check thal all indlcalars IlIuminate.
NOTE: Flushing is to be done only prior to refilling a depleted tank, changing type of foarn
concentrate, or if the foam concentrate piping has to be broken for repairs.
o CAUTION: If the tank is fuH of foam concentrate, the Tank Suction Valve "B" and Return
Valve "A" must be closed to prevent dilution of the foam concentrate.
NOTE: Refer to Operating Schematic drawing Fig. 3-1 for identification and location of
system valves.
1. Close foam concentrate tank supply valve "B" and foam concentrate tank return valve "A".
2. Close foam concentrate discharge valve(s) "D". Close all other proportioning system
valves.
CHEMGUARD,M: 204 S. 6th Avenue _ Manslield. Texas, USA 76063 • (817) 473-9964 • FAX: (817) 473-0606
- - - - - - - - - - - - - - - - BALANCED PRESSURE PROPORTlONING SYSTEM 4-6
a. Momentarily close manual concentrate bypass valve "C"; open and close several times.
9. Momentarily open the duplex gauge concentrate flush-out petcock, the duplex gauge water
ñush-out petcock and the foam concentrate discharge valve(s) "D". Then close petcocks
and valve(s), if available.
a. Stop concentrate pump, open the plugged connection on Strainer Flush-Out Connection
"U" and then close water supply valves.
b. Let system drain through Strainer Flush-Out Connection "U" and Flush-Out Connection
"T" remove strainer and clean. Close Strainer Flush-Out Connection "U".
c. Remove lower plug in concentrate pump, allow to drain and replace the plug.
d. Open all low point drains, allow to drain then close drains.
f. Return all valves to their normal stand-by position, Refer to Operating Schematic Dwg.
Fig. 3-1 with valve position chart and "stand-by" status.
11. Recirculate the foam concentrate briefly to insure that all air is removed from the
concentrate piping.
CHEMGUARD,Nr:. 204 S. 6th Avenue • Mansfield. Texas, USA 76063,. (817) 473-9964 • FAX: (817) 473-0606
- - - - - - - - - - - - - - - - - BALANCED PRESSURE PROPORTlONING SYSTEM 5-1
CHAPTER 5 • TROUBLESHOOTING
See Table 5-1 for Troubleshooting Problems, Possible Causes and Corrective Actions.
These procedures cover problems that may be experienced during normal operations.
Although these recommendations cover most problems that are experienced, there are
some situations that may occur which are not covered in these instructions. Please contact
Chemguard's Service Department for problems that cannot be resolved through the use of
this manual.
NOTE: Refer to individual instruction manuals or sheets for additional information on system
components and discharge devices.
5·2 No Tank Return Valve "A" and Tank Suction Check valve position on tank to insure
Proportioning Valve "B" at loam concentrate tank not that they are lully open. Open Valve(s) il
open. closed.
CHEMGUARD,M: 204 S. 6th Avenue • Manslield. Texas, USA 76063 • (BiT) 473-9964 • FAX: (817) 473·0606
BALANCED PRESSURE PROPORTlONING SYSTEM 5-2
5-2 No Aulomatic Foam Concenlrale Discharge Check that cylinder water pressure supply
Proportioning Valve "D" closed. (Water Powered Ball valve is fully open.
(continued) Valve)
Check OrainNent valve on strainer for
clogging which shuts off water supply lo
cylinder. Open OrainNenl valve on
stralner, venl and f1ush any debris
blocking waler supply.
Foam pump relief valve selloo low. Foam concenlrale allowed lo bypass
Ouplex gauge will show foam concenlrale lhrough relief valve al pressure lower
pressure lower lhan waler pressure. lhan waler pressure on supply line lo ralio
Pressure in foam concenlrate line will conlroller. Resel pump relief valve to
probably pulse. correcl pressure.
Manual Concenlrate Bypass valve "C" Check that manual bypass valve for
open (Diaphragm valve). diaphragm valve is closed complelely.
Foam concenlrale fiushing valve open or Ouplex gauge will show foam concéntrate
partially open. (Oiaphragm valve) pressure lower lhan waler pressure.
Check to insure flush valves are closed.
Orain valves in foam concentrate piping Ouplex gauge will show foam concentrate
open or partially open. pressure lower than water pressure.
Check to insure f1ush valves are closed.
. ,....
Control system nol functioning properly. Check wiring for correct inlerconnection
and proper connections. See control
system manual.
Concentrate not compatible with the Use correct concentrate. Oraln and clean
system. tank before filling with new concentrate.
Slrainer clogged. High vacuum reading on Blow down, remove strainer screen and
compound gauge. Pump will probably be clean.
very noisy due to cavitation.
Wrong size strainer basket. Replace with proper size strainer basket.
Water pressure loo high. Pump cannot Reduce water pressure to system
build sufficient pressure lo overcome IImilations. Reset pump relief valve 25
water pressure. psi higher than water pressure, provided
pump motor has sufficient horsepower to
drive the pump at a higher pressure
rating.
CHEMGUARD,fJC 204 S. 6th Avenue • Mansfield, Texas. USA 76063 • (817) 473-9964 • FAX: (817) 473-0606
BALANCED PRESSURE PROPORTIONING SYSTEM 5·3
5·2 No Low water pressure. Insufficient Delta P. Increase water pressure. Contact
Proportioning Chemguard Englneering Department lor
(continued) recommendations.
Foam concentrate storage tank empty. Fill tank. See manulacturer's instructions.
5·3 Low Percenl of Tank Suction Valve "B" alloam Check valve posltlon. Normal standby
Proportioning concentrate tank partially open. Pump posltlon ls lully OPEN.
should be nolsy due to cavltation.
Compound gauge willlndicate high
vacuum.
Manual Foam Concentrate Dlscharge Fully open valve. II syslem has dual
valve(s) "D" not lully open. Posslbly proportloners, be sure second discharge
blocked. valve lor proportioner not being used is
closed.
Manual Concentrate Bypass Valve "C" Check that bypass valve is completely
partially open (Diaphragm Valve). Duplex closed.
gauge will Indlcate low pressure.
CHEMGUARDIA.'C- 204 S. 6th Avenue • Mansljeld, Texas, USA 76063 • (817) 473-9964 • FAX: (817) 473-0606
BALANCED PRESSURE PROPORTIONING SYSTEM 5-4
5·3 Low Percent 01 Water pressure exceeds the design limits Adjust pressure to proportioner to be
Proportioning 01 the system. System requires more within Ilow and pressure limits 01 the
(continued) capacity than pump ts capable 01 system.
producing.
Flush-In Conneclion "S" open or partially Check to insure all Ilush connections and
open. Duplex gauge will show loam valves are closed.
concenlrate pressure lower than water
pressure.
Drain valves in loam concentrate piplng Check lo insure all drain valves are
open or partially open. Duplex gauge will closed.
show loam concentrate pressure lower
than water pressure.
Conlrol system not lunctioning properly. See control system manual. Check
wiring lor correct interconnection. Check
wiring lor proper connections.
Foam concentrate strainer clogged. High Remove strainer screen and clean.
vacuum reading on compound gauge.
Pump will probably be very noisy due to
cavitation.
Diaphragm valve not lunctioning properly. Check water sensing lines lor blockage.
Duplex gauge will not show balance. Make sure that there are no air pockets in
lhe water senslng IInes.
Diaphragm Valve water drain petcock Fully elose water drain petcock.
open.
Foam concentrate incompatible with Use only loam concentrates tor which
system designo the system was designed. Contact
Chemguard lf you are changlng loam
concentrates.
--
CHEMGUARD,= 20< S. 6th Avenve • Mansfietd. Texas. USA 76063 • (817) 473-9964 • FAX: (817) 473-0606
BALANCED PRESSURE PROPORTIONING SYSTEM 5-5
5-4 High Pereent 01 Tank RelumValve"A" al loam eoneenlrale Check valve position lo insure Ihal Valve
Proportioning lank nol open. "A" is open. Openvalve il closed.
Foam Concenlrale Discharge Valve "L" lo Open Valve "L" lo allow diaphragm valve
diaphragm valve closed. lo lunclion.
Diaphragm valve nol funclioning properly. Check loam concenlrale sensing Iines lor
Duplex gauge will nol show balance. blockage. Make sure Ihal Ihere are no air
pockels in Ihe loam concenlrale sensing
Iines.
Foam concenlrale incompalible wilh Use only loam concentrares lor which Ihe
systern designo syslem was designed. Conlacl
Chemguard il you are changing loam
concentrates,
Waler flow loo low lor ratio conlroller. Check syslem pressure. II low, lind and
correcl problem.
Foam concéntrate sensing line clogged. Remove sensing line and clean or
replace. Clean loam concenlrale sensing
orilice in ralio conlroller.
Blockage in Ihe waler supply or loam Find Ihe cause ollhe blockage and
solution discharge line. correcl.
Manual valves in solution plping shut or Check line lor blockage or open manual
blockage in line. valves.
CHEMGUARDwt:. 204 s. 6th AvenuE _ Mansfield, Texas, USA 76063 • (eH) 473·9964 • FAX: (eH) 473-0606
BALANCED PRESSURE PROPORTlONING SYSTEM 5-6
5-6 Low Flow at System pressure too low. Check inlet pressure and correct for
Discharge Device(s) proper operation.
5-7 Foam No power or incorrect voltage. Check that power is available and correct
Concentrate Pump voltage is available to all three motor
not Running legs.
5-8 No Operation Power failure Check power source and correct problem.
Control system not functioning properly. Check wiring for correct interconnection
and proper conneclions. See control
system manual.
Foam concentrate storage tank empty. FiII tank. See manufacturer's instructions.
Failure of water supply system. Check water supply and correct problem .
CHEMGUARDJNt: 204 S. 6th Avenue ID Mansfield, Texas, USA 76063 ID (aH) 473-9964 ID FAX; (817) 473-0606
pllpLEX gAUGE
NORMAL STAND·BYVALVE POSITION CHAAT mOf.l PROPOATlONER FROY PROPORTIONER
WATER PRESSURE WATER enassuna RED POINTER - FO"'" CONCENTRATE
:r: POSIllON EN51 BLACK P01NTER • WATER
~
VlLVE DESCRII"JlON
Fo.w COhCENlRA.TE TNI<RETURN
DESIGNAnON
A
IIANUlL
OPEN
AUTO.
OPEN "NID.~r _ í-.J- : 1'O ",
~
l:i
Fl),IJ,I (XH;EHTRATE T.w<SUCOON D
e
OPEN OPEN
TODW'tIRAGU V,tlVE >~ SHumE CHECK
UANUAl CONCENTRATE BYPASS ClOSEO CLOSED WATER CONNECTION' L''- REaUIRED WHEN lWO
Ii"'
~
¡
fOAIoI CONCENTRATE 0I5CHARGE
fOAll CONCENTRAre DISCIIARGE
D
L
ClOSED
OPEN
CLOSED
OPEN
PROPORnONERS ARE USED
DETAlL -P-
FlUSH.Qur :>- <FLUSH.QUT
SENSINGCONNECTlONS WATER
10 DIAPHRAGU VAlVE
I~::"~~
FORDUALPAOPOATIONEAS
ro
FlUSH·IN CONNECTION
nusaeut CONNECTIOH
•
T
ClOSED
CLDSEO
ClOSED
CLOSED "LV'
~
fI'
STRAIHER FLUSH OUT U CLOSEO ClOSEO
f
•
1·~ ~
FOil... CONC.
',USH·OUT
~
OAM CONCENTRATE STORAGETANK
'"
s
DlAPHRAGU VAlVE WATER
R..USH.()UT
CLOSED ClOSEO
.. CONC. CH......8ER
<
»
ro
DlAPHRAGU VALVE COHCENTRATE
FLUSH.(]UT
CLOSED CLOSEO
~ PRESSUREVACUUM va«
~
CONTRO~ER
L"'l~·
¡;: FO.W CONCENTRATE fAltl: SUCT10H ClOSED 4:l RATIO""t.- R
~"r,,---(D) .,,~
w
~
:Jl!./'DIAPHRAGMVAI: , __
•
~."\ ~:::~
§ I><l GATEVALVE lImS: < e-/ GE '{:
."
2! c9<J t. lIems shown dolled are .li-lt"ÑÓrr;NO.
,
BALL VAlVE(N.O.)
~
DpllDnal featulas and are FIELO '"'" AI!TOOIAnc ' '"<>
~
co
<b
..•
m
BALL VALVE (N.C.) nollurnished on 00 syslams. CONNECTlONS -;
- CllPl 1rVALVE
~
~
~
'" ~ MANUAL REGULATING VALVE (N.C.)
2. A1l plplng andvabes In the waler supply
IIna rmd the loam solution dlscJmga lito aro by otharr;. VAlVEV
5EENOTES
-n
» N SWING CHECK VALVE 3. Ifan Aulomallc Foam Concenlrale Dlschsrga Valva "D"
B
rs ".
x. ¡q""
~
is usedon Iha proportionIng S)'slom, the normal sland-by
§ -f«;;+ STRAINER poslUon 01 íhe .MinllAI. F08m Concenlrale Olscha1ge Valva "O" 15 !mJ.D.
:<~ :::!
.
~
2!
D.
"