Sno Chainage OGL FRL Proposed structure Chainage Existing structure FRL Remarks
1of 5
Vasishta Constructions Pvt. Ltd.
CONSTRUCTION H.L.BRIDGE OVER RIVER GANDAK SATTARGHAT,MOTIHARI (BIHAR)
Details Measurment
Chainage OGL FRL Proposed structure Chainage Existing structure FRL Remarks
4of 5
3765 98.477 104.202
3780 98.685 103.889
3795 98.656 103.576
3810 98.596 103.263
3825 98.772 103.000
3840 98.800 103.000
3855 98.681 103.000
3870 98.377 103.000
3885 98.57 103.000
3900 98.361 103.000
3915 99.055 103.000
3930 99.214 103.000
3945 99.221 103.000
3960 99.361 103.000
3975 99.111 103.000
3990 98.72 103.000
4005 98.529 103.000
4020 97.996 103.000
4035 98.041 103.000
4050 98.547 103.000
4065 98.616 103.000
4080 98.687 103.000
4095 98.72 103.000
4110 98.339 103.000
4125 98.889 103.000
4140 98.82 103.000
4155 98.673 103.000
4180 98.582 103.000
4195 98.702 103.000
4210 98.63 103.000
4225 98.77 103.000
4240 98.088 103.000 Ch@ 4248 to 4498, 250mts
4255 98.08 103.000
4270 97.83 103.000
4285 96.771 103.000
4300 97.717 103.000
4315 98.954 103.000
4330 99.271 103.000
4345 98.949 103.000
4360 98.592 103.000
4375 98.761 103.242
4390 99.065 103.484
4405 99.905 103.726
4420 99.972 103.242
4435 99.939 103.484
4450 99.890 103.726
4465 99.831 103.968
4480 99.750 104.210
4495 99.062 104.452
4510 99.517 104.694
4525 99.569 104.936
4540 99.471 105.178
4555 99.355 105.420
4570 99.315 105.662
4585 99.262 105.904
4600 98.720 106.146
4615 98.720 106.388
4630 98.407 106.630 Ch@ 4630 to 4705, 75mts
4645 98.611 106.872
4660 99.019 107.114
4675 99.425 107.356
4690 99.675 107.598
4705 99.991 107.840
4720 100.130 108.082
4735 100.105 108.180
4740 100.094 108.180 Major Bridge Existing FRL 108.180