Lock Out Tag Out-Permit To Work Process Flow Chart: EPC Sub-Contractor
Lock Out Tag Out-Permit To Work Process Flow Chart: EPC Sub-Contractor
Lock Out Tag Out-Permit To Work Process Flow Chart: EPC Sub-Contractor
STAGE
SUB-CONTRACTOR EPC
ORIGINATOR PERFORMERS / SUPERVISOR AUTORIZED PERSON SENIOR AUTHORIZED PERSON PERMIT APPLICANT / COORDINATOR LOTO ENGINEER AUTORIZED PERSON SENIOR AUTHORIZED PERSON COMMISSIONING MANAGER PERMIT COORDINATOR
Collects the permit and ensures all Recieves the Permit and hand it over to
control measures are in place the Performer.
Invites the AE & LOTO Engineer for Checks the control measures and the isolation
a joint meeting points identified.
NO
DANGER TAG STAGE PTW Valid
YES
Work In-
NO
complete
YES
CAUTION TAG STAGE / Removes the Personal / Group After Last person removing the personal lock
EXTENSION Locks and inform others and the replace DANGER TAGS with CAUTION / OUT
LOTO Engineer OF SERVICE TAGS
PTW CLOSE-OUT
Submit the Closed permit documents to Closes the Permit and retrieves
EPC Permit Coordinator all the required documents