Professional Documents
Culture Documents
Viaduct Pier Loading Details
Viaduct Pier Loading Details
Viaduct Pier Loading Details
CONTENT
1 Introduction 01 - 01
Introduction
Sitaburdi station is situated at Munje Chowk, which is interchange station
For North-South Corridor & East-west Corridor of Nagpur Metro.
Sitaburdi Station is consist of the three building:
1. East-west Corridor Building
2. Central part
3. North-South Corridor Building
Design
This design note Cover the Station Viaduct Common pier loading form Transition
span of North-South Track level, North-South corridor building.
Page 1 of 8
Track level Loading Calculation
(Station-Viaduct Common Pier)
Page 2 of 8
Load Details
Description Detail/Load Unit
Thickness of Slab = 200 mm
Thickness of Finishing = 150 mm
Girder Size =
Width, B = 0.4 m
Depth, D = 1.2 m
Density of Concrete = 2.5 MTon/m3
Density for Finishing = 2.4 MTon/m3
Parapet
Height, H = 0.7 m
Width, B = 0.2 m
Diaphragm
Height, H = 0.75 m
Width, B = 0.4 m
Length, L = 8 m
Span of the Girder = 17 m
LOADING DETAILS
A. Vertical Forces
1) Dead Load
a) Slab 200thick = 0.5 MTon/m2
MTon/m/
b) Track SIDL = 2.5 Track
3) Live Load
Page 3 of 8
Train Live Load ( Below Four Rails, Four Girdres has been Provided, Load has been calculated per
Girder)
(as per Model DBR)
S.No. Span(m) 17 Load
A Axle 15 T 84.75 Mton
B Axle 17 T 98.4 Mton
C For Axle 16T 91.575 Mton
Load Per Meter/Track 5.4 Mton/m
Load Per Meter/Rail 2.7 Mton/m
Co-efficient of dynamic
Augment (longitudnal)
For Double Track 0.30
Effective Live load of Train
per Rail 3.50 Mton/m
4. Seismic Load
B. Longitudinal Forces
a. Braking Load
Estimation of Braking & Tractive Forces
As Design Basis Report
Braking Force = 18 %
Braking Force = 0.63 Mton/m
b. Tractive Load
As Design Basis Report
Tractive Force = 20 %
Tractive Force = 0.70 Mton/m
c. LWR Force
As per Design Basis Report
LWR Intensity = 1.32 t/m
No of Girders = 4 Nos
LWR FORCE /RAIL = 0.33 t/m
d. Wind load
d. Wind Fores = 0.60 t/m
4. Seismic Load
1. Longitudinal Seismic Coefficients = 0.100
Page 4 of 8
A Seismic Forces Calculation
1
Page 5 of 8
COMMON PIER LOAD CALCULATION
INPUT DATA
Page 6 of 8
S.No. Description Detail / Load Unit REMARKS
2 SIDL :
Finishes Load = 6.138 Mton
Track SIDL = 9.6875 Mton
Total Load = 17.4 Mton
4 Seismic Load
Model mass to be considered for the Combination of "DL + SIDL +0.5L "
Joint Weight at support = 56.4 Mton
Vertical Seismic load = 3.8 Mton
Horizontal Reactions
4. Seismic Load
Longitudinal Seismic
a Force = 5.6 Mton
2 SIDL :
Finishes Load = 5.859 Mton
Track SIDL = 9.688 Mton
Total Load = 17.1 Mton
4 Seismic Load
Model mass to be considered for the Combination of "DL + SIDL +0.5L "
Joint Weight at support = 54.5 Mton
Vertical Seismic load = 3.6 Mton
Horizontal Reactions
4. Seismic Load
Longitudinal Seismic
a Force = 5.4 Mton
Page 8 of 8