Professional Documents
Culture Documents
All Types of Soil, Including Backfilling Up To Ground Level With Approved Material As Directed by Engineer-in-Charge
All Types of Soil, Including Backfilling Up To Ground Level With Approved Material As Directed by Engineer-in-Charge
All Types of Soil, Including Backfilling Up To Ground Level With Approved Material As Directed by Engineer-in-Charge
Item
Description Unit No L B D Quantity
No.
1.0 Earthwork in excavation of foundation for structures
completeTechnical Specification Clause 304
i) HYSD Steel
Abutments No.s 0.00
Piers No.s 0.00
Retaining wall (Part-2) No.s 0.00
Total = 0.00
6.0 Providing & laying concrete for retaining strucutres like
wing-return, curtain wall, toe wall, head wall etc.
including formwork, excluding reinforcement complete
as per drawing, technical specification.
Item
Description Unit No L B D Quantity
No.
0.00
ii) PCC M20 Cum 0.00
Total = 0.00
iii) RCC M30 Cum 0.00
Total = 0.00
7.0 Carrying out empty boring for piles in all types of strata
including all tools & plants, machinery, disposal of
excavated material upto lead of 1000m etc. complete
and as directed by the engineer incharge.
i) RCC M35
Abutments Cum 0 0.000 14.500 0.000 0.00
Piers Cum 0 0.000 0.000 0.000 0.00
Project #REF!
Item
Description Unit No L B D Quantity
No.
Total = 0.00
18.0 Providing & laying foundation concrete for piers,
abutments, wing walls, retaining walls etc. including
formwork, machinery and workmanship complete as
per drawing and technical specification 1500,1700, 2100
& 2200
i) PCC/RCC M20
Total = 0
ii) RCC M30
Retaining wall part2 -Uniform width Cum 0 24.872 6.100 0.300 0.00
Retaining wall part2 --- Varying width Cum 0 24.872 3.425 0.450 0.00
Total = 0
iii) RCC M30
Total = 0
iv) RCC M35
Abutment -Uniform width Cum 2 8.600 14.500 0.500 125
Abutment-- Varying width Cum 2 5.000 14.500 0.500 73
Pier-Uniform width Cum 0 8.500 10.000 0.500 0
Pier-- Varying width Cum 0 Vol = 25.5 0
Pier Pedestals Cum 0 0.000 0.000 0.000 0
Total = 197
19.0 Providing & laying substructure concrete for piers,
abutments, columns, shafts portal, stems, counterforts
etc. including formwork, machinery and workmanship
complete as per drawing and technical specification.
clauses 1500,1700,2200
i) RCC M20
Total = 0
ii) RCC M30
Retaining wall part2 Cum 0 24.872 0.625 9.062 0.00
Bracket over retaining wall Cum 0 24.872 area = 0.18 0.00
Total = 0
ii) RCC M30
Total = 0
iii) RCC M35
Abutment Cum 2 14.50 1.10 7.380 235.41
Piers (Wall type) Cum 0 8.10 1.10 4.780 0.00
Pier (Cut Waters) Cum 0 Area = 0.24 4.780 0.00
Retaining wall (Part-1) Cum 4 5.000 0.600 10.482 125.78
Stub Below Gap Slab Cum 0 14.500 area = 0.700 0.00
Total = 361.19
20.0 Providing & laying cap concrete for abt-cap, piercap
dirtwall, bracket, corbells, etc. including formwork,
machinery and workmanship complete as per drawing
and technical specification. 1500,1700,2200
Item
Description Unit No L B D Quantity
No.
Piercap (Varyingportion) Cum 0 2.600 8.550 1.000 0.00
Dirt wall Cum 2 14.500 0.300 2.553 22.21
Bracket Cum 2 14.500 area = 0.135 3.92
Total = 38.74
21.0 Providing and laying pedestal concrete, seismic
restrainer etc. including centering and shuttering but
excluding cost of reinforcement, all complete as per
drawing and technical specifications and as directed by
the engineer incharge.
Item
Description Unit No L B D Quantity
No.
Cross girder Cum 0 Area = 0.000 0.000 0.00
Total = 0.00
28.0 Structural Cement concrete for Reinforced cement
concrete/PSC for GIRDER including centering complete
as per drawing Technical specification clauses
809,1500,1700
MT
Total = 0.00
Project #REF!
Item
Description Unit No L B D Quantity
No.
37.0 Providing and laying bituminous wearing coat
comprising 50 mm thickness using crushed aggregates
of grading-I, premixed with bituminous binder and filler,
transporting the hot mix to work site, laying with a
hydrostatic paver finisher with sensor control to the
required grade, level and alignment, rolling with smooth
wheeled, vibratory and tandem rollers to achieve the
desired compaction all complete as per technical
specification and as directed by the engineer incharge.
509, 515, 521, & 2700.
Item
Description Unit No L B D Quantity
No.
47.0 Providing and laying of strip seal expansion joint
catering to maximum horizontal movement up to
70mm, complete as per approved drawing and standard
specifications to be installed by manufacturer/supplier
or their authorized representative ensuring compliances
to the manufacturer's instructions for installations.
rm 4 14.50 58.00
48.0 Providing and laying of a modular box steel expansion
joint including anchorage catering to a horizontal
movement beyond 70mm complete as per approved
drawings and standard specifications to be installed by
the manufacturer/supplier or their authorised
representative ensuring compliance to the
manufacturer's instructions for installation.)
rm 0 14.50 0.00
49.0 Providing and fixing of drainage spouts along with drain
pipes complete as per drawing and technical
specifications and as directed by the engineer. clause
2705.
Nos 20 20.00
50.0 Providing and fixing 100 mm downtake runner pipes
from drainage spout outlet including all accessories
complete as per drawings and technical specifications
and as directed by the engineer incharge.
Rm 0 26.00 0.00
51.0 Providing and laying of filter media behind walls of
abutment, retaining wall etc. with granular materials /
stone crushed aggregates satisfying the requirements
laid down in MoRTH to a thickness of not less than 600
mm with smaller size towards the soil and bigger size
towards the wall and provided over the entire surface
behind abutment, wing wall and return wall to the full
height compacted to a firm condition complete as per
drawing and technical specification. Clause 2504.2.2
Item
Description Unit No L B D Quantity
No.
i) Foundations
Abutments Mt 65 kg per m3 of concrete 12.82
Piers Mt 100 kg per m3 of concrete 0.00
Piles Mt 120 kg per m3 of concrete 0.00
Retaining walls (Part-II) Mt 60 kg per m3 of concrete 0.00
ii) Sub structure
Abutments Mt 120 kg per m3 of concrete 28.25
Abutment Cap, Dirt wall, Bracket Mt 150 kg per m3 of concrete 5.81
Piers Mt 140 kg per m3 of concrete 0.00
Pier Cap Mt 180 kg per m3 of concrete 0.00
Return walls (Part-I) Mt 100 kg per m3 of concrete 12.58
Retaining walls (Part-II) Mt 100 kg per m3 of concrete 0.00
Bearing Pesestals Mt 180 kg per m3 of concrete 0.33
Stub Below Gap Slab Mt 100 kg per m3 of concrete 0.00
iii) Super Structure
RCC I Girders Mt 230 kg per m3 of concrete 47.36
PSC I Girders Mt 130 kg per m3 of concrete 0.00
Deck Slab Mt 150 kg per m3 of concrete 21.75
Cross Girders Mt 250 kg per m3 of concrete 12.07
Gap Slab Mt 100 kg per m3 of concrete 0.00
Total = 140.96
55.0 Providing and fixing high tensile steel wires / strands
including all accessories for stressing, stressing
operations and grouting complete as per drawing and
technical specifications 1800,1009
Mt 60 kg per m3 of concrete 0.00
57.0 Providing Back filling behind abutments, wing walls and
return walls, with selected imported granular material
of approved quality as per Technical Specification
Clause 305.
Item
Description Unit No L B D Quantity
No.
ii) Routine pile test Nos 0 0.00
64.0 Carrying out load test of superstructure as directed
including all necessary materials, plant equipments,
instruments, labour & arrangements for test as
required.
Mt 1 200 200.00
68.0 Providing and applying ordinary paints of approved
quality on surface of parapets / crash barrier as per
drawings and as per the directions of the engineer.
Perime
Sqm 4 42.436 ter = 3 509.23
69.0 Printing of structure number, span arrangement & flow
direction of any shade with synthetic enamel paint black
or any other approved colour to give an even shade as
complete as per technical specifications and as directed
by the engineer incharge.
Nos 2 2.00
70.00 Confirmatory boreholes Rm 1 10.00 10.00
Name of Project : #REF!
Total
Item Str. conc Description Unit Quantity
Quantity
82 /- 46 334
103 /- 24 943
0 /-
0 /-
4169 /- 1 07 860
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
5360 /-
5444 /- 10 73 557
0 /-
0 /-
0 /-
5858 /-
5942 /- 21 46 191
0 /-
0 /-
0 /-
6771 /- 2 62 287
0 /-
0 /-
6771 /- 12 272
0 /-
2 /- 4 69 625
0 /-
115000 /-
125000 /-
140000 /-
150000 /-
160000 /-
0 /-
0 /-
85 /- 1 479
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
6771 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
6771 /- 13 08 620
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
0 /-
343 /- 2 55 604
343 /- 2 55 604
0 /-
4169 /- 1 26 946
12180 /- 7 41 762
4186 /- 7 10 548
0 /-
0 /-
0 /-
0 /-
0 /-
244 /- 14 152
10452 /- 6 06 216
0 /-
766 /- 15 320
0 /-
1183 /- 3 19 959
0 /-
257 /- 1 09 482
74630 /- 1 05 20 059
0 /-
0 /-
0 /-
731 /- 9 37 258
0 /-
0 /-
0 /-
0 /-
1440 /-
1966 /-
0 /-
0 /-
0 /-
5000 /- 10 00 000
0 /-
0 /-
0 /-
76 /- 38 702
114 /- 228
3000 /- 30 000
2 11 35 007
Name of Project :
#REF!
MoRT&H
Item Spec Description Unit Quantity Final Rate Amount
Reference
MoRT&H
Item Spec Description Unit Quantity Final Rate Amount
Reference
MoRT&H
Item Spec Description Unit Quantity Final Rate Amount
Reference
MoRT&H
Item Spec Description Unit Quantity Final Rate Amount
Reference
MoRT&H
Item Spec Description Unit Quantity Final Rate Amount
Reference
MoRT&H
Item Spec Description Unit Quantity Final Rate Amount
Reference
MoRT&H
Item Spec Description Unit Quantity Final Rate Amount
Reference
809, 1500,
Providing and constructing RCC M40 crash barrier
1600, 1700,
40 including centering, shuttering and reinforcement etc. LM 169.7 4186 /- 7 10 548
all complete as per technical specifications.
IRC-5
MoRT&H
Item Spec Description Unit Quantity Final Rate Amount
Reference
MoRT&H
Item Spec Description Unit Quantity Final Rate Amount
Reference
MoRT&H
Item Spec Description Unit Quantity Final Rate Amount
Reference