PROJECT DRAWING M900, DOMESTIC HOT WATER LAYOUT

Floor Elevation Loads / Expansion Joint Travel / Operating Deflection Size Details / Branch / Equipment
70.9 m Top, Deflection= 3.5 mm (0.1-in) - --------------- Min. distance to first support= 914 mm.
DN50
22 67.4 m

Estimated operating load= -1,050 N (-230 lbs.) DN50


21 64.4 m Estimated max (staged) load= -7,630 N (-1,710 lbs.) xxx Anchor 1, Connected per Structural Eng's instructions
Part No: 3501-131-4, Carbon Steel
~ 63.0 m Estimated design expansion= 49.5 mm (1.9-in) DN50
20 61.5 m Between anchors= 47.2 m (154.9ft) Pressure (including pump)= 291 kPag (42 psig)
19 58.5 m DN50
18 55.6 m DN50
17 52.6 m DN50
16 49.7 m DN50
15 46.7 m DN50
14 43.8 m DN50
13 40.8 m DN50
12 37.9 m DN50
11 34.9 m DN50
10 32.0 m DN50
9 29.0 m DN50
7 23.1 m DN50
6 20.1 m DN50

Estimated operating load= 8,500 N (1,900 lbs.) DN50


5 17.2 m Estimated max (design) load= 13,000 N (2,800 lbs.) xxx Anchor 2, Connected per Structural Eng's instructions
4 14.3 m DN50
3 11.3 m DN50
11.3 m Bottom, Deflection= -3.2 mm (-0.1-in) - --------------- Min. distance to first support= 875 mm.
DN50
2 8.4 m Pressure (including pump)= 805 kPag (115 psig)

PROJECT NAME & RISER MATERIALS: RISER TITLE:


0
Mineral Wool insulation HOT WATER DUMMY
Carbon steel STD pipe (CS) LEVEL 2 TO LEVEL 22
PROJECT # DATE: RISER CALCULATION No. SHEET REV.
ONT_0647977 Jul 27, 2020 M900 1 OF 3 0
Using RISERCALC version 1606.59.18.35
PROJECT DRAWING M900, DOMESTIC HOT WATER LOADS
Operating Loads Design Loads Test Loads
Description
[kg] [lbs] [kg] [lbs] [kg] [lbs]
Mass of Water 20 44 20 44 20 44
Mass of Pipe 25 56 25 56 25 56
Mass of Insulation 24 53 24 53 0 0
Mass of Cladding 8 18 8 18 0 0
Anchor 1

Mass - Expansion Joint 7 15 7 15 7 15


Mass of Guides 0 0 0 0 0 0
Expansion Load -13 -29 -26 -57 0 0
Static Pressure Load -157 -347 -540 -1,191 -810 -1,787
TOTAL -107 -236 -502 -1,106 -778 -1,716
Mass of Water 120 264 120 264 120 264
Mass of Pipe 295 651 295 651 295 651
Mass of Insulation 197 434 197 434 0 0
Mass of Cladding 69 152 69 152 0 0
Anchor 2

Mass - Expansion Joint 7 15 7 15 7 15


Mass of Guides 0 0 0 0 0 0
Expansion Load 14 30 26 58 0 0
Static Pressure Load 157 347 540 1,191 810 1,787
TOTAL 859 1,893 1,268 2,797 1,246 2,748
Mass of Water
Mass of Pipe
Mass of Insulation
Mass of Cladding
Mass of Joint
Mass of Guides
Expansion Load
Static Pressure Load
TOTAL
Mass of Water
Mass of Pipe
Mass of Insulation
Mass of Cladding
Mass of Joint
Mass of Guides
Expansion Load
Static Pressure Load
TOTAL
NOTES
Positive loads are DOWN, and negative loads are UP.
The structural Engineer shall verify the building capacity to support the anchor loads.
Estimated anchor loads include no factors, and are based on a pressure test of 1500.0 kPag (218 psig)
Seismic and dynamic loads are not included. Loads caused by water hammer are not included.
The pipe weights include a safety margin of 5.0 %.

THIS DOCUMENT IS THE PROPERTY OF . THE DATA HEREIN IS NOT TO BE DISCLOSED IN ANY FORM TO ANYONE WITHOUT THE WRITTEN PERMISSION OF .

CUSTOMER:

PROJECT: RISER TITLE:

HOT WATER DUMMY


LEVEL 2 TO LEVEL 22
PROJECT # DATE: RISER CALCULATION No. SHEET REV.
Jul 27, 2020 M900 2 OF 3 0
Using RISERCALC version 1606.59.18.35
PROJECT DRAWING M900, DOMESTIC HOT WATER DEFLECTIONS
Deflection Results Operating Design Vertical Rise
Top (Floor 22) to Anchor 1 (Floor 21)-
3.48 mm 0.137 in 6.77 mm 0.266 in 6.4 m 21.16 ft
TOTAL
Anchor 1 (Floor 21) to Anchor 2 (Floor
25.44 mm 1.002 in 49.53 mm 1.950 in 47.2 m 154.86 ft
5)- TOTAL
Anchor 2 (Floor 5) to Bottom (Floor 2)-
3.18 mm 0.125 in 6.19 mm 0.244 in 5.9 m 19.36 ft
TOTAL

Temperature Differential 45.556 °C 82.0 °F 71.778 °C 129.2 °F


Expansion Rate - Carbon Steel STD 0.539 mm/m 0.65 in/100-ft 1.049 mm/m 1.26 in/100-ft

NOTES
Differential Deflection: minus values indicate contraction (cold) movements and positive values represent expansion (hot) movements.
Calculated pipe expansion for sizing the expansion joint, is based on 54.0 to -17.8 °C (129.2 to 0.0 °F) plus 25.0 % safety factor.
Calculated operating pipe expansion, is based on 50.0 to 4.4 °C (122.0 to 40.0 °F)
The calculated deflections do not include building creep and shrinkage.
Top and bottom pipes to be located so that the insulation clears the underneath of the slab sufficiently to allow for the movement of the pipe.
THIS DOCUMENT IS THE PROPERTY OF . THE DATA HEREIN IS NOT TO BE DISCLOSED IN ANY FORM TO ANYONE WITHOUT THE WRITTEN PERMISSION
OF .
CUSTOMER:
0
0
0 0
0 0
0 0
PROJECT: RISER TITLE:
0
0 HOT WATER DUMMY
0 LEVEL 2 TO LEVEL 22
PROJECT # DATE: RISER CALCULATION No. SHEET REV.
Jul 27, 2020 M900 3 OF 3 0
Using RISERCALC version 1606.59.18.35