Professional Documents
Culture Documents
No Objection: Warning
No Objection: Warning
No Objection: Warning
2783900
1.0
rat
ion
8
10
1
1.0
0 MM 10
In 0 MM
Op
era Pr
357-0169 tio op
n os
ed
357-0400
357-0401
10
0 MM
Pr
10 op
os
357-0406
B - ed
357-0380
WM
357-0386
8052053 1.0
1
1
0.9
15 357-0130 357-0381
0 MM
In 10 357-0354
Op 0 MM
era In
tio Op
n era
tio
n
1.0 357-0131 357-0382
2
15
2783800
2783800
0 MM
d
Z
In
Op
era
19 tio
n
B -
Z
357-0383 357-0132
tion
era
NOTE : 357-0752
Op
In
osed )
DEWA MUST BE NOTIFIED ( TEL : 04 3220632 , 04 r3220631
M P op
/
PRIOR TO START EXCAVATION WORKS AND 100 M
INSTALLATION /
0
3.8
4B
10
2 357-0133
MOBILIZATION OF MACHINARIES / EQUIPMENTS FOR NECESSARY 357-0384
CHECKING OF SERVICES WITHIN THE PLOT.
THE OWNER WILL BE RESPONSIBLE FOR THE CHECKING
9
0.8
Bulk
THIS NOC PERMITS TO WORK WITHIN THE PLOT Combination B Butterfly ! ! Abandon
CONDUIT SYSTEM
CHECKED BY : WALEED
Double-Air APPROVED BY : DY.MANAGER (NOC) / SMEW
LIMIT ONLY Filling
d
DGate/dWash-Out Culvert
Standard
METER d
Pressure-Relief CASINGDuct
WARNING FlowMeter
PressureMeter
Single-Air
FITTING
Protective Slab
Protective Tunnel G/U WATER TANK : 500 GAL
IT IS LIKELY THAT EXISTING LDPE LINES ARE PASSING
ã WaterQualityMeter Bend « WATER STRUCTURES
THROUGH YOUR PROPOSED WORKING AREA. IT IS THE
RESPONSIBILITY OF THE CONTRACTOR TO LOCATE IT
PUMPS Cross 6 d
PumpHouse O.H WATER TANK : 500 GAL
BY TRIAL EXCAVATION PRIOR TO THE COMMENCEMENT Pumps
WATER WELL
+
Analyzer
End Cap
Reservoir
TOTAL QUANTITY : 1000 GAL
OF THE WORK. DEWA WILL NOT BE RESPONSIBLE FOR
ANY BREAKAGE TO THESE LINES. THE CHARGES WILL Waterwell
SAMPLE POINTS
¾
LDPE Tee
Reducer
WaterTank
PumpStation
BE MADE AS PER ACT (2)/1994 OF GOVERNMENT OF
DUBAI. Sample Points Tee Z TreatmentPlant
A4 DATE : 20-Jul-2015 SHEET NO : 1 OF 1