Professional Documents
Culture Documents
Epc4 - Tinhert Project First Gas Phase: (JOB No.: 0-1802)
Epc4 - Tinhert Project First Gas Phase: (JOB No.: 0-1802)
name : PROCESS SYSTEMS
Company’s Name : SONATRACH / EPM / DP ALRAR
Purchaser : COSIDER CANALISATION
Engineering Sub-Contractor : JGC ALGERIA S.P.A
Plant Location : TINRHERT, ALRAR
Project name : EPC4 TINHERT - FIRST GAS PHASE
Requisition No. : R-2177-003
Equipment/Material name : MULTIPHASE FLOW METER
Item number : 18-FIT-00001
Document title : VENDOR DOCUMENTS LIST
Approval Required Date:
EPC4 - TINHERT PROJECT FIRST GAS PHASE (JOB No.: 0-1802)
ISSUE PURPOSE: FA, FI, FC, AB
RESULT CODE : A, B, R, N, F ( )
NEXT STATUS : FA, FI, FC, AB ( )
RESUBMISSION DATE : ( )
RESPONSIBLE DEPT./PERSON : ( )
Review Date: ( )
A: Approved without Comment; B: Approved with Minor Comment
R: Resubmit incorporating comment; N: Not Approved
F: Not Subject to Review
Approval or review hereunder shall not be construed to relieve Vendor / Subcontractor of his responsibilities and liability under the
Contract.
TYPE CODE
TYPE CODE
STATUS
- - -
MULTIPHASE FLOW METER 18-FIT-00001 40471-PS-PI-100 22/12/2020 GZL FA 1W 22/12/2020
- - - -
MULTIPHASE FLOW METER 18-FIT-00001 40471-AQ-PR-100 RBT FA 4W
- - - -
MULTIPHASE FLOW METER 18-FIT-00001 40471-TU-DD-100 RBT FA 4W
- - -
MULTIPHASE FLOW METER 18-FIT-00001 40471-EQ-SK-100 RBT FA 20W
STATUS
22/12/2020 1
22/12/2020 1
22/12/2020 1
22/12/2020 1
Transmitta
l note
N° B40471
EXPECTED Status
MAILING DATE RETURN DATE
RETURN DATE Code A/B/R/N/F