Day: Date: Department: Project
Day: Date: Department: Project
Day : Thu
Date : 07.01.2021
Department : Electrical
Tasks Done by Today
1
Cable Ladder Support Fabrication and Installation at Level 58.975
2
Fixing nd releveling the Cable ladder damaged by truck at level 36.135 under conveyor 502
3
Painting The Conduit Mounting Accessories
4
Engineering : Follow Up the Lighting Panel With Supllier
5
1
Engineering: Finalizing the Dedusting and Marshalling Submittal with VoltAutomation
2
Engineering : Follow Up the Lighting Panel With Supllier
3
Assembly the Lighting Junction Box for T09 Stair case
4
Issues/ Requirements
Staff
10
11
12