Resume Syed Fahim Sarwar Gilani PDF

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 9

Syed Fahim Sarwar Gilani

Pakistan

sfahimgilani@gmail.com +923335111068

linkedin.com/in/syed-fahim-sarwar-gilani-77216592

Summary
I am a highly professional individual with 26 years’ experience. I am very co-operative, friendly, hardworking, and
extremely competent. I always have accepted my responsibilities with eagerness and had completed them in a
timely and professional manner. Ability to effectively prioritize and execute tasks in a high-pressure environment.

Experience
Architect/Urban Designer & Educator
My objective to pursue a career within the field of Architecture and Urban Design.
Sep 1994 - Present (26 years 4 months +)
I designed and supervise diffrent types of projects as Practicing Architect / Urban Designer, other
than those Professional services I provided to different Employers on Project / contract basis. Detail of
Employers with Projects name written below
 
1. Residence of Mrs. Saeed at F-11/4 at Islamabad
 
2. Residence of Mr. Farooq at G-11/3 at Islamabad
 
3. Residence of Mr. Khadam Ch. at F-11/4 atIslamabad
 
4. Residence of Mr. Baqir Hussain at Barian at Murree
 
5. Residence of Mr. Tahir Malik at ChakShazad at Islamabad.
 
6. Residence of Mr. Abdul Hameed at British Homes.
 
7. Residence of Mr.Riaz at Korang Town at Islamabad.
 
8. Residence of Mr. Younas at G-11/4 Islamabad
 
9. Residence of Mr. Asif Ali Shah at E-11/4 Islamabad.
 
10. Residence of Mrs. Asif at E-11/4 Islamabad
 
11. Residence of Mr. Sajjad Ahmed at G-13/2 at Islamabad
 
12. Residence of Mr. Afzaal at Phase-1 DHA.
 
13. Residence of Mr. Hassan at Bahria Town at Rawalpindi.
 
14. Residence of Mr. Mahmood Hussain at G-10 Islamabad.
 

Syed Fahim Sarwar Gilani - page 1


15. Residence of Mr. Asif Hussain at I-8 Islamabad
 
16. Residence of Mr. Siraj at Soan Garden at Islamabad
 
17. Land-use Planning Chakshazad at Rawalpindi.
 
18. Land-use Planning Morgah City at Rawalpindi.
 
19. Interior/refurbishment of Europe Union Commission at Islamabad.
 
20. Interior designing of the office of Mr. Rafique at Rawalpindi.
 
21. Interior of Matracon office at Morgah at Islamabad.
 
22. Interior design of Mr. Farooq Dar at DHA-2 Islamabad.
 
23. Interior designing of PHA Flat at Islamabad.
 
24. Commercial Building of Dr. Qasim at Wah.
 
25. Residence of Mr. Usman Sabir at DHA-II Islamabad.
 
26. Residence of Mr. Asad Surani at F-15/1 Islamabad.
 
27. Residence of Mr. Mahmood Arshad at Housing Scheme Kotli.
 
28. Residence of Mr. Rashid Rafiq at ARL Rawalpindi.
 
29. Apartment Building at Muzaffarabad

Visiting Faculty as Assistant Professor


University of Engineering and Technology Peshawar, Pakistan
Mar 2019 - Feb 2020 (1 year)
Course Taught:
* ARCH-311 : Architectural Design Studio
* ARCH-506 : Thesis Design -I

Visiting Faculty as Associate Professor


National College of Arts
Aug 2017 - Feb 2019 (1 year 7 months)
Course Taught:
* ARCH-301: Architectural Design Studio
* ARCH-301: Architectural Design Studio
* ARCH-201: Architectural Design Studio

Visiting Faculty as Associate Professor


COMSATS Institute of Information and Technology
Syed Fahim Sarwar Gilani - page 2
Sep 2016 - Aug 2017 (1 year)
Courses Taught
*ARCH-511 Architectural Design VII (urban design Studio)
*ARCH-511 Architectural Design VII (urban design Studio)

Visiting Faculty
National University of Sciences and Technology (NUST)
Sep 2016 - Feb 2017 (6 months)
Courses Taught
*305 Architecture & Town Planning in NICE

Regular Visiting Faculty


National University of Sciences and Technology (NUST)
Sep 2011 - Mar 2014 (2 years 7 months)
Courses Taught:
*Arch 301 Architectural Design III-B.Arch-I
*Arch 312 Environmental Design III-B.Arch-III
*Arch 433 Elective in Material & Construction-B.Arch-I
*Arch 321 Environmental System II-B.Arch-II

Visiting Faculty
National University of Sciences and Technology (NUST)
Sep 2011 - May 2012 (9 months)
Course Taught
*Architecture and Town Planning

Principal Architect
Civil Works Organization
Aug 2008 - Jul 2011 (3 years)
Responsibilities: Designing, Design Development, Project Supervision.
 
Projects:
 
*Layout Planning of Chakra Rawalpindi.
*Revised Layout Planning of KRL Housing Society.
*Revised Layout Planning of KotJabbi.
*Land-use Planning of KICSIT Complex.
*Interior of conference hall at Chaklala Rawalpindi
*Interior of Mess Building.
*Gym at Chaklala Rawalpindi.
*Interior designing of chairman office building at Rawalpindi.
*KRL Hospital Building.
*Office buildings.
*Kinvast building H-11 Islamabad.

Syed Fahim Sarwar Gilani - page 3


Director Architecture
Earthquake Emergency Assistance Project
Aug 2007 - Aug 2008 (1 year 1 month)
To supervise the overall project projects related to earthquake emergency Assistance Projects funded
by Asian Development Bank.
 
Projects:
*52 Bed Chest Diseases Hospital at Hill.
*100 Bed Hospitals at Authmuqam.
*100 Bed Hospitals at Sanduti
*BHU’S, RHU’S & School.
*Chief Secretariat office building Muzaffrabad
*Thotha Satellite Town MZD.
*Langerpura Satellite Town MZD.
*Prime Minister House MZD.
*Supreme Court Building AJK.

Architect
CIVIL WORKS ORGANIZATION HQ
Sep 2004 - Jul 2007 (2 years 11 months)
Responsibilities: Designing, Design Development, Project Supervision.
 
Projects:
*Renovation / conservation of office Buildings at Rawalpindi.
*New office block at chaklala Rawalpindi.
*Residential Flats at Chaklala.
*Guest House at Murree.
*S.M Barrack.

Architect
PGI DESIGN GROUP
May 2003 - Jul 2004 (1 year 3 months)
Responsibilities: Designing, Design Development, Studio Supervision.
 
Projects:
*Kato Center Muzaffrabad.
*Entrance Gate & Master Plan of G-15 Markaz.
*Residential Apartments at G-15 Islamabad.
*Layout Planning of Sector F-15 and F-16 Islamabad

Senior Urban Designer and Project Manager.


PEPAC (PVT) LTD
Mar 2001 - Jan 2002 (11 months)
Responsibilities: Project Management
 
Projects:

Syed Fahim Sarwar Gilani - page 4


 
*Revitalization of Old Anarkali Bazar Lahore.
*Extension in National Museum of Pakistan.
*Revitalization of Sialkot and Gujranwala Railway Stations.

Architectural Engineer
AL – ARAB CONSTRUCTION ESTABLISHMENT
May 2001 - Sep 2001 (5 months)
Responsibilities: In charge of the Architectural work on site.
 
Projects:
*King Abdul Aziz University Madina, Saudi Arabia.

Architect
SUHAIL & PASHA ASSOCIATES
Dec 1996 - Jul 1997 (8 months)
Responsibilities: Design Development
 
Projects:
 
*SLIC Building Islamabad.
*Housing Projects.

Architect
Engineering Consultants International (Pvt) Ltd.
Aug 1995 - Nov 1996 (1 year 4 months)
Responsibilities: Designing, Detailing
 
Projects:
 
*Project Management Organisation Housing Complex Taxila.
 
*Jinnah Naval Base, Omara in association with
Sir William Halcrow and Partners Limited, United Kingdom.
 
* Designed Lorelei Medical College & 1000 bed Teaching Hospital Baluchistan.
(Provided services as free lance Senior Architect from Sep, 2015 to Feb, 2016, six month)

Junior Architect
BSF Design ASSOCIATES
Oct 1994 - Jun 1995 (9 months)
Responsibilities: Provide Coordination between office and Site.
 
Projects:
*Mrs. Malik House F-7 Islamabad.
*House at F-11/1 Islamabad.

Syed Fahim Sarwar Gilani - page 5


*School at E-9.

Education
Oxford Brookes University
Master of Arts (M.A.), Urban Design
1997 - 1999
Welfare for the student Community

NED University of Engineering and Technology


(B.Arch.), Architecture
1988 - 1993
Mostly Provide interaction between Students and faculty.

Post Degree College for boys Muzaffarabad Azad Jammu Kashmir


FS.c, Pre-Engineering
1983 - 1985

Saint Paul's Cambridge School Rawalpindi


Matric, Physical Sciences
1973 - 1983
Mostly Provide Services as HEAD BOY of School

Licenses & Certifications


Pakistan Council of Architects and Town Planner - Pakistan Council of Architects
and Town Planners
A-1724

Associate Member - Institute of Architects, Pakistan - IAP


A-1067-07

Practice as an ARCHITECT - Capital Development Authority (CDA)


No: CDA/D.Arch-2(72)/449/A/1996

Environmental Assessment & Management as a tool for sustainable urban


desvelopment - Institute of Architects, Pakistan - IAP
Issued May 2018 - Expires May 2018
Professional Skill Development Series 2017-18

Convener Exhibition - Institute of Architects, Pakistan - IAP


Issued Apr 2018 - Expires Apr 2018
Series 2017-18

Syed Fahim Sarwar Gilani - page 6


ARCASIA + ADPC Training of Trainers on Disaster risk management - Asian
Disaster Preparedness Center (ADPC)
Issued Oct 2018 - Expires Nov 2018
ADPC 35,318

BIM ARCHICAD - Institute of Architects, Pakistan - IAP


Issued Nov 2018 - Expires Nov 2018
Professional Skill Development Series 2018-19

Alumni Mentor - Oxford Brookes University


A304024

Alumni Mentor - Dawood University of Engineering and Technology


049/93/16

A Comprehensive Work Shop on "Building Regulations by-laws for Galiyat


Region as Expert Professional - University of Engineering and Technology
Peshawar, Pakistan
12345

Member CDA Design Vetting Committee - Pakistan council of Architects and Town
Planners
PCATP/CDA/DVC/11-19-2020

Making Cities Resilient - United Nations Office for Disaster Risk Reduction
Issued Sep 2020 - Expires Oct 2020
UNDRR GETI

UN 2030 Sustainable Development Goals, Planning for Rapid Urbanization,


Planned City Extensions, Resilient Infrastructure, Climate Resposive Design,
Heritage Led Regeneration, Sustainable Outcomes - Commonwealth Association
of Planners
Issued Jul 2020 - Expires Aug 2020
CAA02132020

Continuous Professional Development - Pakistan Engineering Council (PEC)


Issued Mar 2013 - Expires Mar 2013
2013 PEC

AIT Case Method Orientation Workshop - National University of Sciences and


Technology (NUST)
Issued Nov 2012 - Expires Nov 2012
Syed Fahim Sarwar Gilani - page 7
PDC & AIT

Scientific Approach to Teaching and Learning - National University of Sciences


and Technology (NUST)
Issued Jan 2014 - Expires Feb 2014
PDC-SATL-0128-0114

Life Skills & Change Management - Capital Development Authority (CDA)


Issued May 2017 - Expires May 2017
42ndCDA

Design Innovation/Redifining Project Management - Institute of Architects,


Pakistan - IAP
Issued Mar 2018 - Expires Mar 2018
IAP201718

Skills
Architectural Design   •   AutoCAD   •   Architecture   •   Interior Design   •   Urban Design   •   Photoshop   •  
Construction   •   Sustainable Design   •   Project Planning   •   Architectural Drawings

Honors & Awards


Speaker Arch Vision "2000" - Institute of Architect Pakistan
Oct 2000
Read Paper in Seminar.

Principal Architect - Civil Works Organization HQ, Rawapindi


Jul 2011
(Design Section) HQ (CWO) in Gratitude for the Hard-work & Dedicated Personal and Professional
Services to the organization.

Hospital Design Compitition - PCATP & PMO


May 2000
DESIGN COMPETITION (Runner up) Naveed Aslam Associates Islamabad & I myself

Award of Apriciation - Institute of Architect Rawalpindi Islamabad Chapter


Mar 2017
Member Executive Committee

Certificate awarded as Paper Presenter on Design Pedagogy (analyzing current


trends and shaping the future) - Conference on Architecture Education hosted by
faculty of Architecture & Design, COMSATS University Islamabad
Oct 2018

Syed Fahim Sarwar Gilani - page 8


After Beaux and Bauhaus school of thought this was established that how to understand Architecture.
Industrial revolution, invention of steam engine and use of steel share strong effects on Planning,
Engineering and Architecture. Urban growth set new trend setter in living standards. High rise buildings,
suburbs, city to city connectivity through fast trains and motor way, airplanes and by ships. This was
first phase of fast urban growth. City Planning and building architecture day to day by complex in
nature due to growth rate in population of world. Especially after 90’s cities and urban growth sets
new challenges for earth like global warming. The evolution of buildings changed dramatically with the
advent of air conditioning, which significantly increased the electricity demands of buildings.

Idea's Design competition 2019 for SIR SYED MEMORIAL BUILDING - INSTITUE
OF ARCHITECTS PAKISTAN
Dec 2019
Design Competition

Syed Fahim Sarwar Gilani - page 9

You might also like