CONCRETE RATE ANALYSIS

RATIO
GRADE OF CONCRETE (N/mm²) Fill the necessary data in the ye
CEMENT FINE AGG COARSE AGG
M5 1 5 10 Choose
the proper
M7.5 1 4 8 ratio and CEMENT
M10 1 3 6 put in the 1
M15 1 2 4 box
M20 1 1.5 3 Volume of Wet Concrete Re
M25 1 1 2 4

CEMENT FINE AGGREGATE

Toatal CEMENT Required (m³) 1.54 Toatal FA Required (m³)


Volume of one bag (m³) 0.0347 Volume of one truck sand (m³)
Cement Bags Required 44.3804035 Sand truck required
1 Bag Cement Rate (rupee) 300 Rate of one truck sand (rupee)
Total Cost for Cement 13314.121 Total Cost for FA

STEEL TOTAL COST ON MATERIALS


Rate of steel per KG (rupee) 1000
Total Cost for Steel 78500

MAN POWER
One person No. of days Rate/day Total Rate
Head Mason 1.48 200 296
Labours (Unskilled) 14 100 1400
Water Carrier 5.56 50 278
Bar Bender 0.785 100 78.5
Mixer Operator 0.2856 20 5.712
Vibrator Operator 0.2856 30 8.568

TOTAL COST ON MAN POWER 2066.78


RATE ANALYSIS
FOR REINFORCED CONCRETE
Fill the necessary data in the yellow boxes
MEMBER (%) of Conc. Volume
SLAB 1
FINE AGG COARSE AGG COLUMN 2.5
1 2 BEAM 2
RCC Roads 0.6
Volume of Wet Concrete Req. (m³) Value of (%) 1
4 STEEL Required (KG) 78.5

REGATE COARSE AGGREGATE

1.54 Toatal CA Required (m³) 3.08


6 Volume of one truck CA (m³) 6
0.256666667 CA truck required 0.51333333
2400 Rate of one truck CA (rupee) 8800
616 Total Cost for CA 4517.33333

N MATERIALS 18447.454371

TOTAL COST OF MATERIAL AND MAN


POWER COMBINED 20514.2343707973

EQUIPMENTS & SUNDRIES 1538.5675778098

CONTRACTOR'S PROFIT
10 2205.28019486071
(%)

TOTAL COST FOR CASTING 24258.0821434678