Foundation of Tower TAT 60 v1

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

foundation TAT60 type 2:

b b
A

A=B= 5.80 m (f 1/2 @ 0.25m)


b= 4.50 m

a a

hp hr

hz

a= 0.50 m (12 f 5/8")


B= 5.80 m
hp = 1.55 m
hz = 0.45 m
hr = 1.25 m

Montante: L5x5x3/8"
N= 0.30 m
B= 0.30 m
t= 1 3/8"
pernos de anclaje: 4 f 1"
Peso de torre (MSTOWER) 5433.76 kg
Peso total de torre (estimado) 8845.00 kg

You might also like