DRAWING OF RCC CIRCULAR STORAGE TANK

CAPACITY OF TANK 225000 LITERS.


NOT TO SCALE

VENTILATOR
0.10 M

MAN HOLE COVER


H= 1.50
6.77
INLET 0.23
0.30 RING

4.00
4.30 M-30
8.50

G.L.

1.20 OUT LET


0
0.45
M-30
0.10
1.800 6.34 1.800
9.94

8.14

Executive Engineer,
IPH Division, Sunder Nagar.
K

NOT TO SCALE
Dia of tank (internal) 8.50 m
R= 6.77 m
h= 1.416667 1.50 m

MAN HOLE COVER Capacity of tank: 225000 Ltrs.


Taking height: 3.96 say 4.00
Dia of tank: 8.50
SQUARE
BEAM Capacity calculation:
0.785 d^2 3.96 225 cum
d^2 72.31
d 8.50 m
M-30
Thickness at top 0.20
Thickness at bottom 0.25 0.270

OUT LET H^2/Dt Ratio= 8.06

0.27

9.94 780
8.14 238
1018.00 631.16

ve Engineer,
sion, Sunder Nagar.
DETAIL OF MEASUREMENT
Detailed Project Report for Dehar and Multi Village Group Piped Water Supply Scheme for Part of
Sundernagar Block of Mandi District (H.P)
(S. H :- C/O RCC Circular Storage Tank 225000 Liters Litres Cap. At Alsu)

Sr. Description of items No. x L x B x H Quantity


No.
1 2 3 4 5 6 7
1 Excavation in foundation and
trenches etc.in earth work in
Pick Jumper work.

For Storage Tank 22/28 x 9.94 x 9.94 x 1.20 93.16 Cum


For Scour arrangement 10 x 0.70 + 0.60 x 1.20 7.80 Cum
2
Total :- 100.96 Cum
2 P/L C.C.M-15 (not weaker than
1:3:6) in foundation & plinth.
For Storage Tank 22/28 x 9.94 x 9.94 x 0.10 7.76 Cum
3 P/L R.C.C. M-30 (Not weaker than CC
1:1.5:3) .
(i) In foundation and plinth
(a) In footing 3.1429 x 8.14 x 1.80 x 0.27 12.43 Cum
(b) Inner base slab 22/28 x 6.34 x 6.34 x 0.10 3.16 Cum
Total:- 15.59 Cum
(ii) Walls (any thickness but not
less than 0.1 m thickness)
plinth and string courses.

(a) Vertical Walls 3.1429 x 8.70 x 0.24 x 4.00 25.70 cum.


4 (a) Ring Beams : 3.1429 x 8.73 x 0.23 x 0.23 1.45 cum.
4(b) Dome slab: 2x 3.1429 x 6.77 x 1.50 x 0.10 6.38 Cum
(v) Crown ring beam 3.1429 x 0.95 x 0.20 x 0.20 0.12 cum.
Total :- 6.50 cum.
5 Providing Tor Steel
Reinforcement :-
(a) In base slab , 15.59 90 Kg./Cum 1403.00 Kg.
(b) In beams & walls:- 27.15 90 Kg./Cum 2444.00 Kg.
(c) In Dome 6.50 90 Kg./Cum 585.00 Kg.
Total:- 4432.00 Kg.
6 Providing Form work with steel
plates.
(i) Foundation and plinth: 3.1429 x 9.94 x 0.27 8.43 Sqm.
(ii) In Vertical walls:-
(a) Inner side:- 3.1429 x 8.50 x 4.00 106.86 Sqm.
(b) Outer side:- 3.1429 x 8.97 x 4.00 112.77 Sqm.
Total:- 219.62 Sqm.
(iii) In beams:
(a) Sides 2x 3.1429 x 8.73 x 0.23 12.62 Sqm
(b) Soffit: 1x 3.1429 x 8.73 x 0.03 1.65 Sqm
Total:- 14.27 Sqm
7 Providing Form work with
ordinary timbers.

(i) In Dome slab:


2 3.1429 x 6.77 x 1.50 63.84 Sqm.
Less for man hole: 3.1429 x 0.56 2 Nos. (-) 0.49 Sqm.
Total:- 63.35 Sqm.
8 P/F Man Hole Cover with 2 Nos.
Frame of 560 mm dia.
9 P/F Connecting Pipes:-
(a) Inlet pipe:- 200 mm = 6 Rmt.
(b) Outlet pipe:- 200 mm = 6 Rmt.
© Scour pipe:- 200 mm = 10 Rmt.
10 P/F Cast Iron Sluice Valves:-
(a) In Let Valve 200 mm = 1 No.
(b) Common Header Valve 200 mm = 1 No.
(c) Scour Valve 200 mm = 1 No.
11 Steel work welded in built up
sections,trusses and framed
work
(i) In Ventilator work
Verticals MS angles ISA 6 Nos. 0.75 x - 3.80 17.10 Kg.
50x50x5
Angle Rings at Top & Bottom 2 Nos. 3.142 x 0.75 3.80 17.91 Kg.
ISA 50x50x5
MS Sheet Cap over ventilator 2x 3.14 0.75 x 0.45 12.55 26.62 Kg.
(ii) In Ladder (outer
MS Angle 50x50x6mm @ 4.50 4 x 6.00 x 4.50 = 108.00 Kg
Kg /mtrs.
MS Angle 40x40x5mm @ 3.00 52 x 0.90 x 3.00 = 140.40 Kg
Kg /mtrs.(26 steps x 2 Nos.)
MS Flats 20 x 5 mm @ 0.80 Kg/ 468 x 0.25 x 0.80 = 93.60 Kg
mtrs (26 steps x 18 Nos.)
(iii) Landing
Vertical angles 50x50x6mm @ 4 x 4.50 x 4.50 = 81.00 Kg
4.50 Kg/mtrs.
MS Angle 40x40x5mm @ 3.00 8 x 0.90 x 3.00 = 21.60 Kg
Kg /mtrs. (2 Nos.)
MS Flats 20 x 5 mm @ 0.80 Kg/ 36 x 0.90 x 0.80 = 25.92 Kg
mtrs (Both Side)
(iv) Railing
MS Pipe 32 mm dia 1.52 2 x 11.04 x 1.52 = 33.56 Kg
Kg/mtrs.
Square Bar 12 mm dia @ 1.13 40 x 0.90 x 1.13 = 40.68 Kg
Kg/mtrs.
Total :- 606.39 Kg
or 6.06 Qtls.
12 Providing and Fixing Wire
Gauge for Ventilator in all leads
and lifts.
1 No. 3.142 x 0.75 x 0.75 1.77 Sqm
13 Finishing walls with water
proofing cement paint of
approved brand and
manufacture of required shade
on undecorated wall surface
( two coats) to give an even
shade after throughly brushing
the surface to remove all
dirt,dust and remains of loose
material sand papered,stopping
complete in all respect.
Outer wall above GL(incl. RB) 1 No. 3.142 x 8.77 x 2.83 77.98 Sqm
Dome Outer face (as per Item No. 06) 63.35 Sqm
Total :- 141.33 Sqm
14 P/L C.C.M-15 (not weaker than 3.1428 x 10.54 x 1.50 x 0.15 7.45 cum.
1:3:6) in foundation & plinth. (as
plinth protection)

15 Boulder filling dry hand packed 3.1428 x 10.54 x 1.50 x 0.15 7.45 cum.
tightly under floors.(in plinth
protection
16 P/F Aluminimum Ladder 1 No.
450mm wide.

Executive Engineer
I&PH Division Sunder Nagar.
ABSTRACT OF COST
Detailed Project Report for Dehar and Multi Village Group Piped Water Supply Scheme for Part of
Sundernagar Block of Mandi District (H.P)

(S. H :- C/O RCC Circular SR of 225000 Litres Cap. At Alsu)

Sr. Description of items Quantity Rate Unit Amount


No.
1 2 3 4 5 6
1 Excavation in foundations, trenches etc. in all kinds 100.96 Cum 436.00 Per Cum 44018.00
of soil such as pick jumper work blasting and
chiselling soft/ hard reock where blasting is
prohibited in all leads and lifts i/c trimming &
dressing of side levelling of bed stacking the
excavated soil in 15 Cm layers when required in to
sides of foundation etc. including consolidating
each deposited layer by ramming and watering and
then disposing of all surplus excavated soil as
directed in all leads and lifts and soring strutting
timbering & dewatering where ever required
complete in all respect as per the direction & to the
entire satisfaction of Engineer in Charge.

2 Providing and laying cement concrete M 15 (Not 7.76 Cum 5581.00 Per Cum 43326.00
Leaner than CC 1:3:6, 1 cement:3 sand:6 graded
stone aggregate 40 mm nominal size) and curing
complete excluding cost of form work in foundation
and plinth in all leads and lifts.
3 Providing and laying cement concrete in M 30
grade but not leaner than 1:1.5:3 (1 cement : 1.5
sand : 3 graded stone aggregate 20 mm nominal
size) and curing complete excluding cost of form
work and reinforcement and reinforced concrete
work in :-

(a) Foundations and Plinth in all leads and lifts. 15.59 Cum 6396.00 Per Cum 99724.00
(b) wall (any thickness but not less than 0.1 m 25.70 Cum 6440.00 Per Cum 165523.00
thickness) attached pillasters, buttresses, plinth
and string courses, etc. from top of foundation level
upto floor two level.

4 Providing and laying cement concrete 1:1.5:3


(1cement:1.5 sand : 3 graded stone aggregate 20
mm nominal size) and curing complete excluding
cost of form work and re-inforcement for reinforced
concrete work in:
(a) Beams, cantilivers, girders and lintels sides and 1.45 Cum 6462.60 Per Cum 9380.00
soffits of beams,beam haunchings cantilivers,
girders, bressumers and lintels not exceeding 1
metre in depth in all leads and lifts.

(b) suspended floor, Dome roofs, landings shelves 6.50 Cum 6462.60 Per Cum 42029.00
and their supports balconies, beams, girders
,bressumers and cantilevers etc in all leads and lifts
of any shape in all leads and lifts.
5 Providing tor steel reinforcement for R.C.C. work 4432.00 Kg. 73.00 Per Kg 323536.00
including bending, binding and placing in position
complete upto floor two level in all leads and lifts.
Sr. Description of items Quantity Rate Unit Amount
No.
6 Providing form work with steel plates 3.15 mm thick
welded with angle iron in frame 30x30x5 mm so as
to give a fairfinish I/c centring , shuttering , strutting
and proping etc.with wooden battens and ballies,
height of propping and centring below supporting
floor to ceiling not exceeding 4m and removal of
the same for insitu- reinforced concrete & plain
concrete work in :-

(a) Foundations, footings, basis of columns & the like 8.43 Sqm. 238.50 Per Sqm 2011.00
and mass concrete in all leads and lifts.
(b) Beams, cantilivers, girders and lintels sides and 14.27 Sqm. 416.70 Per Sqm 5945.00
soffits of beams,beam haunchings cantilivers,
girders, bressumers and lintels not exceeding 1
metre in depth in all leads and lifts.
(c) Vertical surfaces such as walls (any thickness), 219.62 Sqm. 304.90 Per Sqm 66963.00
partitions and the like including attached pillasters,
buttress,plinthand string courses and the like in all
leads and lifts.
7 Providing form work of ordinary timber plankings so
as to give a rough finish including centering
,shuttering, propping etc. height of propping and
centering below supporting floor to ceiling not
exceeding 4 meters and removal of the same for-in-
situ reinforced concrete and plaiin concrete work
in:-

(d) Arches, domes, vaults up to all span in all leads 63.35 Sqm. 3255.20 Per Sqm 206208.00
and lifts.
8 Providing & fixing precast concrete manhole cover 2 Nos. 2090.20 Each 4180.00
& frame conforming to IS-12593-1988,part-I and IS
12592-1991, part-II, 560mm diameter , medium
duty in all leads and lifts.

9 Providing and Laying in trenches,4.00 mm Thick


MS Pipes as per ISO:3183 with all specials like
Tees, Bends, Reducers, Nipples etc. (earth work to
be measured and paid for separately)

(a) Inlet pipe:-200mm 6.00 M 3113.00 Per Rmt 18678.00


(b) Outlet pipe:-200mm 6.00 M 3113.00 Per Rmt 18678.00
© Scour pipe:-200mm 10.00 M 3113.00 Per Rmt 31130.00
10 Providing and fixing C.I. Sluice valve (with hand
wheel) as per IS:780 Class-I upto 300 mm dia
(including brass spindleand as per IS:2906 class II
for diameters more than 300 mm complete with
bolts, nuts, rubber insertion etc,(The tail pieces if
required shall be measured and paid for
separately)

(a) In Let Valve 200 mm 1 No. 59952.00 Each 59952.00


(b) Common Header Valve 200 mm 1 No. 59952.00 Each 59952.00
(c) Scour Valve 200 mm 1 No. 59952.00 Each 59952.00
11 Steel work welded in built up sections,trusses and 6.06 Qtls 8274.90 Per 50179.00
framed work including cutting,hoisting, fixing in Quintals
position and applying a priming coat of red lead
paint :- in gratting, framed guard bar, ladders,
railing brackets and similar works in all leads and
lifts.

12 Providing and Fixing wire gauge using galvanised 1.77 Sqm. 156.10 Per Sqm 276.00
M.S. wire gauge of I.S. gauge designation 85 G.
with wire of dia 0.56 mm for Ventilator of tank
complete in all respect in all leads and lifts.
Sr. Description of items Quantity Rate Unit Amount
No.
13 Finishing walls with water proofing cement paint of 141.33 Sqm. 73.85 Per Sqm 10437.00
approved brand and manufacture of required shade
on undecorated wall surface ( two coats) to give an
even shade after throughly brushing the surface to
remove all dirt,dust and remains of loose material
sand papered,stopping complete in all respect.

14 P/L C.C M-15 (not weaker than CC 1:3:6) in 7.45 Cum 6114.14 Per Cum 45570.00
foundation & plinth. (as plinth protection)

15 Boulder filling dry hand packed tightly under floors. 7.45 Cum 2607.70 Per Cum 19436.00
(in plinth protection
16 P/F Aluminimum Ladder 450mm wide of 1 No. 10000.00 Each 10000.00
rectangular section 65mmx 35mm having length
3.60m to 4.80m in all lead and lifts to the entire
satsfaction of Engineer-in-Charge.

G. Total :- 1397083.00
Add 10% for Site Development 10.00 % of Basic cost 139708.00

G. 1536791.00
Total :-

Executive Engineer,
I&PH Division, Sunder Nagar.