O S o e S y o e D y y
O S o e S y o e D y y
GJ 20 ~ 5
o all of the above lAns. : b]
GJ 48 [ill 24
Q.66 The load factor for the 0-6 hour period Q.73 Diversity factor is
alone is ~ 1.34 I}] 1.55
~ 0.876 I}] 1 ~ 1.67 [ill 1.82
GJ 0.999 @] 0.438 [Ans.: b]
Q.74 Capacity factor is
Q.67 The load factor for the period 6-24 hour ~ 0.5 I}] 0.4
is
GJ 0.66 @] 0.33
~ 0.5 I}] 1
GJ 0.438 @] 0.876 lAns.: al
Q.75 From the load curves shown in the
following Fig. 2, which curve has the
Q.68 The number of units generated in 24 least load factor ?
hours are
~ 7200 I}] 3600 50MWh
GJ 1800 @] 2100 lAns. : dl
J--A-
Hours --
Curve X
[U o Hr [ill 6 Hr [Ans. :dl Q.91 The power plant supplies a peak load of
l...
8 24
Q.86 The load factor of the plant in the above
case is
~ 0.44 ~ 0.56
50 MW, 40 MW and 70 MW to three
localities. The annual load factor is 0.5
while the diversity factor is 1.6. The
average load and maximum demand on
[U 0.31 [ill 0.29 [Ans.:bl the station is respectively_ _ _
lOMW !}] 5 MW
20MW @] 15 MW
[Ans.: b]
Q.100 What is the maximum energy that could
be produced in the above example if the
plant is operated as per schedule?
~ 360 MWh !}] 500 MWh
o 600 MWh @] 860 MWh
[Ans.: a]