1. GENERAL INFORMATION
3. FINANCIAL CAPACITY
4. ORGANIZATIONAL CHART
5. COMPANY RESOURCES
6. COMPANY ACHIEVEMENT
1. GENERAL INFORMATION
7 0 3 C O N S T R U C T I O N A N D I N V E S T M E N T J O I N T S T O C K C O M PA N Y
Business office: CT1 building, Ngo Thi Nham, Ha Cau Ward, Ha Dong District, Hanoi City.
Tel: 024.3755.5418 Fax: 024.3755.1488 Hotline: 0968.702.221
Email: 703coinco@gmail.com Website: www.coinco703.com.vn
1. GENERAL INFORMATION
1.1 Name of Company
- The full name: 703 CONSTRUCTION AND INVESTMENT J.S.C (COINCO 703)
- Logo:
2. BUSINESS REGISTRATION
CERTIFICATE
3. FINANCIAL CAPACITY
703 CONSTRUCTION AND INVESTMENT JOINT STOCK COMPANY
Address: CT1 Building, Ngo Thi Nham, Ha Cau Ward, Ha Dong District, Hanoi City
Tel: 024.3755.5418 Fax: 024.3755.1488
Email: 703coinco@gmail.com Website: www.coinco703.com.vn
3. FINANCIAL CAPACITY
------------------------------------------------
FINANCIAL CAPACITY
Summary of consolidated financial at the end of 2017
Address: No. 11, Van Phuc road, Van Phuc ward - Ha Dong district, Hanoi city
Unit: VN Dong
------------------------------------------------
FINANCIAL CAPACITY
Summary of consolidated financial at the end of 2018
Address: 2nd floor, Ngo Thi Nham , Ha Cau ward - Ha Dong district, Hanoi city
------------------------------------------------
FINANCIAL CAPACITY
Summary of consolidated financial at the end of 2019
Address: 2nd floor, Ngo Thi Nham , Ha Cau ward - Ha Dong district, Hanoi city
MANAGEMENT
BOARD
GENERAL
DIRECTOR
Accountant Dept.,
Equipment and
Material Dept.
Admin. Affair
Financing and
Management
Dept.
Dept.
CONSTRUCTION MATERIALS
CONSTRUCTION TRANSPORT
CIEC GLOBAL CORPORATION
CONSTRUCTION TEAMS
SUPPLYING & TRADE
217 EC TRADING AND
COMPANY
LIMITED
TEAM
7 0 3 C O N S T R U C T I O N A N D I N V E S T M E N T J O I N T S T O C K C O M PA N Y
Business office: CT1 building, Ngo Thi Nham, Ha Cau Ward, Ha Dong District, Hanoi City.
Tel: 024.3755.5418 Fax: 024.3755.1488 Hotline: 0968.702.221
Email: 703coinco@gmail.com Website: www.coinco703.com.vn
Board of Director
Mr. Trieu Hong Tuyen
Position: General Director Qualification: Engineer/MBA
5. COMPANY RESOURSE
5.1. MANPOWER
TECHNICAL CLASSIFICASION
WORKING YEARS
NO. CLASSIFICATION QUANTITY OVER 5 OVER 10 OVER 15 NOTE
YEARS YEARS YEARS
I Over University Level
1 Road and bridge engineers 34 16 08 10
Construction economic
2 05 01 02 02
engineers
3 Civil engineers 10 05 03 02
4 Mechanical engineers 09 03 04 02
5 Irrigation engineers 10 05 04 01
6 Electrical engineers 07 05 02
II College level
1 Transport college 15 06 05 04
2 Civil collège 03 02 01
3 Economic college 05 03 02
Total 98 44 32 22
WORKERS CLASSIFICATION
LEVEL HIGH
NO. Classification QUANYITY
LEVEL
3/7 4/7 5/7
1 Operation of plant workers 30 15 16 09
2 Driving workers 11 02 07 02
3 Driving machine workers 35 10 16 09
4 Road workers 140 36 59 45
5 Bridge workers 45 18 15 12
Mechanicals of machinery
6 05 02 01 02
and equipment
Total 266 83 114 79
I Transportation vehicle
Asphalt Concrete
II
Batching Plant
III Rollers
Excavator, Grader,
IV
Bulldozer
Wheeled Scratching
12 01 2.1m Japan 2000 Good
Vehicle - Sakai ER550F
7 0 3 C O N S T R U C T I O N A N D I N V E S T M E N T J O I N T S T O C K C O M PA N Y
Business office: CT1 building, Ngo Thi Nham, Ha Cau Ward, Ha Dong District, Hanoi City.
Tel: 024.3755.5418 Fax: 024.3755.1488 Hotline: 0968.702.221
Email: 703coinco@gmail.com Website: www.coinco703.com.vn
V Asphalt Paver
Spraying bitumen
2 05 5T Viet Nam 2010 Good
Equipment Cuu Long
7 0 3 C O N S T R U C T I O N A N D I N V E S T M E N T J O I N T S T O C K C O M PA N Y
Business office: CT1 building, Ngo Thi Nham, Ha Cau Ward, Ha Dong District, Hanoi City.
Tel: 024.3755.5418 Fax: 024.3755.1488 Hotline: 0968.702.221
Email: 703coinco@gmail.com Website: www.coinco703.com.vn
Generator, lightning
VII
tower
IX Laboratory
Laboratory LAS-XD521
implementation fully of
1 asphalt concrete tests 01 US 2014 Good
(Including of the wheels
trail test)
703 INVESTMENT AND CONSTRUCTION
JOINT STOCK COMPANY
6. COMPANY ACHIEVEMENT
7 0 3 C O N S T R U C T I O N A N D I N V E S T M E N T J O I N T S T O C K C O M PA N Y
Business office: CT1 building, Ngo Thi Nham, Ha Cau Ward, Ha Dong District, Hanoi City.
Tel: 024.3755.5418 Fax: 024.3755.1488 Hotline: 0968.702.221
Email: 703coinco@gmail.com Website: www.coinco703.com.vn
6. ACHIEVEMENTS
1 2 3 4 5 6 7
1 2 3 4 5 6 7
Package: Management
and maintenance of
access roads to the
Long Son
Southern Vietnam August February
16.113 16.113 Petrochemicals VN
Petrochemical Complex 2020 2023 Co., LTD
project under the Road
Maintenance Project in
2020-2022
Package ST-CW-01:
Construction of provincial
road 933B, Sub-project of
investment in
infrastructure construction
to serve production April
November PMU 2 of Soc
conversion in accordance 258.107 77.171 VN
2019 2022 Trang
with ecological
conditions, livelihood
improvement, and
adaptation Climate
Change in Cu Lao Dung
(ICRSL Project)
Package 4: Construction
of road surface, drainage
May PMU
works in section Km26- November
98.784 40.501 transport Binh VN
Km30, Coastal Road 2019 2021 Dinh
works (DT.639), Cat Tien
- De Gi section
Package XL01:
Construction and
Technical Design
Drawings Section :
Km0+000 +Km 15+000 August PMU of Ho
August
(including bridges: Lai 547.465 354.483 Chi Minh VN
2018 2021
Phuoc, Khe Ai Tu, Over Road
cross TL579), Component
Project of North –South
Expressway, East corridor
Period 2017 - 2020
7 0 3 C O N S T R U C T I O N A N D I N V E S T M E N T J O I N T S T O C K C O M PA N Y
Business office: CT1 building, Ngo Thi Nham, Ha Cau Ward, Ha Dong District, Hanoi City.
Tel: 024.3755.5418 Fax: 024.3755.1488 Hotline: 0968.702.221
Email: 703coinco@gmail.com Website: www.coinco703.com.vn
1 2 3 4 5 6 7
Package 2: Handling
potential points Traffic
accidents at
Km124 + 600 - Km124 +
900, Km145 + 900 -
Km146 + 500, Km153 +
00 - Km153 + 500, August January
9,319 9,319 PMU 3 VN
Km156 + 00 - Km157 + 2019 2020
200, Km173 + 00 -
Km173 + 800, Km175 +
200 - Km175 + 800
National Road 6, Hoa
Binh and Son La
Provinces.
Package 9: Construction
of foundation, paving and
drainage works from Km0
PMU
+ 00 - Km2 + 00, Project 54,057 22,429 June 2019 VN
March 2020 transport Binh
of National Road 19
Dinh
(section from Quy Nhon
Port to National Highway
1).
Package 6: Expanding
NH1A, Km1051+845 –
November January
Km1055+280 Section, 116,891 70,134 PMU 85 VN
2018 2020
Quang Ngai Province
Project.
Package 24: Overcoming
consequences of storms
and floods and
strengthening the
pavement structure of August January PMU Ho Chi
176,382 70,630 VN
Investment construction 2018 2019 Minh
NH1 project, Section:
Km1153+000 –
Km1212+400 Section,
Binh Dinh Province .
7 0 3 C O N S T R U C T I O N A N D I N V E S T M E N T J O I N T S T O C K C O M PA N Y
Business office: CT1 building, Ngo Thi Nham, Ha Cau Ward, Ha Dong District, Hanoi City.
Tel: 024.3755.5418 Fax: 024.3755.1488 Hotline: 0968.702.221
Email: 703coinco@gmail.com Website: www.coinco703.com.vn
1 2 3 4 5 6 7
Package 13: Paving
asphalt layer and
construction of traffic
safety system for
packages: 8, 9, 10, 11,
December March PMU Ho Chi
12: Section Km 228 +437 84,438 35,852 VN
2017 2018 Minh
-Km 248 +878
Project : Ho Chi Minh
HW, Section : Cho Moi –
Trung Son, Thai Nguyen
Province
Package 22: Construction
of asphalt pavement,
PMU
sidewalks and finishing
December December transport, Cai
items of Project: inter- 61,816 61,816 VN
2017 2018 Mep – Thi
road port Cai Mep – Thi
Vai area
Vai, Ba Ria Vung Tau
Province. Section 4
Construction of Lach
Huyen Port , Haiphong
City (I). Package 6:
retained dyke Type A;
protection wall. Soil
embankment, soil April PENTA-TOA
59,620 59,620 2017 JAPAN
improvement temporary 2017 JV
harbor ; road behind port
infrastructure works of
electric and water;
Contract number:
LHPK6-PTJV/703-01
Constructing of
infrastructure for children
toys factory Nam Dinh Dream Plastic
JY Plastic at Hai Phuong March November Nam Dinh
commune, Hai Hau 51,480 51,480 KOREA
2017 2017 Company
district, Nam ĈӏQK
province. Contract Limited
number 93/2017/703-
JY.PLATIC
7 0 3 C O N S T R U C T I O N A N D I N V E S T M E N T J O I N T S T O C K C O M PA N Y
Business office: CT1 building, Ngo Thi Nham, Ha Cau Ward, Ha Dong District, Hanoi City.
Tel: 024.3755.5418 Fax: 024.3755.1488 Hotline: 0968.702.221
Email: 703coinco@gmail.com Website: www.coinco703.com.vn
1 2 3 4 5 6 7
Construction of
infrastructure of Dream Dream Plastic
Plastic Nam Dinh factory. December November Nam Dinh
64,455 64,455 KOREA
Contract number: 171216 2016 2017 Company
+Ĉ.7-DREAM Limited
PLATIC
Package TN1,TN3:
Paving leveling course
and AC bonded wearing September September
course for section 285,389 65,389 VEC VN
2015 2015
Km210+000-Km227+500
and section Km248+000-
Km260+300
Package 4 : Construction
of Bac – Nam May Thang Long
December
43,347 43,347 VN
Expressway project (from 2016 PMU
2017
Ĉa Nang to Quang Ngai)
Package 3B The
construction Bac – Nam December March Nhan Binh
17,437 17,437 VN
Expressway project (from 2016 2017 Company
Ĉa Nang to Quang Ngai)
7 0 3 C O N S T R U C T I O N A N D I N V E S T M E N T J O I N T S T O C K C O M PA N Y
Business office: CT1 building, Ngo Thi Nham, Ha Cau Ward, Ha Dong District, Hanoi City.
Tel: 024.3755.5418 Fax: 024.3755.1488 Hotline: 0968.702.221
Email: 703coinco@gmail.com Website: www.coinco703.com.vn
1 2 3 4 5 6 7
Package 02 Section Km 8
– Km 16+880 The
September April
construction Bac – Nam 2,431,586 348,688 VEC VN
2013 2017
Expressway project (from
Ĉa Nang to Quang Ngai)
Package 2: Construction
August September
of the road and bridge 400,688 40,543 PMU 85 VN
2014 2014
Nhat Tan-Noi Bai project
Package 1: Construction
of the main bridge and IHI infrastrure
May August
northern approaching 10,208,847 49,697 System JAPAN
2014 2014
road - Nhat Tan Bridge Co.,Ltd
project
7 0 3 C O N S T R U C T I O N A N D I N V E S T M E N T J O I N T S T O C K C O M PA N Y
Business office: CT1 building, Ngo Thi Nham, Ha Cau Ward, Ha Dong District, Hanoi City.
Tel: 024.3755.5418 Fax: 024.3755.1488 Hotline: 0968.702.221
Email: 703coinco@gmail.com Website: www.coinco703.com.vn
1 2 3 4 5 6 7
Package A5 Section Km
109+750 – Km 131+000
May September Keangnam
The construction Noi Bai 1,974,676 317,591 KOREA
2013 2014 Enterprises
– Lao Cai Expressway
project
Package 02 : Scratching
and improvement the September January
4,936 3,752 PMU 2 VN
surface of Thang Long 2012 2013
Bridge for 2nd period
1 2 3 4 5 6 7
Package 03:
Rehabilitation and
Improvement NH 18C
Project (Km19+00 - March February PMU
72,847 40,081 VN
2011 2013 Quang Ninh
Km26+400) Section Tien
Yen - Hoanh Mo, Quang
Ninh province
Package XL4 -
construction of the
rehabilitation and
upgrading works of January October
59,689 35,783 RPMU 4 VN
Highway 7 project: 2010 2012
,Section Km0 - Km36
(Dien Chau - Do Luong),
Nghe An province.
7 0 3 C O N S T R U C T I O N A N D I N V E S T M E N T J O I N T S T O C K C O M PA N Y
Business office: CT1 building, Ngo Thi Nham, Ha Cau Ward, Ha Dong District, Hanoi City.
Tel: 024.3755.5418 Fax: 024.3755.1488 Hotline: 0968.702.221
Email: 703coinco@gmail.com Website: www.coinco703.com.vn
1 2 3 4 5 6 7
Package 3: Execution of
the road base and surface
including drainage,
sidewalks, trees and
protection works (Left People's
side section: Km1404.42 May November Committees
12,387 12,387 VN
-Km2+ 703.91) . Project: 2008 2010 communes
investment and Phuc Yen
construction of Nguyen
Tat Thanh road - Phuc
Yen Town (from NH-2 to
Xuan Hoa urban zone)
Package 01, 06 & 07;
Asphalt concrete
Lang - Hoa
Pavement work of the
March September Lac Express
Road widening and 200,098 110,000 VN
2009 2011 way Project
Completing of the Lang
Management
Hoa Lac expressway
construction Project.
Package 7 section
Km07+00 - Km08+00 November September PMU Ninh
11,834 11,834 VN
belong Ma Noi - Gia Hoa 2008 2010 Thuan
Road construction project
Package 2: Construction
of Km 71+500 - Km 76
(Include all works on
route)
Project: Investment and
construction of HW12,
section Km 66 - Km 102 ( March September PMU 1
86,893 23,841 VN
2008 2010
include Hang Tom
bridge) belong to section
road to avoid of flooding
caused by Son La
hydropower project
(Subproject 1)
7 0 3 C O N S T R U C T I O N A N D I N V E S T M E N T J O I N T S T O C K C O M PA N Y
Business office: CT1 building, Ngo Thi Nham, Ha Cau Ward, Ha Dong District, Hanoi City.
Tel: 024.3755.5418 Fax: 024.3755.1488 Hotline: 0968.702.221
Email: 703coinco@gmail.com Website: www.coinco703.com.vn
1 2 3 4 5 6 7
Packgae XL-04:
Construction of road
section Km 181+00-
Km191+837; November September PMU Quang
107,755 75,482 VN
Project: Improve HW18 2008 2010 Ninh
Mong Duong -Mong Cai
section, Quang Ninh
province
Package: Construction
August September PMU Hoa
road of Thinh Lang -Hoa 49,711 21,819 VN
2008 2010 Binh
Binh road
Package NPP-2/CP-29 of
the National Highway
No.5 Maintenance October August
27,257 27,257 PMU2 VN
periodic at Hai Duong 2008 2009
province (section Km 47 -
Km 55)
Package 04: Paving road¶
surface by asphalt
concrete from Km285-:- Yen Bai
Km308 of the NH.32 July November Transport
83,456 83,456 2010 VN
improvement project 2009 Engineering
(Nghia Lo - Vach Kim PMU
section – Yen Bai
province)
Package 2 & 3 of the
Thanh Tri bridge
construction project November January Thang Long
27,424 27,424 VN
2007 2009 PMU
Work Item : Asphalt
concrete pavement
Package: Construction of
Embankment -Drainage
and traffic safety system
Project: Rehabilitation September June Vinacomin
12,462 7,027 VN
and upgrade traffic road 2007 2008 PMU – TKV
way from Uong Bi - Vang
Danh, section Cau Trang-
Vang Danh
7 0 3 C O N S T R U C T I O N A N D I N V E S T M E N T J O I N T S T O C K C O M PA N Y
Business office: CT1 building, Ngo Thi Nham, Ha Cau Ward, Ha Dong District, Hanoi City.
Tel: 024.3755.5418 Fax: 024.3755.1488 Hotline: 0968.702.221
Email: 703coinco@gmail.com Website: www.coinco703.com.vn
1 2 3 4 5 6 7
Construction of the
Nation High way 48 January June
86,000 35,000 PMU 18 VN
Rehabilitation project 2006 2008
(Km 38 – Km 63)
Package 08(Km 71+00 –
Km 76+513.39) December November PMU Bien
Project: Improvement and 41,189 41,189 2007 2010 VN
Dong
Construction The NH.
279
Maintenance of NH. 1A -
Package 4.
May October VINACONE
Project: Improvement of 34,900 29,013 VN
2006 2007 X
road network, network
maintenance program
Project: Reconstruction of Road
December October
the NH.3; Package 3: Km 12,109 12,243 Management VN
2006 2007
33+285 –Km 74+362 II
Package : Reinforced
negative Road ‘slope
from Km273+630 -:-
Km273+730 and Km August February
5,959 5,959 PMU 18 VN
275+875-:- Km276+005 2007 2008
Project : Upgrading NH.2
(section Doan Hung -
Thanh Thuy)
Road No.971
Rehabilitation Phu Ly - December September
15,000 15,000 Ha Nam PMU VN
Ha Nam (Asphalt paving), 2005 2006
Km0+00 -Km20+00