Professional contractor in executing of road and bridge projects.

Implementing of infrastructural items both at civil and industrial projects.


Manufacturing and supplying Asphalt concrete.

703 CONSTRUCTION AND INVESTMENT JOINT STOCK COMPANY


Address: CT1 building, Ngo Thi Nham, Ha Cau Ward, Ha Dong District, Hanoi City
Tel: 024.3755.5418 Fax: 024.3755.1488 Hotline: 024.3755.1488
Email: 703coinco@gmail.com Website: coinco703.com.vn
TABLE OF CONTENTS

1. GENERAL INFORMATION

2. BUSINESS REGISTRATION CERTIFICATE

3. FINANCIAL CAPACITY

4. ORGANIZATIONAL CHART

5. COMPANY RESOURCES

6. COMPANY ACHIEVEMENT
1. GENERAL INFORMATION
7 0 3 C O N S T R U C T I O N A N D I N V E S T M E N T J O I N T S T O C K C O M PA N Y
Business office: CT1 building, Ngo Thi Nham, Ha Cau Ward, Ha Dong District, Hanoi City.
Tel: 024.3755.5418 Fax: 024.3755.1488 Hotline: 0968.702.221
Email: 703coinco@gmail.com Website: www.coinco703.com.vn

1. GENERAL INFORMATION
1.1 Name of Company
- The full name: 703 CONSTRUCTION AND INVESTMENT J.S.C (COINCO 703)

- Logo:

1.2 Address of Head office


02nd floor, CT1 building, Ngo Thi Nham, Ha Cau Ward, Ha Dong district, Hanoi city, Viet
Nam.
Account: 45715663 VP Bank – Vung Tau Branch.
Tax Code: 0101387113.
Telephone: 024.37555418/024.37551488. Fax: 024.37551488.
Hotline: 0968.702.221
1.3 Year of Establishment
Business license No. 0101387113 dated 04/07/2003, and change time 12th dated November
23rd, 2018 issued by Planning and Investment Division of Hanoi People Committee.
1.4 Main line activated

¾ Construction of Traffic, Irrigation, Civil and Industrial works.


¾ Road traffic and medium bridge design.
¾ Survey and design of road traffic works, bridge works.
¾ Investment consulting services, construction supervision, verification of technical
design.
¾ Quality inspection of construction works, traffic.
¾ Planning design of urban and rural transport networks.
¾ Electrical construction up to 35 KV.
¾ Material production as Cement, rock, sand, glass, bitumen and other for Civil and
Building construction.
¾ Manufacturing and Supplying asphalt concrete for infrastructural and
transportation projects whole the Vietnam country

¾ Research, applying and transfer of new technologies, automation equipment.


¾ Trading, leasing, repair, maintenance of construction equipment.
¾ Executing items in infrastructure fiel such as water supply and drainage system

703 INVESTMENT AND CONSTRUCTION


JOINT STOCK COMPANY
0š&/š&

2. BUSINESS REGISTRATION
CERTIFICATE
3. FINANCIAL CAPACITY
703 CONSTRUCTION AND INVESTMENT JOINT STOCK COMPANY
Address: CT1 Building, Ngo Thi Nham, Ha Cau Ward, Ha Dong District, Hanoi City
Tel: 024.3755.5418 Fax: 024.3755.1488
Email: 703coinco@gmail.com Website: www.coinco703.com.vn

3. FINANCIAL CAPACITY

Financial data for the last 3 years [VND]

1ăP7 1ăP8 1ăP9

Information from the balance sheet

Total asset 483.479.529.432 398.332.288.776 525.124.453.716

Total debt 326.726.337.773 259.775.247.349 358.423.554.588

Net asset value 156.753.191.659 138.557.041.427 166.700.899.128

Short-term assets 297.854.561.286 305.302.387.097 425.026.983.739

Short-term debt 296.665.253.411 234.740.428.395 338.246.843.518

Working capital 1.189.307.875 70.561.958.702 86.780.140.221

Information from the report on business results

Total revenue 386.195.797.481 348.608.253.778 253.670.005.677


Revenue from construction
386.195.797.481 296.262.999.924 253.670.005.677
activities
Profit before tax 11.120.057.687 6.003.549.268 2.116.306.571

Profit after tax 8.882.888.672 4.865.295.688 1.755.978.679

703 INVESTMENT AND CONSTRUCTION


JOINT STOCK COMPANY
SOCIALIST REPUBLIC OF VIETNAM

INDEPENDENCE – FREEDOM – HAPINESS

------------------------------------------------

FINANCIAL CAPACITY
Summary of consolidated financial at the end of 2017

Firm: 703 Constructions & Investment Joint Stock Company

Address: No. 11, Van Phuc road, Van Phuc ward - Ha Dong district, Hanoi city

Unit: VN Dong

Norms The Year 2017 (VND) Notes


Seq.
1 Total assets 483.479.529.432
2 Current assets 297.854.561.286
3 Liabilities payable 326.726.337.773
4 Total working assets 296.665.293.411
5 Equity 156.753.191.659
6 Net turnover and service 386.195.797.481
in which: revenue from construction works 386.195.797.481
7 Profit before Tax 11.120.057.687
8 Profit after Tax 8.882.888.672

UHY Auditing and Consulting Company Ltd Hanoi, 3 May 2018


703 Construction & Investment JSC.
The above figures are extracted from the 2017
consolidated financial statements of 703
Construction and Investment Joint Stock Company
Deputy General Manager
UHY Auditing and Consulting Company Limited
signed and sealed
PHAN GIA DAT
SOCIALIST REPUBLIC OF VIETNAM

INDEPENDENCE – FREEDOM – HAPINESS

------------------------------------------------

FINANCIAL CAPACITY
Summary of consolidated financial at the end of 2018

Firm: 703 Constructions & Investment Joint Stock Company

Address: 2nd floor, Ngo Thi Nham , Ha Cau ward - Ha Dong district, Hanoi city

Norms The Year 2018 (VND) Notes


Seq.
1 Total assets 398.332.288.776
2 Current assets 305.302.387.097
3 Liabilities payable 259.775.247.349
4 Total working assets 234.740.428.395
5 Equity 138.557.041.427
6 Net turnover 348.608.253.778
in which: revenue from construction works 296.262.999.924
7 Profit before Tax 6.003.549.268
8 Profit after Tax 4.865.295.688

Confirmed by Auditing Company Hanoi, 28 March 2018


703 Construction & Investment JSC.
The above figures are extracted from the 2018
consolidated financial statements of 703
Construction and Investment Joint Stock Company
Deputy General Manager
Vietnam Auditing and Valuation Company Ltd.
signed and sealed
TONG THI BICH LOAN
SOCIALIST REPUBLIC OF VIETNAM

INDEPENDENCE – FREEDOM – HAPINESS

------------------------------------------------

FINANCIAL CAPACITY
Summary of consolidated financial at the end of 2019

Firm: 703 Constructions & Investment Joint Stock Company

Address: 2nd floor, Ngo Thi Nham , Ha Cau ward - Ha Dong district, Hanoi city

Norms The Year 2019 (VND) Notes


Seq.
1 Total assets 525.124.453.716
2 Current assets 425.026.983.739
3 Liabilities payable 358.423.554.588
4 Total working assets 338.246.843.518
5 Equity 166.700.899.128
6 Net turnover 253.670.005.677
in which: revenue from construction works 253.670.005.677
7 Profit before Tax 2.116.306.571
8 Profit after Tax 1.755.987.679

Confirmed by Auditing Company Hanoi, 21 April 2020


703 Construction & Investment JSC.
The above figures are extracted from the 2019
consolidated financial statements of 703
Construction and Investment Joint Stock Company
Deputy General Manager
Vietnam Auditing and Valuation Company Ltd.
signed and sealed
BUI QUANG HOP
4. ORGANIZATIONAL CHART
7 0 3 C O N S T R U C T I O N A N D I N V E S T M E N T J O I N T S T O C K C O M PA N Y
Business office: CT1 building, Ngo Thi Nham, Ha Cau Ward, Ha Dong District, Hanoi City.
Tel: 024.3755.5418 Fax: 024.3755.1488 Hotline: 0968.702.221
Email: 703coinco@gmail.com Website: www.coinco703.com.vn

4.0. ORGANIZATIONAL CHART


4.1. ORGANIZATIONAL CHART OF COMPANY

MANAGEMENT
BOARD

GENERAL
DIRECTOR

DEPUTY GENERAL DIRECTOR DEPUTY GENERAL DIRECTOR DEPUTY GENERAL DIRECTOR


INCHARGE OF INCHARGE OF EXECUTING IN CHARGE OF
PLANNING & TECHNICAL ASPHALT PLANTS
Bidding & Project

Accountant Dept.,
Equipment and
Material Dept.
Admin. Affair

Financing and
Management
Dept.

Dept.

CIVIL WORKS AND HYDRAULIC


RESEARCH AND DEVELOPMENT
HOANG SON LAM JOINT STOCK

CONSTRUCTION MATERIALS

CONSTRUCTION TRANSPORT
CIEC GLOBAL CORPORATION

ASPHALT BACHING PLANTS


202 JOINT STOCK COMPANY

OF ASPHALT VIETNAM J.S.C


CONSTRUCTION COMPANY

MATERIAL & EQUIPMENT


EQUIPMENT WORKSHOP

CONSTRUCTION TEAMS
SUPPLYING & TRADE
217 EC TRADING AND
COMPANY

LIMITED

TEAM
7 0 3 C O N S T R U C T I O N A N D I N V E S T M E N T J O I N T S T O C K C O M PA N Y
Business office: CT1 building, Ngo Thi Nham, Ha Cau Ward, Ha Dong District, Hanoi City.
Tel: 024.3755.5418 Fax: 024.3755.1488 Hotline: 0968.702.221
Email: 703coinco@gmail.com Website: www.coinco703.com.vn

4.2. KEY PERSONNEL


Mr. Le Thu Bang
Position: Chairman Qualification: Engineer/Master of Roads and Bridges

Board of Director
Mr. Trieu Hong Tuyen
Position: General Director Qualification: Engineer/MBA

Mr. Vuong Tri Thanh


Position: Deputy General Director Qualification: Engineer
Mr. Nguyen Khac Dong
Position: Deputy General Director Qualification: Engineer

Mr. Le Tat Thang


Position: Deputy General Director Qualification: Engineer

3. Bidding & project management Department


Represented by Mr. Bui Tien Thanh
Position: The head of Department Qualification: Engineer

4. Finance and accounting department


Represented by Mr. Nguyen Hoang Gia
Position: Chief Accountant Qualification: Bachelor of Economics

5. Administration Affair department


Ms: Bui Thi Thanh Thao
Position: Chief of Administration Qualification: Law Bachalor

4.3. SUBSIDIARY COMPANY


1. CIEC Global Corporation
Address: Van Con hamlet – Van Con village – Hoai Duc district – Ha Noi city
Transaction office: 2nd Floor, CT1 Building, Ngo Thi Nham, Ha Cau, Ha Dong, HN
Represented by : Mr. Trieu Hong Tuyen
Position: Chairman and CEO Quantification: Engineer/MBA

2. Hoang Son Lam Joint Stock Company


Address: No.17, Alley 161, Nguyen Xien Street, Thanh Xuan district, Ha Noi city
Transaction office: 2nd Floor, CT1 Building, Ngo Thi Nham, Ha Cau, Ha Dong, HN
Represented by Mrs. Dang Thi Ngoc Quyen
Position: Director Qualification: Technological Master

3. 202 Construction Joint Stock Company


Address: 2nd Floor, CT1 Building, Ngo Thi Nham, Ha Cau, Ha Dong, HN
Represented by Mr. Vuong Tri Thuy
Position: Director Qualification: Engineer
7 0 3 C O N S T R U C T I O N A N D I N V E S T M E N T J O I N T S T O C K C O M PA N Y
Business office: CT1 building, Ngo Thi Nham, Ha Cau Ward, Ha Dong District, Hanoi City.
Tel: 024.3755.5418 Fax: 024.3755.1488 Hotline: 0968.702.221
Email: 703coinco@gmail.com Website: www.coinco703.com.vn

4. 217 EC Trading and Construction Company Limited


Address: No. 5, lane 17, lane 252, Dai Mo street, Dai Mo ward, Nam Tu Liem
district, Ha Noi city
Transaction office: 2nd Floor, CT1 Building, Ngo Thi Nham, Ha Cau, Ha Dong, HN
Represented by Mr. Nguyen Hoang Gia
Position: Director Qualification: Bachelor of Economics

5. Viet Nam Asphalt Development and Research Joint Stock Company.


Address: F3, G10 Tower, 493 Nguyen Trai Street, Thanh Xuan district, Ha Noi city
Represented by Mr. Le Tat Thang
Position: Director Qualification: Engineer

6. Asphalt Concrete Batching Plant SPECO 120 T/h


Address: Yen Binh ward, Thach That district, Ha Noi city
Represented by Mr. Trinh Duy Luc
Position: Station Chief Qualification: Machine engineer

7. Asphalt Concrete Batching Plant SPECO 120 T/h


Address: Nhon My ward, Hoai Nhon Town, Binh Dinh province
Represented by Mr. Dinh Cong Luong
Position: Station Chief Qualification: Machine engineer

8. Asphalt Concrete Batching Plant SPECO 160 T/h


Address: Kim Son village, Le Thien commune, An Duong district, Hai Phong city
Represented by Mr.: To Van Chuong
Position: Station Chief Qualification: Machine engineer

9. Asphalt Concrete Batching Plant AMMAN 140 T/h


Address: N2 road, Lot WP-A, Phu My 3 Specialized Industrial Park, Phuoc Hoa
Ward, Phu My Town, Ba Ria - Vung Tau Province.
Represented by Mr. Dinh Cong Trung
Position: Station Chief Qualification: Machine engineer

703 INVESTMENT AND CONSTRUCTION


JOINT STOCK COMPANY
5. COMPANY RESOURCES
7 0 3 C O N S T R U C T I O N A N D I N V E S T M E N T J O I N T S T O C K C O M PA N Y
Business office: CT1 building, Ngo Thi Nham, Ha Cau Ward, Ha Dong District, Hanoi City.
Tel: 024.3755.5418 Fax: 024.3755.1488 Hotline: 0968.702.221
Email: 703coinco@gmail.com Website: www.coinco703.com.vn

5. COMPANY RESOURSE
5.1. MANPOWER
TECHNICAL CLASSIFICASION
WORKING YEARS
NO. CLASSIFICATION QUANTITY OVER 5 OVER 10 OVER 15 NOTE
YEARS YEARS YEARS
I Over University Level
1 Road and bridge engineers 34 16 08 10
Construction economic
2 05 01 02 02
engineers
3 Civil engineers 10 05 03 02
4 Mechanical engineers 09 03 04 02
5 Irrigation engineers 10 05 04 01
6 Electrical engineers 07 05 02
II College level
1 Transport college 15 06 05 04
2 Civil collège 03 02 01
3 Economic college 05 03 02
Total 98 44 32 22

WORKERS CLASSIFICATION
LEVEL HIGH
NO. Classification QUANYITY
LEVEL
3/7 4/7 5/7
1 Operation of plant workers 30 15 16 09
2 Driving workers 11 02 07 02
3 Driving machine workers 35 10 16 09
4 Road workers 140 36 59 45
5 Bridge workers 45 18 15 12
Mechanicals of machinery
6 05 02 01 02
and equipment
Total 266 83 114 79

703 INVESTMENT AND CONSTRUCTION JOINT


STOCK COMPANY
7 0 3 C O N S T R U C T I O N A N D I N V E S T M E N T J O I N T S T O C K C O M PA N Y
Business office: CT1 building, Ngo Thi Nham, Ha Cau Ward, Ha Dong District, Hanoi City.
Tel: 024.3755.5418 Fax: 024.3755.1488 Hotline: 0968.702.221
Email: 703coinco@gmail.com Website: www.coinco703.com.vn

5.2. CONSTRUCTION EQUIPMENT

No. Name of equipment Quantity Power Country Year Quality

I Transportation vehicle

1 Dump Truck CNHTC 05 16 T China 2016 Good

2 Dump Truck CNHTC 02 10 T China 2010 Good

Asphalt Concrete
II
Batching Plant

Asphalt Batching Plant


1 01 120 T/h Korea 2006 Good
SPECO

Asphalt Batching Plant


2 01 120 T/h Korea 2013 Good
SPECO

Asphalt Batching Plant


3 01 160 T/h Korea 2014 Good
SPECO

Asphalt Batching Plant


4 01 120 T/h Korea 2017 Good
SPECO
7 0 3 C O N S T R U C T I O N A N D I N V E S T M E N T J O I N T S T O C K C O M PA N Y
Business office: CT1 building, Ngo Thi Nham, Ha Cau Ward, Ha Dong District, Hanoi City.
Tel: 024.3755.5418 Fax: 024.3755.1488 Hotline: 0968.702.221
Email: 703coinco@gmail.com Website: www.coinco703.com.vn

No. Name of equipment Quantity Power Country Year Quality

Asphalt Batching Plant


5 01 140 T/h Switzerland 2017 Good
AMMAN

III Rollers

1 Steel wheel roller CAT No1 01 12 T Japan 2011 Good


2 Steel wheel roller CAT No2 01 12 T Japan 2013 Good
Steel wheel roller (2
3 01 12 T Germany 2016 Good
wheels) Hamm HD110
Steel vibrator roller (2
4 02 12 T Germany 2015 Good
wheels) Hamm HD110
Vibrating roller Hamm
5 01 24 T Germany 2017 Good
3412
Vibrating roller Hamm
6 01 05T Germany 2010 Good
HD 14 VV
Vibrating roller Hamm
7 01 11T Germany 2004 Good
HD110
Pneumatic roller Watanabe
8 01 14 T Japan 2000 Good
(9 wheels)
Pneumatic roller Sakai
9 01 14T Japan 2000 Good
TS200
10 Pneumatic roller GW15 02 20T Germany 2013 Good
11 Pneumatic roller GW18 01 20T Germany 2015 Good
Pneumatic roller Amman
12 01 28T Sweden 2015 Good
AP240
Pneumatic roller Amman
13 01 28T Sweden 2019 Good
AP240
Steel wheel roller Sakai
14 01 9,6T Japan 2010 Good
R2S
15 Steel wheel roller Sakai R2 01 9,3T Japan 2010 Good
Vibrating roller Hamm
16 01 25,6T Germany 2012 Good
3414
Vibrating roller Hamm
17 01 25,6T Germany 2019 Good
3414
7 0 3 C O N S T R U C T I O N A N D I N V E S T M E N T J O I N T S T O C K C O M PA N Y
Business office: CT1 building, Ngo Thi Nham, Ha Cau Ward, Ha Dong District, Hanoi City.
Tel: 024.3755.5418 Fax: 024.3755.1488 Hotline: 0968.702.221
Email: 703coinco@gmail.com Website: www.coinco703.com.vn

No. Name of equipment Quantity Power Country Year Quality

Vibrating roller Hamm


18 01 26,1T Germany 2014 Good
3412

Excavator, Grader,
IV
Bulldozer

Wheel loader XCMG


1
LW300F
02 1.8m3 China 2013 Good

2 Wheel loader Liugong 01 1.7m3 China 2006 Good

Wheel loader Doosan MEGA


3
400-V
01 4.1m3 Korea 2005 Good

Wheel loader Komatsu 380-


4 01 2.6m3 Japan 2000 Good
3H
Wheel loader Komatsu
5
WA270
01 103Kw Germany 2000 Good

Wheel loader Komatsu 380-


6 01 2.6m3 Japan 2017 Good
6

7 Excavator Komatsu 02 1.25m3 Japan 2000 Good

8 Excavator Komatsu PC300 01 1.25m3 Japan 2007 Good

Excavator Komatsu PC210-


9 01 0.8m3 Japan 2004 Good
6

Excavator Komatsu PC290-


10 01 0.8m3 Japan 2010 Good
8

11 Grader Mitsubishi LG2-H 01 110CV Japan 2005 Good

Wheeled Scratching
12 01 2.1m Japan 2000 Good
Vehicle - Sakai ER550F
7 0 3 C O N S T R U C T I O N A N D I N V E S T M E N T J O I N T S T O C K C O M PA N Y
Business office: CT1 building, Ngo Thi Nham, Ha Cau Ward, Ha Dong District, Hanoi City.
Tel: 024.3755.5418 Fax: 024.3755.1488 Hotline: 0968.702.221
Email: 703coinco@gmail.com Website: www.coinco703.com.vn

No. Name of equipment Quantity Power Country Year Quality

13 Bulldozer Komatsu D41P- 6 01 12.5T Japan 2002 Good

V Asphalt Paver

Asphalt Paver Vogele 142KW;


1
S1900-2
01
2000 v/p
Germany 2016 Good

Asphalt Paver Vogele 142KW;


2 01 Germany 2014 Good
S1900-2 2000 v/p

Asphalt Paver Vogele 133kW;


3 01 Germany 2013 Good
S1800-1 2200 v/p

Asphalt Paver Vogele 61KW;


4 01 Germany 2013 Good
S1800 1800 v/p

Asphalt Paver Caterpillar 144KW


5
AP-755
01
2200 v/p
USA 2009 Good

VI Bitumen spraying truck

1 Spraying bitumen Truck 01 4,8T Viet Nam 2019 Good

Spraying bitumen
2 05 5T Viet Nam 2010 Good
Equipment Cuu Long
7 0 3 C O N S T R U C T I O N A N D I N V E S T M E N T J O I N T S T O C K C O M PA N Y
Business office: CT1 building, Ngo Thi Nham, Ha Cau Ward, Ha Dong District, Hanoi City.
Tel: 024.3755.5418 Fax: 024.3755.1488 Hotline: 0968.702.221
Email: 703coinco@gmail.com Website: www.coinco703.com.vn

No. Name of equipment Quantity Power Country Year Quality

3 Spraying asphalt truck KIA 02 5000L Korea 2009 Good

Generator, lightning
VII
tower

1 Generator Komatsu 05 500KVA Japan 2004 Good


2 Generator Mitsubishi 01 400KVA Japan 2006 Good
Lightning tower 4x1000
3 01 Japan 2015 Good
ALT6600A W

Equipment for painting


VIII
road marking

Equipment for heating


1 01 56 L Viet Nam 2020 Good
and spraying bitumen

IX Laboratory

Laboratory LAS-XD521
implementation fully of
1 asphalt concrete tests 01 US 2014 Good
(Including of the wheels
trail test)
703 INVESTMENT AND CONSTRUCTION
JOINT STOCK COMPANY
6. COMPANY ACHIEVEMENT
7 0 3 C O N S T R U C T I O N A N D I N V E S T M E N T J O I N T S T O C K C O M PA N Y
Business office: CT1 building, Ngo Thi Nham, Ha Cau Ward, Ha Dong District, Hanoi City.
Tel: 024.3755.5418 Fax: 024.3755.1488 Hotline: 0968.702.221
Email: 703coinco@gmail.com Website: www.coinco703.com.vn

6. ACHIEVEMENTS

Total Contract Contract duration


contract or value Name of
value perform agency Country
Construction Name Start Finish
(Million. (Million. signing name
Dong) Dong) contract

1 2 3 4 5 6 7

Project: Expansion and


rehabilitation of of
NHW51: Repair and
1-5 Trading
increase road surface load 4.317 20/12/2020 31/3/2021 VN
company Ltd
capacity at intersections
Km2 + 200, Km20 + 100
and Km 30 + 200

Project: NHW56 - Main


Bypassing road avoiding Contractor:
urban zone of Ba Ria - Thinh Phat
Vung Tau province: Construction
4.622 12/8/2020 31/01/2021 VN
Package No. 17: &
Construction of Road Transportatio
section: from Km9+800 - n projects CO.
:- Km11+080 Ltd.

Package XL-01: Repair of


intersection Km47 + 460
and intersection Km47 +
680 - Km48 + 040 under September November
16.666 16.666 VIDIFI VN
Highway 5 Repair Project 2020 2020
- Segment from Km46 +
000 to Km76 + 000 and
some other items
Package 2: "Construction
of road surface, drainage
works, section Km97 +
PMU
500 - Km103 + 542.62" September November
65.318 31.411 transport Binh VN
under the Coastal Road 2020 2021
Dinh
Project (DT.639), from
Lai Giang Bridge to Thien
Chanh Bridge
7 0 3 C O N S T R U C T I O N A N D I N V E S T M E N T J O I N T S T O C K C O M PA N Y
Business office: CT1 building, Ngo Thi Nham, Ha Cau Ward, Ha Dong District, Hanoi City.
Tel: 024.3755.5418 Fax: 024.3755.1488 Hotline: 0968.702.221
Email: 703coinco@gmail.com Website: www.coinco703.com.vn

Total Contract Contract duration


contract or value Name of
value perform agency Country
Construction Name
(Million. (Million. Start Finish signing name
Dong) Dong) contract

1 2 3 4 5 6 7
Package: Management
and maintenance of
access roads to the
Long Son
Southern Vietnam August February
16.113 16.113 Petrochemicals VN
Petrochemical Complex 2020 2023 Co., LTD
project under the Road
Maintenance Project in
2020-2022
Package ST-CW-01:
Construction of provincial
road 933B, Sub-project of
investment in
infrastructure construction
to serve production April
November PMU 2 of Soc
conversion in accordance 258.107 77.171 VN
2019 2022 Trang
with ecological
conditions, livelihood
improvement, and
adaptation Climate
Change in Cu Lao Dung
(ICRSL Project)
Package 4: Construction
of road surface, drainage
May PMU
works in section Km26- November
98.784 40.501 transport Binh VN
Km30, Coastal Road 2019 2021 Dinh
works (DT.639), Cat Tien
- De Gi section
Package XL01:
Construction and
Technical Design
Drawings Section :
Km0+000 +Km 15+000 August PMU of Ho
August
(including bridges: Lai 547.465 354.483 Chi Minh VN
2018 2021
Phuoc, Khe Ai Tu, Over Road
cross TL579), Component
Project of North –South
Expressway, East corridor
Period 2017 - 2020
7 0 3 C O N S T R U C T I O N A N D I N V E S T M E N T J O I N T S T O C K C O M PA N Y
Business office: CT1 building, Ngo Thi Nham, Ha Cau Ward, Ha Dong District, Hanoi City.
Tel: 024.3755.5418 Fax: 024.3755.1488 Hotline: 0968.702.221
Email: 703coinco@gmail.com Website: www.coinco703.com.vn

Total Contract Contract duration


contract or value Name of
value perform agency Country
Construction Name
(Million. (Million. Start Finish signing name
Dong) Dong) contract

1 2 3 4 5 6 7

Package 2: Handling
potential points Traffic
accidents at
Km124 + 600 - Km124 +
900, Km145 + 900 -
Km146 + 500, Km153 +
00 - Km153 + 500, August January
9,319 9,319 PMU 3 VN
Km156 + 00 - Km157 + 2019 2020
200, Km173 + 00 -
Km173 + 800, Km175 +
200 - Km175 + 800
National Road 6, Hoa
Binh and Son La
Provinces.

Package 9: Construction
of foundation, paving and
drainage works from Km0
PMU
+ 00 - Km2 + 00, Project 54,057 22,429 June 2019 VN
March 2020 transport Binh
of National Road 19
Dinh
(section from Quy Nhon
Port to National Highway
1).
Package 6: Expanding
NH1A, Km1051+845 –
November January
Km1055+280 Section, 116,891 70,134 PMU 85 VN
2018 2020
Quang Ngai Province
Project.
Package 24: Overcoming
consequences of storms
and floods and
strengthening the
pavement structure of August January PMU Ho Chi
176,382 70,630 VN
Investment construction 2018 2019 Minh
NH1 project, Section:
Km1153+000 –
Km1212+400 Section,
Binh Dinh Province .
7 0 3 C O N S T R U C T I O N A N D I N V E S T M E N T J O I N T S T O C K C O M PA N Y
Business office: CT1 building, Ngo Thi Nham, Ha Cau Ward, Ha Dong District, Hanoi City.
Tel: 024.3755.5418 Fax: 024.3755.1488 Hotline: 0968.702.221
Email: 703coinco@gmail.com Website: www.coinco703.com.vn

Total Contract Contract duration


contract or value Name of
value perform agency Country
Construction Name
(Million. (Million. Start Finish signing name
Dong) Dong) contract

1 2 3 4 5 6 7
Package 13: Paving
asphalt layer and
construction of traffic
safety system for
packages: 8, 9, 10, 11,
December March PMU Ho Chi
12: Section Km 228 +437 84,438 35,852 VN
2017 2018 Minh
-Km 248 +878
Project : Ho Chi Minh
HW, Section : Cho Moi –
Trung Son, Thai Nguyen
Province
Package 22: Construction
of asphalt pavement,
PMU
sidewalks and finishing
December December transport, Cai
items of Project: inter- 61,816 61,816 VN
2017 2018 Mep – Thi
road port Cai Mep – Thi
Vai area
Vai, Ba Ria Vung Tau
Province. Section 4
Construction of Lach
Huyen Port , Haiphong
City (I). Package 6:
retained dyke Type A;
protection wall. Soil
embankment, soil April PENTA-TOA
59,620 59,620 2017 JAPAN
improvement temporary 2017 JV
harbor ; road behind port
infrastructure works of
electric and water;
Contract number:
LHPK6-PTJV/703-01
Constructing of
infrastructure for children
toys factory Nam Dinh Dream Plastic
JY Plastic at Hai Phuong March November Nam Dinh
commune, Hai Hau 51,480 51,480 KOREA
2017 2017 Company
district, Nam ĈӏQK
province. Contract Limited
number 93/2017/703-
JY.PLATIC
7 0 3 C O N S T R U C T I O N A N D I N V E S T M E N T J O I N T S T O C K C O M PA N Y
Business office: CT1 building, Ngo Thi Nham, Ha Cau Ward, Ha Dong District, Hanoi City.
Tel: 024.3755.5418 Fax: 024.3755.1488 Hotline: 0968.702.221
Email: 703coinco@gmail.com Website: www.coinco703.com.vn

Total Contract Contract duration


contract or value Name of
value perform agency Country
Construction Name
(Million. (Million. Start Finish signing name
Dong) Dong) contract

1 2 3 4 5 6 7

Construction of
infrastructure of Dream Dream Plastic
Plastic Nam Dinh factory. December November Nam Dinh
64,455 64,455 KOREA
Contract number: 171216 2016 2017 Company
+Ĉ.7-DREAM Limited
PLATIC

Package TN1,TN3:
Paving leveling course
and AC bonded wearing September September
course for section 285,389 65,389 VEC VN
2015 2015
Km210+000-Km227+500
and section Km248+000-
Km260+300

Package RAP/CP3, NH2 July May


from Km205-Km246 in 342,973 65,501 PMU3 VN
2015 2016
Ha Giang province.

Package EX-1A, Project


August October
Ha Noi-Hai Phong 702,154 32,267 VIDIFI VN
2015 2015
Expressway

Package EX-19A: 5cm-


Polymer AC fine course
and bonded wearing July November
472,492 165,416 VIDIFI VN
course from Km0+00 to 2015 2015
Km33+00 in Ha Noi and
Hung Yen province

Package 4 : Construction
of Bac – Nam May Thang Long
December
43,347 43,347 VN
Expressway project (from 2016 PMU
2017
Ĉa Nang to Quang Ngai)

Package 3B The
construction Bac – Nam December March Nhan Binh
17,437 17,437 VN
Expressway project (from 2016 2017 Company
Ĉa Nang to Quang Ngai)
7 0 3 C O N S T R U C T I O N A N D I N V E S T M E N T J O I N T S T O C K C O M PA N Y
Business office: CT1 building, Ngo Thi Nham, Ha Cau Ward, Ha Dong District, Hanoi City.
Tel: 024.3755.5418 Fax: 024.3755.1488 Hotline: 0968.702.221
Email: 703coinco@gmail.com Website: www.coinco703.com.vn

Total Contract Contract duration


contract or value Name of
value perform agency Country
Construction Name
(Million. (Million. Start Finish signing name
Dong) Dong) contract

1 2 3 4 5 6 7

Package 02 Section Km 8
– Km 16+880 The
September April
construction Bac – Nam 2,431,586 348,688 VEC VN
2013 2017
Expressway project (from
Ĉa Nang to Quang Ngai)

Package 12: Improvement


of Phai Khat-Na Ngan June September PMU Cao
26,378 26,378 VN
road Project (Km2+00- 2015 2015 %ҵQJ
Km3+775)
Construction of upgrading
provincial roads 202 (Ca
Thanh-Lung Pan-Ban October October PMU Cao
78,080 23,761 VN
Rien) Cao Bang Project, 2013 2015 Bang
Section: Km15+00-
Km23+00
Implementing of
polymers asphalt concrete
for Package 2:
July August Vinaconex
construction of roads and 12,818 12,818 VN
2014 2014 E&C
southern approaching
road belong to Nhat Tan
Bridge

Package XL.02, XL.03,


XL.04 of construction of
investment and expansion November March Thang Long
75,553 75,553 VN
HW 1 project; section 2014 2015 Group
Km1445-Km1488, Khanh
Hoa province

Package 2: Construction
August September
of the road and bridge 400,688 40,543 PMU 85 VN
2014 2014
Nhat Tan-Noi Bai project

Package 1: Construction
of the main bridge and IHI infrastrure
May August
northern approaching 10,208,847 49,697 System JAPAN
2014 2014
road - Nhat Tan Bridge Co.,Ltd
project
7 0 3 C O N S T R U C T I O N A N D I N V E S T M E N T J O I N T S T O C K C O M PA N Y
Business office: CT1 building, Ngo Thi Nham, Ha Cau Ward, Ha Dong District, Hanoi City.
Tel: 024.3755.5418 Fax: 024.3755.1488 Hotline: 0968.702.221
Email: 703coinco@gmail.com Website: www.coinco703.com.vn

Total Contract Contract duration


contract or value Name of
value perform agency Country
Construction Name
(Million. (Million. Start Finish signing name
Dong) Dong) contract

1 2 3 4 5 6 7

Package A5 Section Km
109+750 – Km 131+000
May September Keangnam
The construction Noi Bai 1,974,676 317,591 KOREA
2013 2014 Enterprises
– Lao Cai Expressway
project

Package 02 : Scratching
and improvement the September January
4,936 3,752 PMU 2 VN
surface of Thang Long 2012 2013
Bridge for 2nd period

Package 07: Reparation


and improvement of NH.5 April July
90,086 45,000 PMU 2 VN
project. Section Km 2013 2013
11+135 –Km33+720

Package 02: Scratching


and improvement Thang September January
4,614 3,493 PMU 2 VN
Long Bridge¶VVXUIDFH1 2012 2013
period
Package 05 : Construction
pre-stressed
reinforcement bridge Km
September September
35+334 of the Road 16,000 16,000 PMU 1 VN
2012 2013
construction from Quang
Son to Don 9 TL6,
Daknong Province.

Package 01: improvement


August September
Thang Long Bridge¶V 3,000 3,000 PMU 2 VN
2012 2012
surface

Hanoi Ring Road No.3


May July TLG - C8 -
Construction Project 25,000 25,000 VN
2012 2012 C4 JV
Package 03, 2nd period

Package 03: Reparation


September April Sumitomo
of Thanh tri bridge¶V 62,000 62,000 JAPAN
2011 2012 Mitsui
surface project
7 0 3 C O N S T R U C T I O N A N D I N V E S T M E N T J O I N T S T O C K C O M PA N Y
Business office: CT1 building, Ngo Thi Nham, Ha Cau Ward, Ha Dong District, Hanoi City.
Tel: 024.3755.5418 Fax: 024.3755.1488 Hotline: 0968.702.221
Email: 703coinco@gmail.com Website: www.coinco703.com.vn

Total Contract Contract duration


contract or value Name of
value perform agency Country
Construction Name
(Million. (Million. Start Finish signing name
Dong) Dong) contract

1 2 3 4 5 6 7

Package 03:
Rehabilitation and
Improvement NH 18C
Project (Km19+00 - March February PMU
72,847 40,081 VN
2011 2013 Quang Ninh
Km26+400) Section Tien
Yen - Hoanh Mo, Quang
Ninh province

Package 15: Construction


of approach road at 2ends
of bridge and asphalt
surface and lighting
September February
system of the My Loi 76,153 76,153 PMU 7 VN
2010 2013
bridge project: section
Km34+ 826 belong to
NH.50, Long An and Tien
Giang province

Works and services such


as contract management
and Roadway
250,000 75,000 May May PMU 2 VN
Maintenance, Package
2010 2013
NPP / PBC1-CP3 period
from km0 + 00 - Km141
+ 760, Highway3 QL10

Package 02: Reparation


and improvement asphalt August October Sumitomo
26,000 26,000 JAPAN
surface layer of Thanh tri 2012 2012 Mitsui
Bridge project

Package XL4 -
construction of the
rehabilitation and
upgrading works of January October
59,689 35,783 RPMU 4 VN
Highway 7 project: 2010 2012
,Section Km0 - Km36
(Dien Chau - Do Luong),
Nghe An province.
7 0 3 C O N S T R U C T I O N A N D I N V E S T M E N T J O I N T S T O C K C O M PA N Y
Business office: CT1 building, Ngo Thi Nham, Ha Cau Ward, Ha Dong District, Hanoi City.
Tel: 024.3755.5418 Fax: 024.3755.1488 Hotline: 0968.702.221
Email: 703coinco@gmail.com Website: www.coinco703.com.vn

Total Contract Contract duration


contract or value Name of
value perform agency Country
Construction Name
(Million. (Million. Start Finish signing name
Dong) Dong) contract

1 2 3 4 5 6 7
Package 3: Execution of
the road base and surface
including drainage,
sidewalks, trees and
protection works (Left People's
side section: Km1404.42 May November Committees
12,387 12,387 VN
-Km2+ 703.91) . Project: 2008 2010 communes
investment and Phuc Yen
construction of Nguyen
Tat Thanh road - Phuc
Yen Town (from NH-2 to
Xuan Hoa urban zone)
Package 01, 06 & 07;
Asphalt concrete
Lang - Hoa
Pavement work of the
March September Lac Express
Road widening and 200,098 110,000 VN
2009 2011 way Project
Completing of the Lang
Management
Hoa Lac expressway
construction Project.
Package 7 section
Km07+00 - Km08+00 November September PMU Ninh
11,834 11,834 VN
belong Ma Noi - Gia Hoa 2008 2010 Thuan
Road construction project
Package 2: Construction
of Km 71+500 - Km 76
(Include all works on
route)
Project: Investment and
construction of HW12,
section Km 66 - Km 102 ( March September PMU 1
86,893 23,841 VN
2008 2010
include Hang Tom
bridge) belong to section
road to avoid of flooding
caused by Son La
hydropower project
(Subproject 1)
7 0 3 C O N S T R U C T I O N A N D I N V E S T M E N T J O I N T S T O C K C O M PA N Y
Business office: CT1 building, Ngo Thi Nham, Ha Cau Ward, Ha Dong District, Hanoi City.
Tel: 024.3755.5418 Fax: 024.3755.1488 Hotline: 0968.702.221
Email: 703coinco@gmail.com Website: www.coinco703.com.vn

Total Contract Contract duration


contract or value Name of
value perform agency Country
Construction Name
(Million. (Million. Start Finish signing name
Dong) Dong) contract

1 2 3 4 5 6 7
Packgae XL-04:
Construction of road
section Km 181+00-
Km191+837; November September PMU Quang
107,755 75,482 VN
Project: Improve HW18 2008 2010 Ninh
Mong Duong -Mong Cai
section, Quang Ninh
province

Package: Construction
August September PMU Hoa
road of Thinh Lang -Hoa 49,711 21,819 VN
2008 2010 Binh
Binh road

Package NPP-2/CP-29 of
the National Highway
No.5 Maintenance October August
27,257 27,257 PMU2 VN
periodic at Hai Duong 2008 2009
province (section Km 47 -
Km 55)
Package 04: Paving road¶
surface by asphalt
concrete from Km285-:- Yen Bai
Km308 of the NH.32 July November Transport
83,456 83,456 2010 VN
improvement project 2009 Engineering
(Nghia Lo - Vach Kim PMU
section – Yen Bai
province)
Package 2 & 3 of the
Thanh Tri bridge
construction project November January Thang Long
27,424 27,424 VN
2007 2009 PMU
Work Item : Asphalt
concrete pavement

Package: Construction of
Embankment -Drainage
and traffic safety system
Project: Rehabilitation September June Vinacomin
12,462 7,027 VN
and upgrade traffic road 2007 2008 PMU – TKV
way from Uong Bi - Vang
Danh, section Cau Trang-
Vang Danh
7 0 3 C O N S T R U C T I O N A N D I N V E S T M E N T J O I N T S T O C K C O M PA N Y
Business office: CT1 building, Ngo Thi Nham, Ha Cau Ward, Ha Dong District, Hanoi City.
Tel: 024.3755.5418 Fax: 024.3755.1488 Hotline: 0968.702.221
Email: 703coinco@gmail.com Website: www.coinco703.com.vn

Total Contract Contract duration


contract or value Name of
value perform agency Country
Construction Name
(Million. (Million. Start Finish signing name
Dong) Dong) contract

1 2 3 4 5 6 7
Construction of the
Nation High way 48 January June
86,000 35,000 PMU 18 VN
Rehabilitation project 2006 2008
(Km 38 – Km 63)
Package 08(Km 71+00 –
Km 76+513.39) December November PMU Bien
Project: Improvement and 41,189 41,189 2007 2010 VN
Dong
Construction The NH.
279
Maintenance of NH. 1A -
Package 4.
May October VINACONE
Project: Improvement of 34,900 29,013 VN
2006 2007 X
road network, network
maintenance program
Project: Reconstruction of Road
December October
the NH.3; Package 3: Km 12,109 12,243 Management VN
2006 2007
33+285 –Km 74+362 II
Package : Reinforced
negative Road ‘slope
from Km273+630 -:-
Km273+730 and Km August February
5,959 5,959 PMU 18 VN
275+875-:- Km276+005 2007 2008
Project : Upgrading NH.2
(section Doan Hung -
Thanh Thuy)

Road No.971
Rehabilitation Phu Ly - December September
15,000 15,000 Ha Nam PMU VN
Ha Nam (Asphalt paving), 2005 2006
Km0+00 -Km20+00

HW 6 - Package18,19 December October


(Asphalt concrete paving) 24,300 24,300 PMU 1 VN
2003 2004

703 INVESTMENT AND CONSTRUCTION JOINT


STOCK COMPANY