SEPTIC TANK

A
600 x 450mm pre-cast conc. covers
complete with frames Half round channel C
7 100mm dia pvc inlet / outlet pipes
429
30800 B Invert level
1500

TO SOAK PIT $
PERCOLATION
D2
TRENCHES
Selected stone
BATH/WC 100mm thick R.C cover slab. C
ff. cerami
c tiles A
3692 D2 PANTRY BEDROOM
BATH/WC c tiles tiles D3
ff. cerami
c tiles
ff. cerami
KITCHEN ff. ceramic
D3 tiles
ff. ceramic
D2
PANTRY BEDROOM
BATH/WC c tiles
KITCHEN tiles D3
c tiles
ff. cerami ff. ceramic
ff. cerami tiles
D3 ff. ceramic D2
14900

BEDROOM D2
GENERAL NOTES
tiles
ff. ceramic D3 D2
100mm th. reinforced concrete
D2
cover slab (mix. 1:2:4) (1) Contractor to verify dimensions on site
D2
D2 before commencement of works and
D2 KITCHEN 600 x 450 mm pre-cast conc. 600 x 450 mm pre-cast conc. 600 x 450 mm pre-cast conc.
tiles cover cover cover report any discrepancies to consulting
M ff. ceramic
M LIVING ROO Architect.
D2 D3 LIVING ROO ff. ceramic
tiles GROUND LEVEL
tiles (2) Architectural drawings to be read with
BEDROOM ff. ceramic
BATH/WC
MAS TER
ff. ceramic
tiles 100mm dia half round channel Benching relevant structural, mechanical and
M
LIVING ROO
c tiles D1
ff. cerami
D3
IN electrical drawings.
BEDROOM
tiles
ff. ceramic D1 WORKING LEVEL
MAS TER 100mm dia. inlet / (3) All retaining walls to be damp proofed
BATH/WC TERRACE
D
ff. ceramic
tiles
Concrete to foundation (mix 1:3:6) outlet
c tiles 125mm thick concrete base gl. support bracket built into
ff. cerami
ff. ceramic
tiles B
civil engineer's specification and
0

TERRACE (mix. 1:3:6). Depth to invert D 230mm thick block wall to be at thickness specified
D1 tiles level not more than 1500mm detailing.
ff. ceramic
1520

25mm th. cement screed finished


smooth with steel float. (4) Drainage pipes under drive ways to have
TERRACE Concrete to foundation (mix 1:3:6) to be 150mm concrete surrounding.
ff. ceramic
tiles at thickness specified
52

KEY SKIRTING
28

FLOOR
Selected filling well compacted and FINISHING
consolidated.
4551

600 x 450 mm pre-cast conc.


Selected filling in six layers well cover
WALLS CEILING
4510

0
44
rammed and consolidated into place.
10 FLOOR
4000 Second hand G.C.I sheet or
roofing felt
Inlet pipe (A) 30mm Cement/Sand Screed
(B) In situ Concrete finish
100mm dia. half round Benching rendered 12mm (C) 9mm thick Ceramic Tiles
100mm dia agricultural thick, finished smooth with Selected stone
channel.
26800
pipes laid with open joints, steel float profile. (D) 25mm thick Granite
minimum fall 1:10. SELECTED STONE 150 DOWN TO 20mm 125 th. conc. foundation
(mix 1:3:6). SKIRTING
(A) 150mm Cement/Sand Plaster
(B) 25mm, 150mm high Hardwood
(C) 9mm, 150mm high Ceramic Tiles
(D) 150mm high Granite
WORKING TABLE 1 WALLS
(A) 12mm thick painted Cement/Sand
1 2 3 4 5 6 7 8 9 10 11 12 13 14 Plaster
NO. OF NO. OF NOMINAL CAPACITYLENGTH WIDTH INLET OUTLET CAPACITY NORMINAL LENGTH DEPTH OF (B) Wallpaper
MEAN
USERS USERS CAPACITY CU.M A B C D LITRES CAP. LITREOF DRAIN SOAKPIT
(C) 6mm Ceramic Tiles
A 6 10 1.416 1.486 2.133 0.762 1.143 0.685 0.914 1503.576 1500.617 12.192 3.048 (D) 12mm thick Granite
(E) Glass
B 10 15 2.549 2.676 2.743 0.914 1.372 0.762 1.066 2661.093 2682.118 18.288 3.048
C 12 20 2.832 3.058 2.743 0.914 1.448 0.990 1.219 3090.119 3091.255 24.384 4.572 CEILING
(A) Painted Cement/Sand Plaster
D 15 30 4.248 4.205 3.363 0.914 1.448 1.219 1.372 4252.748 4273.205 36.576 4.572 (B) Powder coated aluminium suspended
E 20 40 5.663 5.522 3.962 0.914 1.829 1.219 1.524 4584.714 5591.529 48.768 6.096 ceiling (Hunter doorglass)
(C) Armstrong ceiling
F 27 50 7.079 7.221 5.182 0.914 1.829 1.372 1.524 7303.09 7273.541 60.950 6.096
G 31 60 8.495 8.410 5.182 0.914 1.980 1.372 1.676 8293.09 8500.95 73.152 7.620 REVISIONS
SITE LAYOUT PLAN NO. DATE. DESCRIPTION
ISSUES
Kyanja Bar NO. DATE. ISSUED TO NO. DATE.
ARCHITECT
Kyanja Mosque
PROJECT
ELEVATION PROPOSED RENTAL UNITS ON PLOT NO.
2593 BLOCK NO 195 KYANJA KAWEMPE
OPEN OPEN DIVISION KCCA
SLIDING GATE
CLIENT
M/S HELEN FRANCES CALNAN
Prosper apartments P.O. BOX 59
ENTEBBE
Mubiru traders shops DRAWING TITLE
SEPTIC TANK, BOUNDARY WALL & SITE
LAYOUT PLAN.
Vintage Car Wash
PLAN
plot boundary
JOB NO. 10/06 DWG REF
lamp

300
Bellwether Apartments SCALE 1:100
p. c. coping SHEET NO.
400x300 r. c. DATE Nov 2019 2 of 2.
15x15 iron bars

900
columns DRAWN BY
scale : 1 : 50
Kyap Gardens Kyanja tyrolean rendering
3000 CHECKED BY

2400
p. c. coping
boundary wall
facing bricks
150 concrete

1200
smooth
blocks coloured piers at 3000 c/c polythene sheeting as expansion
stonework joint at 6000 c/c
dpc stormwater drain to existing
200 concrete
3000 BNDRY. WALL PLAN
blocks scale : 1 : 50
dpc
BNDRY. WALL ELEV.
scale : 1 : 50
200x500 concrete fdtn.
( mix : 1 : 3 : 6 )
SITE LOCATION PLAN
SECTION