Blast Door - Elevation DWG
Blast Door - Elevation DWG
ELEVATION
SP BASE FINISH
ELEVATION NOT
A SHOWN WALL FINSH
SHOWN
CEILING FINISH
STARTING POINT
SHEET SHOWN
DRAWING TITLE DRAWING IDENTIFICATION (LETTERS FOR PLANS & WINDOW WALL & DOOR TYPE DESIGNATOR
ELEVATIONS,NUMBER FOR SECTIONS & DETAILS) DATUM POINT, SHUTTER TYPE
WORKING POINT
A FLOOR PLAN GLASS DOOR
DOOR DESIGNATION
WALL TYPE
NAME ABBREVIATIONS WALL MOUNTED LIGHT FIXTURES
b= BLOCK WALL EL = LEVEL
br = RED BRICK S.S.L. = STRUCTURAL LEVEL IN PLAN IN ELEVATIONS
cc= CONCRETE WALL F.F.L. = FINISH FLOOR LEVEL
d = DEMOUNTABLE PARTITION W.F.L. = WALKWAY LEVEL
gb= GLASS BLOCK WALL CU = CONDENSER UNIT
m= PREPAINTED HIGH RIB INSULATED METAL WALL PANEL HT = HEIGHT
FD = FLOOR DRAIN
c = CEMENT BOARD PARTITION
FCO = FLOOR CLEAN OUT
cf = CEMENT BOARD FURRING ON CONCRETE OR BLOCK WALL
RD = ROOF DRAIN
cx = SINGLE SIDE CEMENT BOARD PARTITION EXP. JT. = EXPANSION JOINT
g = GYPSUM BOARD PARTITION
gf = GYPSUM BOARD FURRING ON CONCRETE OR BLOCK WALL LEVEL ABBREVIATIONS
gx = SINGLE SIDE GYPSUM BOARD PARTITION FOR PLANS FOR ELEVATION , SECTIONS & WALL SECTIONS
t = GYPSUM/CEMENT BOARD PARTITION EL.000.00 FLOOR FINISH LEVEL FLOOR FINISH LEVEL
F.F.L.
gp = FRAMELESS CLEAR TEMPERED GLASS PARTITION
EL.000.00 STRUCTURAL SLAB LEVEL STRUCTURAL SLAB LEVEL
n = PRE-INSULATED CONCRETE MASONRY BLOCK WALL T.O.S.S
gxr = LEAD BACKED GYPSUM BOARD FURRING ON EL.000.00
CONC/BLOCK WALL WALK WAY FINISH LEVEL WALK WAY FINISH LEVEL
W.F.L
gl = SINGLE SIDE SHIELDED GYPSUM BOARD PARTITION EL.000.00 TOP OF PARAPET TOP OF PARAPET
T.O.PARAPET
EL.000.00 TOP OF COPING TOP OF COPING
T.O.COPING
2500
2500
2480
2480
2440
2440
C EXTERNAL REFERENCE DRAWINGS
C
DESCRIPTION GIJV DRAWING NUMBER REV
NUMBER
APPROVED PD DRAWINGS 4648 KAP5-CRCC-DWG-00-000-19-GR00-xxxx-RE-PD-AR-100 01
1000
Saddle Booklet details 3815 DRAWINGS 00
KEY PLAN
D
D
2880
2960
E 3000 00 ISSUED FOR APPROVAL 05-02-2020 M.BORHAN M. MOHSEN
E
REV DESCRIPTION DATE DRAWN BY CHECKED BY APPROVED BY
APPROVALS
CONTRACTOR CONSULTANT CONTRACTOR THE ENGINEER
QC QA COORDINATION
ARCH. CIVIL STRUC. ELECT. MECH. ENG. COOR. ENG. MNGR.
SITE NUMBERS
SITE 99 - - - - -
PROTOTYPE 19 - - - - -
CLIENT
CLIENT CONSULTANT
Joint Venture
GESBAU-ITALCONSULT
PO BOX 998
Riyadh: 11372 - T: 0112166644 F: 0112166644
G
CONTRACTOR G
CHINA RAILWAY CONSTRUCTION CORPORATION LTD
3532 Prince Nasser bin Saud bin Farhan Al saud, As sahafah
Saudi Arabia – Riyadh
http://english.crcc.cn/ E-mail: info@crcc.sa
CONTRACTOR CONSULTANT
KAP5
China Railway Construction
Issued For Construction (IFC1)
Corporation Limited
BUILDING NO(GR00-xxxx)
H
Reviewed by
H
TITLE
PROTOTYPE 19 - SITE 99
ARMS AMMUNITION&EXPLOSIVES WAREHOUSE
1000 2000
(MIRROR)
0 500
DOORS DETAILS
Approved by
SCALE 1:20 MILLIMETERS
REV NO
DWG NO KAP5–CRCC–DWG-00-000-19-GR00-xxxx-MI-IFC1-AR- 910
00
1 2 3 4 5 6 7 8 9 10