Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 7

CURRICULUM VITAE

M.MILTON SUHUMAR ADDRESS: 3/858, VENUGOPAL NAGAR,

KATTUR,
TRICHY-620019.
CONTACT NO: 0431-2533016
MOBILE NO: +91- 9944112750
E-mail id: themilton30@gmail.com
-------------------------------------------------------------------------------------------------------------------
OBJECTIVE:
To play a constructive role in any organization I get involved. I seek a challenging
environment which encourages application of innovative ideas and that demands studious efforts
to arrive at solutions. I would like to hear more responsibilities to prove my effectiveness and
utility in the organization.

STRENGTH:

➢ Performed Ultrasonic Testing on piping and nozzles in petrochemical, oil and gas filled
Refinery.
➢ Performed Ultrasonic Testing on piping in detection of Corrosion, Erosions and Pitting’s.
➢ Performed Ultrasonic Testing’s in Weldments and Raw Materials of Tubular Towers.
➢ Performed Ultrasonic Thickness survey of Piping.
➢ Performed Radiographic Testing’s on required joints of pipelines at Ammonia Plant,
Sulphuric Plant, and Urea Plant.
➢ Personnel Certified Non Destructive Testing- UT 3.1 & 3.2 Level II(326281)
➢ Prepared corrosion mapping on site after the completion of Ultrasonic Testing.
➢ Knowledge of weld scans Drawings and Preparation of Report Manually.
➢ Knowledge different weld configuration drawing preparation.
➢ NDT UT, MT&PT Approved by QATAR GAS.
➢ PETRO RABIGH (KSA)Approved by NDT UT ,MT,PT,RT, Permit receiver.
TECHNICAL QUALIFICATION:

➢ PCN Level 2 – UT 3.1 & 3.2


➢ PCN No. 326281
➢ American Society for Non Destructive Testing in UT.
➢ American Society for Non Destructive Testing in RT.
➢ American Society for Non Destructive Testing in MT.
➢ American Society for Non Destructive Testing in PT.

EDUCATIONAL QUALIFICATION:
B.COM.
(BHARATHIDASAN UNIVERSITY)

COMPUTER SKILLS:

HDCA (MS Office, C++, FoxPro, Oracle, Visual Basic)

WORKING EXPERIENCE: 12 YEARS


EIL (UAE) with DPIS : MARCH ’2017 T0 APRIL’2017
QATAR GAS II Train-5 (SHUT DOWN)
EIL (UAE) with DPIS : JAN’2017 T0 MARCH’2017
QATAR GAS II Train-7 (SHUT DOWN)
EIL (UAE) with DPIS : APR’2016 T0 MAY’2016
QATAR GAS II Train-2,3 (SHUT DOWN)
EIL (UAE) with DPIS : FEB’2016 T0 MAR’2016
QATAR GAS II Train-6 (SHUT DOWN)
PETRO RABIGH(KSA) with in NDT CCS : SEP’2015 TO NOV’ 2015
SAUDI ARABIA (SHUT DOWN)
EIL (UAE) with DPIS : FEB’2015 T0 MAR’2015
QATAR GAS II Train-4 (SHUT DOWN)
HARIHAR ALLOYS (P) LTD : NOV’2013 TO JAN’2015
(Trichy)
ALL NATIONS - TAKREER : JUL’2011 TO AUG’2013
(Abu Dhabi)
NTPC : JULY 2010 TO SEP 2010
(Chattisgar India) (SHUT DOWN)
NPCIL : SEP 2008 TO DEC 2008
(Mumbai, India) (SHUT DOWN)
SIEVERT INDIA PVT LTD. : NOV’2009 TO DEC’2009
(Vizag, Andhra Pradesh) (SHUT DOWN)
NATIONAL INSPECTION SERVICES : OCT’2005 TO MAY’2010
(Trichy)
KGB NDT ENGINEERING SERVICES : MAR’2002 TO AUG’2005
(Trichy)

JOB RESPONSIBILITIES:

PETRO RABIGH KSA with in NDT CORROSION CONTROL SERVICES CO.

➢ Performed UT on Vessels , shell, reducer, column, Heater Coils, Nozzle.


➢ Performed UT on welds of (required joints).
➢ Performed MPI and LPI florescent method on the reactor of column, reducer
UT, MPI ,pressure vessels, knock out drums, reactors, air receiver, heat exchangers ,
piping and stream drum weld area.
➢ PT structures, pressure vessels, knock out drums, reactors, air receiver, heat exchangers ,
piping and reducer tubes.
➢ RT carried out on furnace piperack.
➢ Performed Visual inspection of online pipe using Isometric and P&ID.
➢ Performed Magnetic Particle Testing & Penetrant Testing on required pipelines on In
Plant piping.
➢ Corrosion monitoring on top side pressure piping systems.
➢ Corrosion mapping & grid mapping for specific wall loss areas & weak lines, Vessels &
Equipment.

EIL (UAE) with in JV DARWISH PETROEUM &Industrial services:


(QATAR GAS II Train-2,3,4,6 & 7)
➢ Performed UT on welds of (required joints).
➢ Performed UT on Heater Coils, Nozzle.
➢ Performed MPI and LPI florescent method on the reactor of column.
➢ UT, MT&PT structures, pressure vessels, knock out drums, reactors, air receiver, heat
exchangers and piping.
➢ MPI carried out on stream drum weld area.
➢ Performed Visual inspection of online pipe using Isometric and P&ID.
➢ Performed Magnetic Particle Testing & Penetrant Testing on required pipelines on In
Plant piping.
➢ Corrosion monitoring on top side pressure piping systems.
➢ Corrosion mapping & grid mapping for specific wall loss areas & weak lines, Vessels &
Equipment.
HARIHAR ALLOYS (P) LTD:

➢ Performed UT lamination check on raw materials Square Bars, Round corner square
bars, Round Bars
➢ The incoming raw material is tested for UT, MPI and proper composition using an optical
emission spectrometer which helps in final quality product.
➢ Magnetic Particle Test for the forged components, machined components as per the
customer requirements. Methods: Wet fluorescent, Non fluorescent
➢ Ultrasonic Test for the forged components, measure thickness as per the customer
requirements.
➢ Liquid Penetrant Testing for Forged and machined components as per the customer
requirements.
➢ Ultrasonic Test for the forged components after heat treatment, measure thickness as per
the customer requirements.

ALL NATIONS CO., LTD, ABUDHABI:


ABU DHABI OIL REFINING COMPANY (TAKREER)
➢ (TOFD & PHASED ARRAY) for spheres automated ultrasonic test procedure.
➢ UT Weld Scan – Shear Wave
➢ Performed M-UT and A-UT on sphere tank (ball tank).
➢ M-UT - lamination check
➢ To ensure pipe integrity of Oil and Gas Separation Plant
➢ Carried out UTG in peculiar small bore pipes.
➢ Performed storage tank and sphere tank MPI
➢ Performed storage tank and sphere tank DPI
➢ Performed wall thickness measurement in various satellites

NTPC – NATIONAL THERMAL POWER CORPORATION LTD (CHATTISGAR,


INDIA)
➢ TG performed on Super Heater Coils Tubes.
➢ Coils tubes and socket welds DPI.
➢ UTG performed on CYCLONE Tubes and NOZZLES.
➢ Eddy current testing carried out on all tubes.

NPCIL –NATIONAL PETROLEUM CORPORATION OF INDIA LTD(MUMBAI)


➢ Performed UT on welds of (required joints).
➢ Performed UT on Heater Coils, Nozzle.
➢ Performed MPI and LPI florescent method on the reactor of column.
➢ UT, MT&PT structures, pressure vessels, knock out drums, reactors, air receiver, heat
exchangers and piping.
➢ MPI carried out on stream drum weld area.
➢ Performed Magnetic Particle Testing & Penetrant Testing on required pipelines on In
Plant piping.

SIEVERT INDIA Pvt Ltd :( HPCL-VR)

➢ Performed on Ultra sonic Thickness, Gauging in Drums, Tanks, Vessels, Thermal


Reactors, and Stream Drums.
➢ UTG on Stream Lines, Jacketed Lines, Sulphure Pit Lines, H2S Lines, Hydraulic Pipe,
Lines, Flare Lines
➢ UTG on Mud Drums, Stags, Column
➢ NDT on various kinds of materials like CS, SS, CuNi, Al, Bronze etc.
➢ Performed Ultrasonic Testing on piping and nozzles in petrochemical Refinery.
➢ Knowledge of Isometric Drawings and Preparation of Isometric Drawings Manual.

NATIONAL INSPECTION SERVICES:

➢ AF (ALTECH FABRICATORS) – Performed UT on weldments and raw materials


(lamination check) for all windmill tubular towers.
➢ TF (Tool Fab) – Performed UT on weldments raw materials (lamination check) for all
windmill tubular towers.
➢ BEI (Barakath Eng. Industries) – Performed UT on weldments raw materials
(lamination check) for all windmill tubular towers.
➢ BEPL (Baby Eng. Pvt.Ltd)-Performed UT, MT, PT on weldments of heat exchanger,
boiler drums (required joints) and raw materials.
➢ AEPPL (Anand Eng. Pvt. Ltd) – Performed UT on weldments raw materials
(lamination check) for all windmill tubular towers.
➢ NLC (Neyveli Lignite Corporation) – Performed UT on weldments of crawler,
discharge boom, receiving boom, crawler link etc.,
➢ EID Parry Ltd. – Performed Thickness Survey on Pipelines.
➢ Nagi Enterprises -UT on weldments for Nozzles and costing hub materials check etc.

KGB NDT ENGINEERING SERVICES:


➢ GB engineering Enterprises – Performed (RT) on weldments raw material,
Boiler Drums, Crawler link etc.
➢ Chettinadu Cements - perform RT, on weldements and pipelines, thickness survey.
➢ GAIL - Thickness Survey and Pipelines.
➢ STERLITE – Thickness Survey on Pipelines and Reactor
➢ L & T (Larsen & Turbo) - performed UT on weldments of crawler. Crawler link.

FAMILIARISATION WITH EQUIPMENT HANDLED:

UT Scanning : USM GO 50+, KRAUTKRAMER USM 35,


USM25, MODSONICEINSTEINIITFT, EC, EX10,
PX10,PX20,MODSONICGALILEO,
SITESCAN140,OLIMBUS,OMNISEANMX2
(TOFD & PHASED ARRAY)
UT Thickness Survey : MODSONICDM4, PANAMETRIC26MG,
MODSONIC EDISON 1, Sona Test
Radiographic Testing : Tec hops, Rolli, Spec 2T (Ir192)
Magnetic Particle Testing : AC & Permanent Yoke, AC & HWDCProd,
SIMS Yoke AC/DC
Liquid Penetrant Testing : Visible Solvent Removable method,
Fluorescent Water washable method.
PERSONAL DETAILS:

FATHER’S NAME : MICHAEL.R


DATE OF BIRTH : 30.04.1982.
NATIONALITY : INDIAN
LANGUAGE KNOWN : ENGLISH, TAMIL.
PASSPORT DETAILS:

OLD PASSPORT NO. : E8419679


VALID UPTO : 12/03/2014
PASSPORT NO : M2976573
VALID UPTO : 22/10/2024
DECLARATION:
I hereby declare that the information above is true to the best of my
Knowledge.

PLACE : Yours faithfully,


DATE : (MILTON SUHUMAR.M)

You might also like