Construction Check Sheet I-008A: Instruments
Construction Check Sheet I-008A: Instruments
INSTRUMENTS
Instrument Impulse Line
Pressure Test
PROJECT
PROJECT No.
DESCRIPTION
SYSTEM
SYSTEM No.
DESCRIPTION
Instrument Impulse Lines connected to the following Instruments are correctly installed as per Project
HOOK-UP and PEFS Drawings and have been Pressure Tested at 1.5 times Operating Pressure
Seal Line Seal Line
Instrument Test Instrument Test
PEFS No. Pot Drained PEFS No. Pot Drained
Tag No. Pressure Tag No. Pressure
Fitted & Clean Fitted & Clean
REMARKS / OBSERVATIONS: