Professional Documents
Culture Documents
SP1 Aug 2012
SP1 Aug 2012
SP1 Aug 2012
SIARAN KHAS
Special Release 1
SABAH & SARAWAK
OGOS 2012
AUGUST 2012
Muka Surat
Page
Jadual 2 : Harga unit purata bagi bitumen, minyak bahan api & diesel 4
Table 2 : Average unit prices for bitumen, fuel oil & diesel
Nota Teknikal 23
Technical Notes
i
JADUAL
TABLE
Jadual 1: Harga unit purata bagi bar keluli dan simen
Table 1: Average unit prices for steel bars and cement
Kawasan*
Region
Sabah Sarawak
Tempoh
Item
Period
G H I J K L
10mm (3/8") 2011 Dis 2834.00 3020.07 3125.00 2690.00 2693.33 2388.50
2012 Jan 2794.00 3020.07 3100.00 2690.00 2643.33 2388.50
Feb 2794.00 3003.40 2991.10 2665.00 2660.00 2388.50
Mac 2794.00 3003.40 2991.10 2690.00 2733.33 2468.00
Apr 2810.00 2909.70 3077.00 2732.50 2750.00 2547.50
Mei 2842.00 2949.13 3112.00 2801.25 2766.67 2632.50
Jun 2812.00 2949.13 3112.00 2845.00 2766.67 2632.50
Jul 2816.00 2930.80 3112.00 2837.50 2750.00 2617.50
Ogos 2810.00 2930.80 3112.00 2812.50 2733.33 2617.50
Sept
Okt
Nov
Dis
12mm (1/2") 2011 Dis 2834.00 2915.00 3125.00 2720.00 2693.33 2546.25
2012 Jan 2794.00 2915.00 3100.00 2720.00 2643.33 2546.25
Feb 2794.00 2915.00 2995.77 2695.00 2660.00 2546.25
Mac 2794.00 2915.00 2995.77 2720.00 2733.33 2547.50
Apr 2810.00 2865.00 3081.80 2762.50 2750.00 2572.50
Mei 2842.00 2888.33 3121.30 2831.25 2766.67 2632.50
Jun 2812.00 2888.33 3121.30 2875.00 2766.67 2632.50
Jul 2816.00 2870.00 3121.30 2867.50 2750.00 2617.50
Ogos 2810.00 2870.00 3121.30 2842.50 2733.33 2617.50
Sept
Okt
Nov
Dis
16mm (5/8") 2011 Dis 2745.00 3026.00 2815.00 2733.33 2660.00 2520.00
2012 Jan 2695.00 3026.00 2815.00 2733.33 2610.00 2520.00
Feb 2695.00 3026.00 2700.00 2703.33 2610.00 2520.00
Mac 2720.00 3026.00 2700.00 2720.00 2666.67 2520.00
Apr 2772.50 2976.00 2740.00 2716.67 2666.67 2520.00
Mei 2772.50 2999.33 2775.00 2770.00 2683.33 2520.00
Jun 2782.50 2999.33 2775.00 2823.33 2700.00 2520.00
Jul 2782.50 2982.67 2775.00 2823.33 2700.00 2520.00
Ogos 2757.50 2982.67 2775.00 2823.33 2683.33 2520.00
Sept
Okt
Nov
Dis
-1-
Jadual 1: Harga unit purata bagi bar keluli dan simen (samb.)
Table 1: Average unit prices for steel bars and cement (cont'd)
Kawasan*
Region
Sabah Sarawak
Tempoh
Item
Period
G H I J K L
(1) Bar bulat keluli lembut BS-4449 (samb.) RM Per Tan Metrik
Mild steel round bars BS-4449 (cont'd) RM Per Metric Ton
(2) Mycon 60
High tensile deformed bars
10mm (3/8") 2011 Dis 2780.00 2985.00 3075.00 2870.00 2693.33 2546.25
2012 Jan 2750.00 2985.00 3050.00 2870.00 2660.00 2546.25R
Feb 2740.00 2968.33 2991.10 2854.00 2676.67 2546.25
Mac 2740.00 2968.33 2991.10 2874.00 2746.67 2547.50
Apr 2804.00 2909.70 3077.00 2916.00 2763.33 2572.50
Mei 2870.00 2949.13 3112.00 2999.00 2780.00 2632.50
Jun 2862.00 2949.13 3112.00 3022.00 2780.00 2632.50
Jul 2836.00 2930.80 3112.00 3006.00 2763.33 2617.50
Ogos 2816.00 2930.00 3112.00 2986.00 2746.67 2617.50
Sept
Okt
Nov
Dis
12mm (1/2") 2011 Dis 2780.00 2988.33 3075.00 2870.00 2693.33 2546.25
2012 Jan 2750.00 2988.33 3050.00 2870.00 2660.00 2546.25
Feb 2740.00 2971.67 2995.77 2854.00 2676.67 2546.25
Mac 2740.00 2971.67 2995.77 2874.00 2746.67 2547.50
Apr 2774.00 2912.80 3081.80 2916.00 2763.33 2572.50
Mei 2870.00 2950.53 3116.80 3002.00 2780.00 2632.50
Jun 2862.00 2950.53 3116.80 3028.00 2780.00 2632.00
Jul 2836.00 2932.20 3116.80 3012.00 2763.33 2617.50
Ogos 2816.00 2932.20 3116.80 3002.00 2746.67 2617.50
Sept
Okt
Nov
Dis
R = Kemaskini/Revised
* Lihat nota kaki di hujung Jadual 1/See footnotes at end of Table 1
-2-
Jadual 1: Harga unit purata bagi bar keluli dan simen (samb.)
Table 1: Average unit prices for steel bars and cement (cont'd)
Kawasan*
Region
Sabah Sarawak
Tempoh
Item
Period
G H I J K L
32mm (1 1/4") 2011 Dis 2617.50 2770.00 3027.50 2506.67 2500.00 2546.25
2012 Jan 2580.00 2770.00 3027.50 2506.67 2450.00 2546.25
Feb 2567.00 2745.00 3027.50 2473.33 2450.00 2546.25
Mac 2567.50 2745.00 3027.50 2500.00 2450.00 2525.00
Apr 2652.50 2695.00 3027.50 2576.67 2450.00 2550.00
Mei 2722.50 2730.00 3027.50 2626.67 2450.00 2610.00
Jun 2712.50 2730.00 3027.50 2636.67 2450.00 2610.00
Jul 2687.50 2702.50 3027.50 2610.00 2450.00 2595.00
Ogos 2662.50 2702.50 3027.50 2576.67 2450.00 2595.00
Sept
Okt
Nov
Dis
Portland biasa 2011 Dis 17.38 19.75 20.00 16.79 16.86 16.95
BS 12 2012 Jan 17.38 19.75 20.00 16.79 17.42 16.95
Ordinary portland Feb 17.38 19.75 20.00 16.79 17.42 16.95
BS 12 Mac 17.38 19.75 20.00 16.79 17.42 17.00
Apr 17.38 19.75 20.00 16.79 17.67 17.00
Mei 17.38 19.75 20.00 16.79 17.67 17.00
Jun 17.38 19.75 20.00 16.79 17.67 17.00
Jul 17.38 19.75 20.00 16.95 17.67 17.00
Ogos 17.38 19.75 20.00 16.95 17.67 17.00
Sept
Okt
Nov
Dis
* Kawasan/Region
G = Kota Kinabalu
H = Sandakan
I = Tawau
J = Kuching
K = Sibu
L = Miri
-3-
Jadual 2: Harga unit purata bagi bitumen, minyak bahan api dan diesel
Table 2: Average unit prices for bitumen, fuel oil and diesel
Mulai Jun 2012, harga bitumen penembusan 80/100 adalah berdasarkan harga purata ex-Kota Kinabalu bagi Sabah dan ex-Kuching bagi
Sarawak.
Starting from June 2012, the price for bitumen 80/100 penetration is based on average ex-Kota Kinabalu for Sabah and ex-Kuching for Sarawak.
-4 -
Jadual 2: Harga unit purata bagi bitumen, minyak bahan api dan diesel (samb.)
Table 2: Average unit prices for bitumen, fuel oil and diesel (cont'd)
RM Seliter RM Seliter
(3) Minyak gas automotif RM Per Litre RM Per Litre
Automotive gas oil
Runcit* Sebenar Runcit* Sebenar
Retail Actual Retail Actual
R = Kemaskini/Revised
-5 -
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail
Kawasan*
Region
Sabah Sarawak
Tempoh
Item
Period
G H I J K L
(1) Pasir RM Per Tan Metrik
Sand RM Per Metric Ton
Pasir sungai 2011 Dis 34.79 66.64 58.31 37.67 23.28 31.00
River sand 2012 Jan 34.79 66.64 58.31 38.00 23.28 31.00
Feb 34.79 66.64 58.31 38.00 23.28 31.00
Mac 34.79 66.64 58.31 38.00 23.28 31.00
Apr 34.79 66.64 58.31 38.00 23.28 31.60R
Mei 34.79 66.64 58.31 38.00 23.28 32.30
Jun 34.79 66.64 58.31 38.00 23.28 32.30
Jul 35.70 66.64 58.31 38.00 23.28 32.30
Ogos 36.66 66.64 58.31 38.00 23.28 32.30
Sept
Okt
Nov
Dis
(2) Batu baur
Aggregates
Granite 10mm (3/8") 2011 Dis 40.00 54.00 35.33 26.58 57.00 51.00
Granite 10mm (3/8") 2012 Jan 40.50 54.00 35.33 26.58 57.00 51.00
Feb 40.50 54.00 35.33 26.58 57.00 51.00
Mac 40.50 54.00 35.33 26.58 57.00 54.50
Apr 40.50 54.00 35.33 26.58 57.00 58.00
Mei 40.50 54.00 35.33 26.58 57.00 58.00
Jun 40.50 54.00 35.33 26.58 57.00 58.00
Jul 40.50 54.00 35.33 26.58 57.00 58.00
Ogos 40.50 54.00 35.33 26.58 57.00 58.00
Sept
Okt
Nov
Dis
Granite 20mm (3/4") 2011 Dis 54.00 70.00 40.50 34.23 49.50 na
Granite 20mm (3/4") 2012 Jan 57.00 70.00 40.50 34.23 49.50 na
Feb 57.00 70.00 40.50 34.23 49.50 na
Mac 57.00 70.00 40.50 34.23 49.50 na
Apr 57.00 70.00 40.50 32.50 49.50 na
Mei 57.00 70.00 40.50 32.50 49.50 na
Jun 57.00 70.00 40.50 32.50 49.50 na
Jul 57.00 70.00 40.50 32.50 49.50 na
Ogos 57.00 70.00 40.50 33.73 49.50 na
Sept
Okt
Nov
Dis
Harga bagi pasir, batu baur dan premix adalah termasuk kos pengangkutan bagi jarak 30km dari outlet.
The prices for sand, aggregates and premix are inclusive of transportation charge for 30km from the outlets.
R = Kemaskini/Revised
* Lihat nota kaki di hujung Jadual 3/See footnotes at end of Table 3
** Harga pasir di Sarawak adalah untuk tujuan kerja-kerja konkrit sahaja.
** The sand price in Sarawak is for the purpose of concrete works only.
-6 -
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd)
Kawasan*
Region
Sabah Sarawak
Tempoh
Item
Period
G H I J K L
Granite 40mm (11/2") 2011 Dis 48.50 na 38.00 21.30 47.00 45.00
Granite 40mm (11/2") 2012 Jan 49.50 na 38.00 21.30 47.00 45.00
Feb 49.50 na 38.00 21.30 47.00 45.00
Mac 49.50 na 38.00 21.30 47.00 46.00
Apr 49.50 na 38.00 21.30 47.00 46.00
Mei 49.50 na 38.00 21.30 47.00 46.00
Jun 49.50 na 38.00 21.30 47.00 46.00
Jul 49.50 na 38.00 21.30 47.00 46.00
Ogos 49.50 na 38.00 21.30 47.00 46.00
Sept
Okt
Nov
Dis
Crusher run 2011 Dis 40.75 59.00 33.67 18.50 41.00 45.00
Crusher run 2012 Jan 41.25 59.00 33.67 18.50 41.00 45.00
Feb 41.25 59.00 33.67 18.50 41.00 45.00
Mac 41.25 59.00 33.67 18.50 41.00 45.00
Apr 40.75 59.00 33.67 18.50 41.00 45.00
Mei 40.75 59.00 33.67 18.50 41.00 45.00
Jun 40.75 59.00 33.67 18.50 41.00 45.00
Jul 40.75 59.00 33.67 18.50 41.00 45.00
Ogos 40.75 59.00 33.67 18.50 41.00 45.00
Sept
Okt
Nov
Dis
-7 -
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd)
Kawasan*
Region
Sabah Sarawak
Tempoh
Item
Period
G H I J K L
AC 14 (Wearing course) 2011 Dis 236.67 300.00 230.00 192.00 200.00 210.00
2012 Jan 236.67 300.00 230.00 182.50 200.00 210.00
Feb 246.67 300.00 230.00 182.50 200.00 210.00
Mac 246.67 300.00 230.00 182.50 200.00 210.00
Apr 246.67 300.00 230.00 182.50 215.00 212.50
Mei 246.67 300.00 230.00 182.50 215.00 212.50
Jun 246.67 300.00 230.00 182.50 215.00 212.50
Jul 246.67 300.00 230.00 182.50 215.00 212.50
Ogos 246.67 300.00 230.00 182.50 215.00 212.50
Sept
Okt
Nov
Dis
-8 -
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd)
Kawasan*
Region
Sabah Sarawak
Tempoh
Item
Period
G H I J K L
ACW 20 (Wearing course) 2011 Dis 233.33 300.00 230.00 199.50 200.00 210.00
2012 Jan 233.33 300.00 230.00 190.00 200.00 210.00
Feb 243.33 300.00 230.00 190.00 200.00 210.00
Mac 243.33 300.00 230.00 190.00 200.00 210.00
Apr 243.33 300.00 230.00 190.00 215.00 212.50
Mei 243.33 300.00 230.00 190.00 215.00 212.50
Jun 243.33 300.00 230.00 190.00 215.00 212.50
Jul 243.33 300.00 230.00 190.00 215.00 212.50
Ogos 243.33 300.00 230.00 190.00 215.00 212.50
Sept
Okt
Nov
Dis
-9 -
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd)
Kawasan*
Region
Sabah Sarawak
Tempoh
Item
Period
G H I J K L
-10 -
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd)
Kawasan*
Region
Sabah Sarawak
Tempoh
Item
Period
G H I J K L
-11 -
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd)
Kawasan*
Region
Sabah Sarawak
Tempoh
Item
Period
G H I J K L
(4) Fabric reinforcement RM Per Kg
Fabric reinforcement RM Per Kg
A4, MS145 2011 Dis 4.06 3.97 3.86 3.10 4.66 4.18
2012 Jan 3.76 3.97 3.86 3.10 4.82 4.18
Feb 3.46 3.97 3.86 3.10 4.82 4.18
Mac 3.46 3.92 3.86 3.10 4.82 4.18
Apr 3.46 3.92 3.86 3.10 4.80 4.18
Mei 3.46 3.92 3.86 3.10 4.80 4.18
Jun 3.46 3.92 3.86 3.10 4.80 4.18
Jul 3.46 3.92 3.86 3.10 4.80 3.76
Ogos 3.46 3.92 3.86 3.00 4.80 3.54
Sept
Okt
Nov
Dis
A5, MS145 2011 Dis 3.57 3.53 3.43 3.15 4.15 3.71
2012 Jan 3.35 3.53 3.43 3.15 4.28 3.71
Feb 3.11 3.53 3.43 3.15 4.28 3.71
Mac 3.11 3.49 3.43 3.18 4.28 3.71
Apr 3.11 3.49 3.43 3.18 4.27 3.71
Mei 3.11 3.49 3.43 3.18 4.27 3.71
Jun 3.11 3.49 3.43 3.18 4.27 3.71
Jul 3.11 3.49 3.43 3.18 4.27 3.34
Ogos 3.11 3.49 3.43 3.10 4.27 3.15
Sept
Okt
Nov
Dis
A6, MS145 2011 Dis 3.52 3.42 3.33 3.15 4.02 3.60
2012 Jan 3.30 3.42 3.33 3.15 4.15 3.60
Feb 3.06 3.42 3.33 3.15 4.15 3.60
Mac 3.06 3.38 3.33 3.18 4.15 3.60
Apr 3.06 3.38 3.33 3.18 4.13 3.60
Mei 3.06 3.38 3.33 3.18 4.13 3.60
Jun 3.06 3.38 3.33 3.18 4.13 3.60
Jul 3.06 3.38 3.33 3.18 4.13 3.23
Ogos 3.06 3.38 3.33 3.10 4.13 3.05
Sept
Okt
Nov
Dis
-12 -
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd)
Kawasan*
Region
Sabah Sarawak
Tempoh
Item
Period
G H I J K L
A7, MS145 2011 Dis 3.50 3.31 3.22 3.15 3.89 3.48
2012 Jan 3.27 3.31 3.22 3.15 4.01 3.48
Feb 3.04 3.31 3.22 3.15 4.01 3.48
Mac 3.03 3.27 3.22 3.18 4.01 3.48
Apr 3.03 3.27 3.22 3.18 4.00 3.48
Mei 3.03 3.27 3.22 3.18 4.00 3.48
Jun 3.03 3.27 3.22 3.18 4.00 3.48
Jul 3.03 3.27 3.22 3.18 4.00 3.13
Ogos 3.03 3.27 3.22 3.10 4.00 2.95
Sept
Okt
Nov
Dis
A8, MS145 2011 Dis 3.72 3.30 3.21 3.15 3.87 3.47
2012 Jan 3.49 3.30 3.21 3.15 4.00 3.47
Feb 3.26 3.30 3.21 3.15 4.00 3.47
Mac 3.25 3.26 3.21 3.18 4.00 3.47
Apr 3.25 3.26 3.21 3.18 3.99 3.47
Mei 3.25 3.26 3.21 3.18 3.99 3.47
Jun 3.25 3.26 3.21 3.18 3.99 3.47
Jul 3.25 3.26 3.21 3.18 3.99 3.12
Ogos 3.25 3.26 3.21 3.10 3.99 2.94
Sept
Okt
Nov
Dis
A9, MS145 2011 Dis 3.47 3.22 3.13 3.18 3.78 3.39
2012 Jan 3.25 3.22 3.13 3.15 3.91 3.39
Feb 3.01 3.22 3.13 3.15 3.91 3.39
Mac 3.01 3.18 3.13 3.18 3.91 3.39
Apr 3.01 3.18 3.13 3.18 3.89 3.39
Mei 3.01 3.18 3.13 3.18 3.89 3.39
Jun 3.01 3.18 3.13 3.18 3.89 3.39
Jul 3.01 3.18 3.13 3.18 3.89 3.05
Ogos 3.01 3.18 3.13 3.10 3.89 2.87
Sept
Okt
Nov
Dis
-13 -
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd)
Kawasan*
Region
Sabah Sarawak
Tempoh
Item
Period
G H I J K L
A10, MS145 2011 Dis 3.52 3.42 3.33 3.18 4.02 3.60
2012 Jan 3.29 3.42 3.33 3.15 4.15 3.60
Feb 3.06 3.42 3.33 3.15 4.15 3.60
Mac 3.06 3.38 3.33 3.18 4.15 3.60
Apr 3.06 3.38 3.33 3.18 4.13 3.60
Mei 3.06 3.38 3.33 3.18 4.13 3.60
Jun 3.06 3.38 3.33 3.18 4.13 3.60
Jul 3.06 3.38 3.33 3.18 4.13 3.23
Ogos 3.06 3.38 3.33 3.10 4.13 3.05
Sept
Okt
Nov
Dis
B5, MS145 2011 Dis 3.00 3.37 3.27 3.20 3.95 3.54
2012 Jan 3.00 3.37 3.27 3.20 4.08 3.54
Feb 2.99 3.37 3.27 3.20 4.08 3.54
Mac 2.98 3.32 3.27 3.23 4.08 3.54
Apr 2.98 3.32 3.27 3.23 4.07 3.54
Mei 2.98 3.32 3.27 3.23 4.07 3.54
Jun 2.98 3.32 3.27 3.23 4.07 3.54
Jul 2.98 3.32 3.27 3.23 4.07 3.18
Ogos 2.98 3.32 3.27 3.15 4.07 3.00
Sept
Okt
Nov
Dis
B6, MS145 2011 Dis 3.51 3.37 3.27 3.20 3.95 3.54
2012 Jan 3.28 3.37 3.27 3.20 4.08 3.54
Feb 3.04 3.37 3.27 3.20 4.08 3.54
Mac 3.05 3.32 3.27 3.23 4.08 3.54
Apr 3.05 3.32 3.27 3.23 4.07 3.54
Mei 3.05 3.32 3.27 3.23 4.07 3.54
Jun 3.05 3.32 3.27 3.23 4.07 3.54
Jul 3.05 3.32 3.27 3.23 4.07 3.18
Ogos 3.05 3.32 3.27 3.15 4.07 3.00
Sept
Okt
Nov
Dis
-14 -
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd)
Kawasan*
Region
Sabah Sarawak
Tempoh
Item
Period
G H I J K L
(4) Fabric reinforcement (samb.) RM Per Kg
Fabric reinforcement (cont'd) RM Per Kg
B7, MS145 2011 Dis 3.73 3.37 3.27 3.20 3.95 3.54
2012 Jan 3.51 3.37 3.27 3.20 4.08 3.54
Feb 3.27 3.37 3.27 3.20 4.08 3.54
Mac 3.27 3.32 3.27 3.23 4.08 3.54
Apr 3.27 3.32 3.27 3.23 4.07 3.54
Mei 3.27 3.32 3.27 3.23 4.07 3.54
Jun 3.27 3.32 3.27 3.23 4.07 3.54
Jul 3.27 3.32 3.27 3.23 4.07 3.18
Ogos 3.26 3.32 3.27 3.15 4.07 3.00
Sept
Okt
Nov
Dis
B8, MS145 2011 Dis 3.50 3.31 3.22 3.20 3.89 3.48
2012 Jan 3.28 3.31 3.22 3.20 4.01 3.48
Feb 3.04 3.31 3.22 3.20 4.01 3.48
Mac 3.04 3.27 3.22 3.23 4.01 3.48
Apr 3.04 3.27 3.22 3.23 4.00 3.48
Mei 3.04 3.27 3.22 3.23 4.00 3.48
Jun 3.04 3.27 3.22 3.23 4.00 3.48
Jul 3.04 3.27 3.22 3.23 4.00 3.13
Ogos 3.03 3.27 3.22 3.15 4.00 2.95
Sept
Okt
Nov
Dis
B9, MS145 2011 Dis 3.51 3.39 3.30 3.23 3.98 3.56
2012 Jan 3.29 3.39 3.30 3.20 4.11 3.56
Feb 3.05 3.39 3.30 3.20 4.11 3.56
Mac 3.05 3.35 3.30 3.23 4.11 3.56
Apr 3.05 3.35 3.30 3.23 4.09 3.56
Mei 3.05 3.35 3.30 3.23 4.09 3.56
Jun 3.05 3.35 3.30 3.23 4.09 3.56
Jul 3.05 3.35 3.30 3.23 4.09 3.20
Ogos 3.05 3.35 3.30 3.15 4.09 3.02
Sept
Okt
Nov
Dis
-15 -
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd)
Kawasan*
Region
Sabah Sarawak
Tempoh
Item
Period
G H I J K L
B10, MS145 2011 Dis 3.05 3.49 3.39 3.23 4.09 3.67
2012 Jan 3.05 3.49 3.39 3.20 4.23 3.67
Feb 3.03 3.49 3.39 3.20 4.23 3.67
Mac 3.03 3.44 3.39 3.23 4.23 3.67
Apr 3.03 3.44 3.39 3.23 4.21 3.67
Mei 3.03 3.44 3.39 3.23 4.21 3.67
Jun 3.03 3.44 3.39 3.23 4.21 3.67
Jul 3.03 3.44 3.39 3.23 4.21 3.30
Ogos 3.03 3.44 3.39 3.15 4.21 3.11
Sept
Okt
Nov
Dis
B12, MS145 2011 Dis 3.02 3.48 3.38 3.20 4.08 3.66
2012 Jan 3.02 3.48 3.38 3.20 4.21 3.66
Feb 3.00 3.48 3.38 3.20 4.21 3.66
Mac 3.00 3.43 3.38 3.25 4.21 3.66
Apr 3.00 3.43 3.38 3.25 4.20 3.66
Mei 3.00 3.43 3.38 3.25 4.20 3.66
Jun 3.00 3.43 3.38 3.25 4.20 3.66
Jul 3.00 3.43 3.38 3.20R 4.20 3.29
Ogos 3.00 3.43 3.38 3.20 4.20 3.10
Sept
Okt
Nov
Dis
C5, MS145 2011 Dis 3.07 3.33 3.24 3.20 3.91 3.51
2012 Jan 3.07 3.33 3.24 3.20 4.04 3.51
Feb 3.04 3.33 3.24 3.20 4.04 3.51
Mac 3.04 3.29 3.24 3.23 4.04 3.51
Apr 3.04 3.29 3.24 3.23 4.03 3.51
Mei 3.04 3.29 3.24 3.23 4.03 3.51
Jun 3.04 3.29 3.24 3.23 4.03 3.51
Jul 3.04 3.29 3.24 3.23 4.03 3.15
Ogos 3.04 3.29 3.24 3.15 4.03 2.97
Sept
Okt
Nov
Dis
R = Kemaskini/Revised
* Lihat nota kaki di hujung Jadual 3/See footnotes at end of Table 3
-16 -
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd)
Kawasan*
Region
Sabah Sarawak
Tempoh
Item
Period
G H I J K L
C6, MS145 2011 Dis 3.08 3.56 3.47 3.20 4.19 3.75
2012 Jan 3.08 3.56 3.47 3.20 4.23 3.75
Feb 3.06 3.56 3.47 3.20 4.23 3.75
Mac 3.06 3.52 3.47 3.23 4.23 3.75
Apr 3.06 3.52 3.47 3.23 4.31 3.75
Mei 3.06 3.52 3.47 3.23 4.31 3.75
Jun 3.06 3.52 3.47 3.23 4.31 3.75
Jul 3.06 3.52 3.47 3.23 4.31 3.37
Ogos 3.06 3.52 3.47 3.15 4.31 3.18
Sept
Okt
Nov
Dis
C7, MS145 2011 Dis 3.06 3.51 3.41 3.20 4.12 3.69
2012 Jan 3.06 3.51 3.41 3.20 4.25 3.69
Feb 3.03 3.51 3.41 3.20 4.25 3.69
Mac 3.03 3.47 3.41 3.23 4.25 3.69
Apr 3.03 3.47 3.41 3.23 4.24 3.69
Mei 3.03 3.47 3.41 3.23 4.24 3.69
Jun 3.03 3.47 3.41 3.23 4.24 3.69
Jul 3.03 3.47 3.41 3.23 4.24 3.32
Ogos 3.03 3.47 3.41 3.15 4.24 3.13
Sept
Okt
Nov
Dis
C8, MS145 2011 Dis 3.08 3.56 3.47 3.20 4.19 3.75
2012 Jan 3.08 3.56 3.47 3.20 4.32 3.75
Feb 3.05 3.56 3.47 3.20 4.32 3.75
Mac 3.05 3.52 3.47 3.23 4.32 3.75
Apr 3.05 3.52 3.47 3.23 4.31 3.75
Mei 3.05 3.52 3.47 3.23 4.31 3.75
Jun 3.05 3.52 3.47 3.23 4.31 3.75
Jul 3.05 3.52 3.47 3.23 4.31 3.37
Ogos 3.05 3.52 3.47 3.15 4.31 3.18
Sept
Okt
Nov
Dis
-17 -
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd)
Kawasan*
Region
Sabah Sarawak
Tempoh
Item
Period
G H I J K L
C9, MS145 2011 Dis 3.04 3.48 3.38 3.23 4.08 3.66
2012 Jan 3.04 3.48 3.38 3.20 4.21 3.66
Feb 3.02 3.48 3.38 3.20 4.21 3.66
Mac 3.02 3.43 3.38 3.23 4.21 3.66
Apr 3.02 3.43 3.38 3.23 4.20 3.66
Mei 3.02 3.43 3.38 3.23 4.20 3.66
Jun 3.02 3.43 3.38 3.23 4.20 3.66
Jul 3.02 3.43 3.38 3.23 4.20 3.29
Ogos 3.02 3.43 3.38 3.15 4.20 3.10
Sept
Okt
Nov
Dis
C10, MS145 2011 Dis 3.06 3.52 3.42 3.23 4.13 3.70
2012 Jan 3.06 3.52 3.42 3.20 4.27 3.70
Feb 3.03 3.52 3.42 3.20 4.27 3.70
Mac 3.03 3.48 3.42 3.23 4.27 3.70
Apr 3.03 3.48 3.42 3.23 4.25 3.70
Mei 3.03 3.48 3.42 3.23 4.25 3.70
Jun 3.03 3.48 3.42 3.23 4.25 3.70
Jul 3.03 3.48 3.42 3.23 4.25 3.33
Ogos 3.03 3.48 3.42 3.15 4.25 3.14
Sept
Okt
Nov
Dis
DA4, MS145 2011 Dis 3.11 3.61 3.51 3.25 4.24 3.80
2012 Jan 3.11 3.61 3.51 3.20 4.37 3.80
Feb 3.08 3.61 3.51 3.20 4.37 3.80
Mac 3.08 3.56 3.51 3.20 4.37 3.80
Apr 3.08 3.56 3.51 3.20 4.36 3.80
Mei 3.08 3.56 3.51 3.20 4.36 3.80
Jun 3.08 3.56 3.51 3.20 4.36 3.80
Jul 3.08 3.56 3.51 3.20 4.36 3.41
Ogos 3.08 3.56 3.51 3.10 4.36 3.22
Sept
Okt
Nov
Dis
-18 -
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd)
Kawasan*
Region
Sabah Sarawak
Tempoh
Item
Period
G H I J K L
DA5, MS145 2011 Dis 3.31 3.65 3.55 3.23 4.29 3.84
2012 Jan 3.31 3.65 3.55 3.20 4.43 3.84
Feb 3.31 3.65 3.55 3.20 4.43 3.84
Mac 3.31 3.61 3.55 3.23 4.43 3.84
Apr 3.31 3.61 3.55 3.23 4.41 3.84
Mei 3.31 3.61 3.55 3.23 4.41 3.84
Jun 3.31 3.61 3.55 3.23 4.41 3.84
Jul 3.31 3.61 3.55 3.23 4.41 3.45
Ogos 3.31 3.61 3.55 3.15 4.41 3.25
Sept
Okt
Nov
Dis
DA6, MS145 2011 Dis 3.23 3.54 3.45 3.23 4.16 3.73
2012 Jan 3.23 3.54 3.45 3.20 4.29 3.73
Feb 3.23 3.54 3.45 3.20 4.29 3.73
Mac 3.23 3.50 3.45 3.23 4.29 3.73
Apr 3.23 3.50 3.45 3.23 4.28 3.73
Mei 3.23 3.50 3.45 3.23 4.28 3.73
Jun 3.23 3.50 3.45 3.23 4.28 3.73
Jul 3.23 3.50 3.45 3.23 4.28 3.35
Ogos 3.23 3.50 3.45 3.15 4.28 3.16
Sept
Okt
Nov
Dis
DA7, MS145 2011 Dis 3.12 3.43 3.34 3.23 4.03 3.61
2012 Jan 3.12 3.43 3.34 3.20 4.16 3.61
Feb 3.12 3.43 3.34 3.20 4.16 3.61
Mac 3.12 3.39 3.34 3.23 4.16 3.61
Apr 3.12 3.39 3.34 3.23 4.15 3.61
Mei 3.12 3.39 3.34 3.23 4.15 3.61
Jun 3.12 3.39 3.34 3.23 4.15 3.61
Jul 3.12 3.39 3.34 3.23 4.15 3.24
Ogos 3.12 3.39 3.34 3.15 4.15 3.06
Sept
Okt
Nov
Dis
-19 -
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd)
Kawasan*
Region
Sabah Sarawak
Tempoh
Item
Period
G H I J K L
DA8, MS145 2011 Dis 3.07 3.38 3.28 3.23 3.97 3.55
2012 Jan 3.07 3.38 3.28 3.20 4.09 3.55
Feb 3.07 3.38 3.28 3.20 4.09 3.55
Mac 3.07 3.34 3.28 3.23 4.09 3.55
Apr 3.07 3.34 3.28 3.23 4.08 3.55
Mei 3.07 3.34 3.28 3.23 4.08 3.55
Jun 3.07 3.34 3.28 3.23 4.08 3.55
Jul 3.07 3.34 3.28 3.23 4.08 3.19
Ogos 3.07 3.34 3.28 3.15 4.08 3.01
Sept
Okt
Nov
Dis
DA9, MS145 2011 Dis 3.07 3.37 3.27 3.23 3.95 3.54
2012 Jan 3.07 3.37 3.27 3.20 4.08 3.54
Feb 3.07 3.37 3.27 3.20 4.08 3.54
Mac 3.07 3.32 3.27 3.23 4.08 3.54
Apr 3.07 3.32 3.27 3.23 4.08 3.54
Mei 3.07 3.32 3.27 3.23 4.08 3.54
Jun 3.07 3.32 3.27 3.23 4.08 3.54
Jul 3.07 3.32 3.27 3.23 4.08 3.18
Ogos 3.07 3.32 3.27 3.15 4.08 3.00
Sept
Okt
Nov
Dis
DA10, MS145 2011 Dis 3.20 3.51 3.41 3.23 4.12 3.69
2012 Jan 3.20 3.51 3.41 3.20 4.25 3.69
Feb 3.20 3.51 3.41 3.20 4.25 3.69
Mac 3.20 3.47 3.41 3.23 4.25 3.69
Apr 3.20 3.47 3.41 3.23 4.24 3.69
Mei 3.20 3.47 3.41 3.23 4.24 3.69
Jun 3.20 3.47 3.41 3.23 4.24 3.69
Jul 3.20 3.47 3.41 3.23 4.24 3.32
Ogos 3.20 3.47 3.41 3.15 4.24 3.13
Sept
Okt
Nov
Dis
-20 -
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd)
Kawasan*
Region
Sabah Sarawak
Tempoh
Item
Period
G H I J K L
Harga guardrail adalah termasuk kos pengangkutan bagi jarak 30km dari outlet.
The prices for guardrail are inclusive of transportation charges for 30km from the outlets.
-21 -
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement dan guardrail (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement and guardrail (cont'd)
Kawasan*
Region
Sabah Sarawak
Tempoh
Item
Period
G H I J K L
* Kawasan/Region
G = Kota Kinabalu
H = Sandakan
I = Tawau
J = Kuching
K = Sibu
L = Miri
-22 -
NOTA TEKNIKAL
TECHNICAL NOTES
NOTA TEKNIKAL TECHNICAL NOTES
Mulai Januari 2011, harga bar keluli, simen Starting from January 2011, the prices for
dan fabric reinforcement yang diterbitkan steel bars, cement and fabric reinforcement
dalam Siaran Khas 1 ini diperoleh dari published in this Special Release 1 are
pungutan harga yang dibuat oleh Jabatan obtained from the price collection conducted
Perangkaan Malaysia. by Department of Statistics, Malaysia.
Harga yang dilaporkan adalah mengikut 3 Prices are reported according to 3 regions
kawasan di Sabah dan 3 kawasan di in Sabah and 3 regions in Sarawak as
Sarawak seperti berikut: follows:
Sarawak = Kuching, Sibu dan Miri Sarawak = Kuching, Sibu and Miri
Harga diesel adalah harga kawalan kerajaan The price for diesel is government
yang diperoleh dari Kementerian controlled price which obtained from the
Perdagangan Dalam Negeri, Koperasi dan Ministry of Domestic Trade, Co-operatives
Kepenggunaan. and Consumerism.
Harga bagi bahan-bahan binaan lain (yang The prices for other building materials (not
tidak dinyatakan di atas) adalah diperoleh stated above) are obtained from the price
dari pungutan harga yang dibuat oleh collection conducted by Department of
Jabatan Perangkaan Malaysia. Statistics, Malaysia.
Semua harga yang tersebut di atas adalah All prices mentioned above are relevant for
bagi tujuan pengiraan kadar perubahan escalation purposes only and should not be
harga sahaja dan tidak boleh digunakan used to represent actual price levels.
untuk mewakili kedudukan harga yang
sebenar.
-23-