Professional Documents
Culture Documents
Copie de Travail: Pressure Testing of Nonmetallic Fuel Tanks
Copie de Travail: Pressure Testing of Nonmetallic Fuel Tanks
Copie de Travail: Pressure Testing of Nonmetallic Fuel Tanks
5.3.5 Introduce pressure into the tank through the 7.5 Include photographs of any damage or areas
inlet check valve until burst. Choose a rate to where leak was detected per 6.4.
complete test within 30 s.
8 Safety
6 Evaluation and Rating
This standard may involve hazardous materials,
6.1 During the test, record the pressure at the first operations, and equipment. This standard does not
evidence of leak. propose to address all the safety problems
associated with its use. It is the responsibility of the
Acceptance Criteria: Tank must show no
user of the standard to establish appropriate safety
evidence of bursting, splitting or leaking below the
and health practices and determine the
specified pressure.
applicability of regulatory limitations prior to use.
6.2 Once the sample has burst or the pressure no
longer increases, record the pressure value as 9 Notes
ultimate burst pressure.
9.1 Glossary. Not applicable.
6.3 Record time to reach ultimate pressure.
9.2 Acronyms, Abbreviations, and Symbols.
6.4 Photograph any damage and the location of
any leak. MRA Module Reservoir Assembly