Professional Documents
Culture Documents
S-090100-02FRM Daily Job Order (ENGINE) - Sample
S-090100-02FRM Daily Job Order (ENGINE) - Sample
S-090100-02FRM Daily Job Order (ENGINE) - Sample
Working schedule Safety Equipment : ED/Ear Diffender(Maff, Plugs), SH/Safety Harness, EP/Eye Protection, LG/Leather Gloves, DM/Dust Mask,
OI/Oxygen Indicator, GI/Gas Indicator, GW/Gas Watch, SR/Safety Rope, BA/Breathing Apparatus, FD/Portable Fan and Air Duct, FE/Fire
Rank (Name) 00 02 04 06 08 10 NN 14 16 18 20 22 MN Extinguisher, FS/Face Shield, RG/Rubber Glove, RB/Safety Rubber Boots, WP/Welding Protection, WC/Warm Cloth, WG/Winter Glove,
R R 3 3 7 7 IB/Insulated Boots, HG/Heat Insulated Glove, HC/Heat Protective Cloth, LA/Leather Apron, RA/Rubber Apron, FV/Flotation Work Vest,
C/E CR/Chemical-cartridge Respirator
4 4 4 4 4 4 4 7 7
1A/E Special Instructions: “ground electrically”, “hot work permit”, “release pressure”, “get port permission”, “entry permit”, “two-
R 3 3 3 3 3 3 7 7 R R
2A/E man job”, “isolate machinery”, “mark-off job item”, Mooring operations etc.)
5 5 5 5 5 5 5 7 7
3A/E “Job Over” column involves checks on completion for : fire safety, water-tightness, securing of loose items, proper line-up of
2 2 6 6 6 6 6 7 7 pipelines, settings of starter panel, resetting of isolated fire sensors, cancellation of hot-work & entry permits, checks about safe return of
E/E all persons, return of equipment, etc.
2 2 4 4 4 4 4 7 7 Tools : CH/Chipping Hammer, SM/Scaling Machine, JC/Jet Chisel, SG/Sanding Grinder, WG/Wire Grinder, ST/Stage, BC/Boatswain's
E.Cdt
R 3 3 3 3 3 3 3 7 7 Chaire, TW/Torque Wrenche, CB/Chain Block, AT/Anti-explosion Tool, IW/Impact wrench,
Ftr JHA : For routine jobs, explain hazards as per JHA and if No "JHA" is available, either JHA should be made or additional clear safety
4 4 4 4 4 4 4 7 7
Olr-1 instructions should be given by dept head. RA: For all non routine jobs RA is required (either review or new if sample not avlbl).
3 3 3 3 3 3 3 7 7
Olr-2
5 5 5 5 5 5 5 7 7 Note :
Olr-3 1) "R" is for rounds - routine/ums as applicable.
R 1 1 6 6 6 6 6 7 7
Wiper 2) Highlighted period is on duty personnel (e.g. duty engineer/oiler / round taking person etc.)
3) Job over checks to be done by PIC/responsible engineer and confirm to 1A/E
Bomb Threat Drill 1630 onwards N N As per Drill Scenario C/O All As per Muster list
If Y: Please refer / discuss available JHA
7 (also make changes if required for future use in case
some improvements required)
10
11
12
13
14
15
16
17
18
19
use in case
y measures
a dangerous
use in case