Download as pdf or txt
Download as pdf or txt
You are on page 1of 48

The ITIL®

First Aid Kit


Essential information for professionals and organizations using ITSM®
ITIL® is a registered trade mark of AXELOS Limited
The ITIL®
First Aid Kit
The ITIL® First Aid Kit is an essential toolkit for the effective utilization of the IT Infrastructure Library (ITIL®) in any organization. However, it
does not provide any one-size-fits-all solutions or formulae that ensure a successful IT Service Management (ITSM) implementation. This kit
is meant as guidance to provide you with areas of attention and possible strategies to include in your program approach. Each organization
is different, and your program needs to be unique to your organizational needs and business drivers.
The kit provides essential ITIL program approaches to support you when you need them the most. In every ITSM program emergency, think
of this kit before looking elsewhere.

Copyright: ITIL® is a registered trade mark of AXELOS Limited. | The Swirl logo™ is a trade mark of AXELOS Limited. | The ITIL Accredited Training
Organization logo is a trade mark of AXELOS Limited. | IT Infrastructure Library® is a registered trade mark of AXELOS Limited | No part of this
document may be reproduced in any form without the written permission of both ITpreneurs and AXELOS Limited. Permission can be requested at
www.ITpreneurs.com and licensing@AXELOS.com. | Material in this document has been sourced from ITIL® Service Lifecycle Suite 2nd Edition, 2011.
1 The Need to Deliver Value

• Information, previously a sup- • Capabilities and resources in the • IT organizations require a keen • A well-managed IT organization can
porting element, has become the management of IT and services sense of the nature and dynamics act like a business within a business
basis for value itself. In addition, are no longer perceived as simply of Services as a means of providing and deliver value that meets or
information-based Services are operational concern for detail. They value to customers. exceeds other commercial alterna-
changing and evolving at a rapid are the basis for creating value, for • It is important for IT organiza- tives. For this reason, concepts such
rate. competition, and for distinctive tions to review their positions and as Utility, Warranty, market spaces,
performance. to clearly understand how they and portfolios are introduced in the
provide differentiated market value Service Strategy processes within
to their customers. the Service Lifecycle.

Source: Based on AXELOS ITIL® Service Lifecycle Suite 2nd Edition, 2011. Reproduced under licence from AXELOS.
1.1 Ensure Value Creation by Asking

What is our business? Service Strategy is


your main body of
Who is our customer? reference to assist with
structuring the flow
What does the customer value? of and answering these
key questions.
Who depends on our Services?

How do they use our Services?

Why are they valuable to them?

Source: Based on AXELOS ITIL® Service Lifecycle Suite 2nd Edition, 2011. Reproduced under licence from AXELOS.
1.2 Multiple Views of IT

VIEW V I S U A L I Z AT I O N VERNACULAR

IT / Component Components of systems and processes “Our billing system is IT-enabled”

“We use it to improve interactions with our customers


through self service terminals at key locations.”

“IT touches every part of our business. Without appropriate


controls that in itself is a risk.”

IT / Organization Internal unit function of the enterprise “Our IT is headed by a CIO of tremendous experience in the
or commercial Service Providers transportation industry.”

“Our heavily centralized IT suits our business model which


more than anything requires stability and control over
business operators.”

“IT does not understand the nature of our business.


Much is lost in translation.”
IT / Service Type of shared service utilized by “I haven’t been able to access the internet since yesterday.
Business Units when do you expect the service to be restored?”

“Our remote access service is very secure but it is also very


difficult to set up and use.”

“We decided not to use our own enterprise applications


for administrative functions. We are better off utilizing IT
services provided to us under a commercial contract.”

IT / Asset Capabilities and resources that provide “It is the core of our business process. We use IT to create
a dependable stream of benefits value for customers. It is part of our core production
process.”

“Our IT investments are like Costs of Goods Sold (COGS).


They are direct costs not overheads.”

“IT is our business.”

Source: Quoted text source is ITIL® Service Lifecycle Suite 2nd Edition, 2011. Copyright © AXELOS Limited 2014. Material is reproduced under license from AXELOS.
2 Management of Change (MOC)

Aspects of managing the cultural/behavioral A formal ITSM program approach is used to It is important to note that the most successful
Change experienced with the implementa- manage these elements of cultural change, ITSM programs are those that focus on attain-
tion of ITIL processes need to be identified and with specific emphasis placed on the develop- ing corporate objectives. Indeed, the sooner
controlled. This Change is mainly the shift from ment of awareness campaigns aimed at all you can drop the project name – ITSM or ITIL
being an IT-centric organization to becoming a target audiences – IT management, IT staff, program – and align this work to support a set
customer-focused organization. Less emphasis and customers – and strong communications of corporate initiatives, the more successful the
is placed on individual IT units performing well planning. implementation will be.
in isolation than on one where each IT unit
needs to understand its part in delivering Ser-
vice to the end user and in being accountable
for its performance in the supply chain.
2.1 The 4 Ps

People Processes Partners Products

Many designs, plans, The implementation of ITSM as a practice is about preparing and planning for the effective
and projects fail because and efficient use of the 4 Ps. This approach is critical when designing your ITSM program, for
of a lack of preparation correctly focusing on clarity of communication, and for ensuring a culture that supports and
and management. rewards process adherence through changed behaviors.
It is especially important to focus on the People aspect of the 4 Ps because this is where your
Change effort will succeed or fail.
2.2 Eight Steps to Transform Your Organization

John P. Kotter of the Harvard Business School introduced this


approach to manage Change within an organization. This approach 5 Empower Others to Act on
the Vision 7 Consolidate Improvements and
Produce More Change
• Remove obstacles to Change. • Use increased credibility to change
has proven successful over the years and can be helpful when
• Change systems or structures systems, structures, and policies
designing the management of Change into your ITSM program.
that seriously undermine that don’t fit the vision.
• Hire, promote, and develop

1 3
the vision.
Establish a Sense of Urgency Create a Vision
• Encourage risk taking and emplo-yees who can implement
• Examine market and • Create a vision to help
nontraditional ideas, activities, the vision.
competitive realities. direct the Change effort. • Reinvigorate the process with new
and actions.
• Identify and discuss crises, • Develop strategies for projects, themes, and Change
potential crises, or major achieving that vision. agents.
opportunities.
6 Plan for and Create Short-Term Wins

8
4
• Plan for visible performance Institutionalize New Approaches
Communicate the Vision
• Articulate the connections

2
improvements.
Form a Powerful Guiding Coalition • Use every vehicle possible to
• Create those improvements. between the new behaviors and
• Assemble a group with enough communicate the new vision
• Recognize and reward organizational success.
power to lead the Change effort . and strategies.
employees involved in • Develop the means to ensure
• Encourage the group to work • Teach new behaviors by citing the
the improvements. leadership development and
as a team. example of the guiding coalition.
succession
Source: Leading Change - John P. Kotter - 1996
2.3 Pitfalls when Attempting to Change the Organization

In his book, “Leading Change,”


Kotter identifies the errors
the efforts they make to convey their
message are typically of the least 4 Looking for villains in
all the wrong places
Long-term program challenges
• Changes in sponsorship/leadership
observed when undertaking convincing variety — speeches and The perception that large organiza- • Changes in team
memos. tions are filled with recalcitrant middle
Change initiatives in practice. • Change in business (mergers,
managers who resist all change is not
Make sure that you plan to acquisitions, and so on)
mitigate these Risks in your
ITSM program.
3 Declaring victory before
the war is over
only unfair, but also untrue.
In professional Service organiza- • Temporary changes in
economic fortunes
When a project is completed or an tions, and in most organizations with
initial goal met, it is tempting to an educated workforce, people at • Poorly articulated project strategy

1 Writing a memo instead


of lighting a fire
congratulate all involved and
proclaim the advent of a new era.
While it is important to celebrate
every level are engaged in Change
processes. Often, it’s the middle level
• Initial excitement based on a de-
sired result without investing in the
At least half of failed Change efforts that brings issues to the attention of
results along the way, kidding necessary, underpinning processes
bungle the first critical step — estab- the senior executives.
yourself or others about the • Wishful thinking on timeframes,
lishing a sense of Urgency.
difficulty and duration of orga- meaning not enough planning for

2 Talking too much and


saying too little
nizational transformation can be
catastrophic. Celebrating incremental 5 Lack of focus on short-term wins
To maintain momentum and the longer term (scenarios/phases)
improvements is a great way to mark sustain funding and support, it is • Wrong emphasis on tools at the
Most leaders under-communicate progress and sustain commitment, important to deliver on short-term wrong time
their Change vision by a factor of 10 but don’t forget how much work is wins and to communicate these wins • Inadequate focus on the human
(or 100 or even 1,000!). In addition, still to come. to all stakeholders in the program. element
3 The Value of Training Two critical success factors within an ITSM program are communication and training. A well-
thought-out ITIL training strategy and plan play a key role in successful ITSM programs.
Source: Alan Nance
3.1 Typical approach to training
Typically, a high number of staff is initially trained in Foundations, along with some Service Manager/Advanced-level training. Most of the training budget is spent
upfront, with little left to sustain Change throughout the program. This is a concern because most courses represent a significant investment to the company and
there is a Risk of having the wrong people trained before major organizational decisions are complete.

3.2 Recommended approach to training


This approach will sustain involvement over the length of the program, maximize education spend, and ensure that training is delivered on a just-in-time (JIT) basis.
The approach begins with a simulation. Simulations are valued for their ability to touch people at a “feeling” level, to firmly anchor the requirement for Change. “I hear
and I forget, I see and I remember, I do and I understand.” – Confucius, 600 BC
Simulation is then best followed by a core Foundation training as a level-set. This basic training is then best followed with a Mobilization Workshop as part of your
overall training strategy.
Introducing a Mobilization Workshop as the next step in your training strategy is intended to further enhance the effectiveness of Management of Change. Mobiliza-
tion provides a focused workshop for key stakeholders, where they assess their current ITSM environment and agree via group consensus on the need for Change,
emerging with a strong team commitment to and ownership of the ongoing program activities.
The remainder of the training plan over the Lifecycle of the program should be designed as role-based (once the new process roles have been assigned), with ap-
propriate funding over time, and should include a strategy for training new employees entering into the process-based organization.
3.3 Factors to Consider in Your Training Strategy
• Corporate geography, time zones, and shifts
• Budget
• JIT training
• Role-based training
• Overall program approach and objectives
• Formal certification training AND customized training, for example, ITIL 101’s (basic) process/product training unique to the organization

3.4 A Winning Program Strategy


• Respect the cultural/behavioral management of change – mobilize early and focus on quick wins.
• The most successful ITSM programs are those that are not called ITSM programs.
• Introduce formal training and communication planning.
4 Services “A means of delivering value to customers by facilitating the outcomes that the customers want to achieve
without the ownership of specific costs and risks.”

The differences

Product Service
Tangible Tangible (products) / intangible (activities)
Produced first, sold afterwards Sold first, developed afterwards
A product can be involved in one or more Services A Service is compiled from mostly a large number of
products
Perceived as an “end-to-end” Service Perceived as an “end-to-end” service
Performance measured in IT-technical terms Performance measured at the customer interface
Mostly defined in IT terms Defined in the “customer’s language”
Directly supporting the Services Directly supporting the “business processes”

Source: Quoted text source is ITIL® Service Lifecycle Suite 2nd Edition, 2011. Copyright © AXELOS Limited 2014. Material is reproduced under license from AXELOS.
PRODUCTS

Store Information

Store Files

Store What?
SERVICE
Store Equipment

Storage Service

Online Database

Store How?

Portable Devices

Secure Cabinets
5 Processes - What Are We Talking About?
Processes are routines: Benefits of Process Management:
• To organize the work as efficiently and effectively as possible. • Provide clarity to the business about what IT does.
• To prevent reinventing the wheel. • Impose organizational discipline.
• To measure and improve. • Define organizational boundaries and roles.
• Support continuous improvement.
• Allow processes to be audited and improved.
5.1 What Is a Process?
It is a set of activities in a logical order that transfers input into output, to achieve an objective for a customer.

Process
Input
Process Control Triggers Process Process Enablers

Process Policy
Process Process Work
Process Owner Metrics Instructions
Process
Resources
Process Process
Process Documentation
Activities Roles
Process
Process Objectives Capabilities
Process Process
Procedures Improvements
Process Feedback

Process Including Process


Output Reports and Reviews

Source: Based on AXELOS ITIL® Service Lifecycle Suite 2nd Edition, 2011. Reproduced under licence from AXELOS.
5.2 Characteristics of a Process
• Are measurable
• Have specific results
• Have customers and/or stakeholders
• Consist of a number of successive activities
• Have a clear start and end, as well as input and output
• Are repeatable
• Provide value for the organization/stakeholders
• Respond to specific events – while a process may be ongoing or iterative, it should be traceable to a specific trigger
Each previous activity delivers value to the following activity in the process; otherwise, this activity should be eliminated.
5.3 Characteristics of a Process According to ITIL
Measurable Customers
• Performance driven • Result delivery to a customer or stakeholder
• Cost, quality, duration, productivity, and so on • Could be internal or external
• Meeting customer expectations
Specific results
• Delivery of a specific result Respond to a specific event
• Individually identifiable and countable • Traceable to a specific trigger
5.4 Critical Success Factors in Process Management Design and Implementation
• Kick off an improvement initiative or process • Start process design activities with a clear vision • Demonstrate management commitment.
design workshop with the processes that are and specific objectives. • Demonstrate strong training, communication, and
clearly defined already. Some room to alter these • Delegate the process tasks, responsibilities, and awareness campaigns.
processes must be allowed to facilitate Change process ownership to people with the right level of
acceptance. skills, knowledge, and authority.
• Ensure that the processes are detailed at the right • Ensure the correct positions of the Process Owners,
levels. An overly detailed process description as required uniquely by the organization. Consider
will limit the flexibility required to customize the a mix with Process Managers, as appropriate.
process for the organization.
5.5 Process Implementation Approach

While it is important to note that


there is no “one-size-fits-all” formula 1 Define the vision: Why you want to work
with processes, what is to be achieved, what 5 Design and document the processes: Involve
the key stakeholders in the organization to help
for process implementation, here is is the relationship with the company’s strategy, prevent resistance to Change and to build a
and what are the business requirements strong crew of Change agents.
a set of steps that can be considered
– remember that Process Management is
when designing your program.
Remember, when you start with
implementing processes, you are
not a goal by itself.
6 Implement the processes: Activate the pro-
cesses according to the defined descriptions.

also changing the way people are


used to working. Normally, people
2 Define the objectives: Ensure that you use
SMART (Specific, Measureable, Achievable,
7 Audit the processes: Audit the processes peri-
Realistic, and Timely) as an approach to define odically to ensure compliance and adherence.
will resist Change, so it is important measureable objectives in line with the
to also consider your MOC approach,
such as Kotter’s 8 Steps for Change,
company’s strategy and vision.
8 Measure the performance of the processes:
Based on defined Key Performance Indicators
as part of your overall process
design/improvement activities 3 Identify the processes: Decide which
processes are in scope.
(KPIs), the processes can be measured for ef-
ficiency and effectiveness in support of further
improvement over time.
within your ITSM program.
4 Define the format of the processes: Processes
should be defined using a standard template
for creating a high level of acceptance, reorga-
nization, and availability – see Appendix C in
Service Design – Cabinet Office, 2011 for more
details.
6 Functions and Roles
“Service Management is a set DIFFERENCE BETWEEN FUNCTIONS AND ROLES
of specialized organizational
It is important to understand the difference between a formal function within an organization and
capabilities for providing
the process roles that the function is expected to perform. A formal function may fulfill more than one
value to customers in the form
specific Service Management role and conduct activities relating to more than one process.
of services. The capabilities
take the form of functions For example, a formal function, Network Administrator, may be responsible for performing Incident Manage-
and processes for managing ment as well as Capacity Management activities. Although the Network Administrator may report to a func-
services over a Lifecycle, with tional line manager, the Network Administrator is also responsible for performing activities for the Service
specialization in strategy, Desk Manager, the Incident Management Process Owner, and the Capacity Management Process Owner.
design, transition, operation,
and continual improvement.”

Source: Quoted text source is ITIL® Service Lifecycle Suite 2nd Edition, 2011. Copyright © AXELOS Limited 2014. Material is reproduced under license from AXELOS.
6.1 Functions

• Are units of organizations specialized to perform • Provide structure and stability to organizations. • Poor coordination between functions, combined
specific types of work and be responsible for • Typically define roles and the associated authori- with an inward focus, leads to functional silos that
specific outcomes. ties and responsibilities for a specific performance hinder the alignment and feedback critical to the
• Are self-contained, with the capabilities and and outcome. success of the organization as a whole.
resources necessary for their performance and • Tend to optimize work methods locally to focus • Well-defined processes can improve productivity
outcomes. on assigned outcomes. within and across functions.
• Have their own body of knowledge, accumulated
through experience.

Source: Based on AXELOS ITIL® Service Lifecycle Suite 2nd Edition, 2011. Reproduced under licence from AXELOS.
6.2 Roles “A set of responsibilities defined in a process and assigned to a person or team. One
person or team may have multiple roles, for example, the roles of Configuration
Manager and Change Manager can be performed by one person.”

ROLE RESPONSIBILITY
Process Owner Is accountable for the overall quality of the process and oversees the management of and
compliance with the processes, procedures, data models, policies, and technology associated
with the IT business process.

Process Manager Is responsible for the Operational Management of a process. There may be several Process
Managers for one process, for example, regional or departmental Change Managers or IT
Service Continuity Managers for each data center.

Service Owner Is accountable for the delivery of a specific service, regardless of where the underpinning
technology components, processes, or professional capabilities reside.

Source: Based on AXELOS ITIL® Service Lifecycle Suite 2nd Edition, 2011. Reproduced under licence from AXELOS.
7 RACI RACI is an authority model used to help define roles and responsibilities.

RACI is an acronym for the four main roles of:

R A C I
RESPONSIBLE ACCOUNTABLE CONSULTED INFORMED

The person or people respon- Only one person can be The people who are The people who are kept
sible for getting the job done accountable for each task consulted and whose opinions up-to-date on progress
are required
7.1 Building a RACI

“Whether RACI or some other tool or model The authority or RACI matrix clarifies — to all involved — which activities they are expected to fulfill and identifies
is used, the important thing is to not just any gaps in Service delivery and responsibilities. The RACI matrix can also be used to assess and develop staffing
leave the assignment of responsibilities models in the following way:
to chance or leave it to the last minute to
decide. Conflicts can be avoided and
decisions can be made quickly if the 1 2 3 4 5 6
roles are allocated in advance.”

Identify Identify/define Conduct Identify Distribute Ensure


the activities/ the functional meetings and any gaps or the chart and that the as-
processes. roles. assign RACI overlaps, for incorporate signments are
codes. example, where feedback. activated in the
there are two organization.
As or no As.

Source: Quoted text source is ITIL® Service Lifecycle Suite 2nd Edition, 2011. Copyright © AXELOS Limited 2014. Material is reproduced under license from AXELOS.
Example RACI Matrix
Director Service Service Level Problem Security Procurement
Management Manager Manager Manager Manager

A ctivity 1 AR C I I C

A ctivity 2 A R C C C

A ctivity 3 I A R I C

A ctivity 4 I A R I

A ctivity 5 I I A C I

In the RACI model, only one person can be accountable for an activity while “In this model, accountable means end-to-end accountability for the process.
several people may be responsible for an activity or parts of an activity. Accountability should remain with the same person for all activities of a
process.”
Source: Quoted text source is ITIL® Service Lifecycle Suite 2nd Edition, 2011. Copyright © AXELOS Limited 2014. Material is reproduced under license from AXELOS.
7.2 Critical Success Factors with RACI
• Having more than one person accountable for a process, meaning that, in • Incorrect division/combination of functions; conflicting agendas or goals
practice, no one is accountable • Combination of responsibility for closely related processes, such as Incident
• Delegation of responsibility or accountability without necessary authority Management, Problem Management, Configuration Management, Change
• Focusing on matching processes and activities with departments Management, and Release Management

Be aware of the time demands of each of the activities because the immediate activities will always take precedence over the more proactive activities.
For example, combining Incident Management activities with Problem Management activities within the same function.

Identify the gaps and remove the overlaps for the best approach to process efficiency and effectiveness.

Source: Based on AXELOS ITIL® Service Lifecycle Suite 2nd Edition, 2011. Reproduced under licence from AXELOS.
7.3 The Service Management Process Maturity Framework

The Service Management Process Maturity Framework (PMF) is the de facto standard for measuring the maturity of any process.
It is important to create an original baseline when starting your ITSM program However, be cautious in this approach because it may be difficult to find
to answer the “Where are we now?” question posed in the Continual Service benchmarks that come significantly close to the unique characteristics of your
Improvement (CSI) model. The PMF can be used to assess this initial baseline. organization. These benchmarks can be used to answer the “Where do we want
Because this approach is industry standard and has been in place for several to be?” question within the CSI model.
years, it may be possible to assess your organization’s maturity against industry
benchmarks.

Source: Based on AXELOS ITIL® Service Lifecycle Suite 2nd Edition, 2011. Reproduced under licence from AXELOS.
7.4 When to Assess? What to Assess?

A way to think about assessment timing is in line with the Deming At the end of a process project, it is important to vali-
improvement Lifecycle. date the increased maturity of the process and the
process organization because of the overall project.

Plan (Project Initiation) importantly, provides tangible


assess the targeted processes at the evidence that benefits are being
Assess the:
start of process introduction to form achieved from the investment of time
Vision and steering
the basis for a process improvement and resources in process initiatives.
project. Process
Do/Check (Process in Place)
Plan (Project Midstream) at the end of a process project, it is
People
a check during process implementa- important to validate the increased
Technology
tion or improvement activities serves maturity of the process and the
as validation that process project process organization because of the Culture
objectives are being met and, most overall project.
Source: Based on AXELOS ITIL® Service Lifecycle Suite 2nd Edition, 2011. Reproduced under licence from AXELOS.
7.5 The Process Maturity Framework (PMF)

In term of:

Vision and Steering

People
5 Optimizing

Processes

Te c h n o l o g y
4 Managed

Culture 3 Defined

2 Repeatable

1 Initial

Source: Based on AXELOS ITIL® Service Lifecycle Suite 2nd Edition, 2011. Reproduced under licence from AXELOS.
Initial Repeatable Defined Managed Optimizing
(Level 1) (Level 2) (Level 3) (Level 4) (Level 5)
The process has been recog- The process has been The process has been recog- The process has now been The process has now been
nized, but there is little or no recognized and is allocated nized and is documented but fully recognized and accepted fully recognized and has
Process Management activity. little importance, resources, there is no formal agreement, throughout IT. It is Service strategic objectives and
The process is assigned as or focus within the operation. acceptance, or recognition of focused and has objectives goals aligned with the overall
of no importance, with no In general, activities related to its role within IT operations as and targets that are based on strategic business and IT
resources or focus within the the process are uncoordinated, a whole. However, the process business objectives and goals. goals. These IT goals have
organization. This level can irregular, without direction, has a process owner, formal The process is fully defined, now become institutionalized
also be described as ad hoc or or directed toward process objectives, and targets with managed, and has become as part of everyday activities
occasionally even chaotic. effectiveness. allocated resources and is proactive, with documented, for everyone involved in the
focused on the efficiency as established interfaces and process. A self-contained, con-
well as the effectiveness of the dependencies with other IT tinual process of improvement
process. Reports and results processes. is established as part of the
are stored for future reference. process, which is now develop-
ing a pre-emptive capability.

1 2 3 4 5
Source: Based on AXELOS ITIL® Service Lifecycle Suite 2nd Edition, 2011. Reproduced under licence from AXELOS.
8 Metrics

8.1 Succeed with Measurements


One of the management trends of the past years is to work according to performance indicators. Organizations use performance indicators to check whether or not
the “ship is still going in the right direction.”

This is sometimes referred to as the “organization’s cockpit” or dashboard.

This approach to use metrics and measurements throughout the ITSM program answers the “Did we get there?” question posed in the CSI model.
8.2 Why Measure?
STRATEGY VISION

TO VALIDATE

YOUR
TO TO
FACTUAL EVIDENCE MEASUREMENT TARGET AND METRICS
JUSTIFY DIRECT
FRAMEWORK

TO INTERVENE

CHANGES AND
CORRECTIVE ACTIONS

Source: Based on AXELOS ITIL® Service Lifecycle Suite 2nd Edition, 2011. Reproduced under licence from AXELOS.
It is important to link the Ask yourself
creation and management What does the KPI really tell us about achieving the goal?
of KPIs and metrics to the
corporate vision, mission, How easy is it to analyze the KPI, and does the KPI support decision making?
goals, and objectives.

How accurate and stable is the KPI?

At what frequency do we need to report on the KPI?

Who owns the KPI?


VISION

MISSION

GOALS

OBJECTIVES

CSF

KPI

METRICS

MEASUREMENTS

Source: Based on AXELOS ITIL® Service Lifecycle Suite 2nd Edition, 2011. Reproduced under licence from AXELOS.
8.3 Continual Service Improvement Process

1 2
IDENTIFY THE
Data
DEFINE WHAT YOU
Wisdom STRATEGY FOR WILL MEASURE
IMPROVEMENT
Vision
apply
Business need

7 3
Strategy
IMPLEMENT GATHER THE DATA
Tactical goals
IMPROVEMENT Who? How? When?
Operational goals
Criteria to evaluate
integrity of data
Operational goals
Service measurement
PLAN

ACT DO
6
PRESENT AND USE THE

4
INFORMATION CHECK PROCESS THE DATA
Assessment summary
Frequency?
Action plans
Format?
Etc.

5
Tools and systems?
ANALYZE THE Accuracy?
INFORMATION
AND DATA
Trends?
Targets?
Improvements
required?
Knowledge Information

Metrics and measures using the 7-Step Improvement model from Continual Service Improvement:
Identify the strategy for improvement, define what you will measure, gather the data, process the data, analyze the information and data,
present and use the information, and implement improvement.
Source: Based on AXELOS ITIL® Service Lifecycle Suite 2nd Edition, 2011. Reproduced under licence from AXELOS.
8.4 Goals, Questions, and Metrics Approach

The Goals, Questions, and Metrics (GQM) paradigm (Basili – 1980s) stands the test of time as an approach to assist with identifying metrics.

An example:
Goal Questions Metrics
Reduce the business • Which Services impact the business the most? According to whom? • Current Incident volume, outage time, and

impact of IT outages • What is the current Impact of outages on these business Services? reasons for key IT Service outages

and user-experienced • What are the reasons for these outages? • Identified Problems causing multiple outages

problems. • What are the major perceived Problems according to users? • Changes carried out to rectify Problems
• How can we reduce the amount and duration of these outages and Prob- • Incident volume/outage time following
lems? Changes
• Where can we gain the most success or quick wins?

Source: Based on AXELOS ITIL® Service Lifecycle Suite 2nd Edition, 2011. Reproduced under licence from AXELOS.
8.5 Balanced Scorecard Approach In early 1992, Kaplan and Norton first introduced the idea of a Balanced Scorecard
in the Harvard Business Review. Since then, many organizations have used this
approach to measure initiative success against corporate strategy.

FINANCIAL Understanding IT costs to the business Customer Availability of IT Services


As customers how do Ability to control IT costs to the business What do we as Quality of IT Services
we view the costs of Economy of IT provision customers expect Performance of IT Services
IT provision? Return on IT infrastructure investments of IT provision? Value for money IT Services
IT contracts management Reliability of the IT Infrastructure
Support of hands-on IT users

INNOVATION Flexibility of the IT infrastructure Internal Service-oriented culture


Does our IT infrastructure Ability to control Changes to IT Services and What must our IT Skilled staff and IT expertise
enable us to continue to the IT infrastructure providers (internally) Efficiency of IT Service provision
Adaptability of the IT infrastructure to Service delivery times
improve the business? excel at?
changing demand in the business Processing capacity
Communication and knowledge transfer
Security
Business productivity in relation to IT costs
Accountability of IT provision
Harnessing (new) technology
Source: Based on AXELOS ITIL® Service Lifecycle Suite 2nd Edition, 2011. Reproduced under licence from AXELOS.
8.6 The Format of a Performance Indicator Steps to Develop Performance Indicators

Performance indicators should be defined and documented Here is an example of a step-by-step plan to develop performance
in a format that is owned and maintained as a document CI indicators in the processes. The Process Owner / Manager should:
in the CMDB. For each performance indicator, the following
should be defined and maintained:

• Title • Lead the measurement effort.


• Description • Educate the team about performance indicators and the measurement
• Measurement unit and reporting of corporate standards.
• Report frequency • Create a team for each process to determine measurement points and
• Period of the report capabilities.
• Employees responsible for the delivery of information • Create performance indicator documentation.
• Data sources • Validate the IT and business performance indicators with the manage-
• Performance indicator ownership (role accountable for action ment team.
on any reported exceptions) • Implement measurements and reporting.
8.7 Pitfalls During the Development of Performance Why Use Performance Indicators in Processes?
Indicators
Some of the pitfalls faced when developing performance indicators are:
• Obsessive measurement • Measurements are knowledge.
• Nondirected measurement – measure because we can • Processes are controlled.
• Lack of ownership of results • Improvement points are identified.
• Measurements not linked to business objectives • Facts, instead of opinions, become known.
It is recommended to start with a minimum number of highly relevant perfor- • There are links with policy and strategy.
mance indicators and to add or change them, as required, to validate, direct, • Business decisions are supported.
intervene, or justify ongoing program investment and continuity.
9. Technology 9.1 Service Design Tools

It is recognized that the use of Service Management • Assist with automating hardware, software, environment,
tools is essential for the success of all but the very process, and data designs.
smallest process implementations. However, it is • Speed up the design process.
important that the tool(s) being used support the • Ensure that standards and conventions are followed.
processes, not the other way around. As a rule, • Offer prototyping, modeling, and simulation facilities.
don’t modify processes to fit the tool. • Enable “What if?” scenarios to be examined.
• Enable interfaces and dependencies to be checked and
With today’s sophisticated levels of integrated correlated.
Service Management applications, it is important • Validate designs before they are developed and implemented to
to work closely with your technology partner ensure that they satisfy and fulfill their intended requirements.
to understand possible process functionality
limitations that might be expensive to recode
and support, as required. These decisions and
limitations may need to be taken into account
when designing your processes.
Source: Based on AXELOS ITIL® Service Lifecycle Suite 2nd Edition, 2011. Reproduced under licence from AXELOS.
9.2 Tools to Support the Service Lifecycle

• Service achievement, Service Level • A comprehensive set of search and A Statement of Requirements (SoR) is essential for
Agreement (SLA), Operational Level reporting facilities, enabling accurate use during the selection process. This can be used as
Agreement (OLA), contractual and supplier information and analysis for informed a check list, categorized using the MoSCoW analysis:
measurement, reporting, and management decision-making

M
• Consolidated metrics and Metrics Trees, • Management of Service costs
MUST have this
with views from management dashboards • Management of relationships, interfaces,
down to detailed component information, and interdependencies

S
performance and fault analysis, and • Management of the Service Portfolio and
SHOULD have this if at all possible
identification Service Catalogue
• Consistent and consolidated views across • Configuration Management System (CMS)

C
all processes, systems, technologies, and • CMDB COULD have this if it does not
groups • Service Knowledge Management System affect anything else
(SKMS)

W WON’T have this time but


WOULD like in the future

Source: Based on AXELOS ITIL® Service Lifecycle Suite 2nd Edition, 2011. Reproduced under licence from AXELOS.
9.3 Service Management Tools

Some aspects that organizations should consider when evaluating Service Management tools: The exact requirements for the
tool must be considered. You
• Breadth and depth of functionality • Ease with which data can be analyzed need to check what the man-
• Flexibility in implementation, usage, and presented datory requirements and the
and data sharing • Data structure, handling, and integration desired requirements are. There
• Implementation complexity • Distributed data input plus central data view are many integrated tools in the
• Ease of use and quality and extent • Experience and commitment of the marketplace to enable the
of supplier training supplier to best practices Service Management processes
• Quality of management information • Data backup and security and provide integration
produced as standard • Cost between the processes.
9.4 The Tool Evaluation Process

Identify your tool requirements before


researching products. Some of your WHAT REQUIREMENTS IDENTIFY PRODUCTS SELECTION CRITERIA
research may result in new require-
ments. Complete this iterative process
(if required) before defining your
selection criteria. EVALUATE PRODUCTS

SHORT LISTING

SELECT A PRODUCT RANK THE PRODUCTS SCORING

Source: Based on AXELOS ITIL® Service Lifecycle Suite 2nd Edition, 2011. Reproduced under licence from AXELOS.
10 ITIL Service Lifecycle

Source: Based on AXELOS ITIL® Service Lifecycle Suite 2nd Edition, 2011. Reproduced under licence from AXELOS.
Service Strategy Service Design Service Transition Service Operation Continual Service
Improvement
Provides guidance on Provides guidance on the Provides guidance on the Achieves effectiveness and Provides guidance on creat-
designing, developing, design and development of development and improve- efficiency in the delivery and ing and maintaining value
and implementing Service Services and Service Manage- ment of capabilities for tran- support of Services, for ensur- for customers through the
Management, not only as an ment processes. It covers sitioning new and changed ing value for the customer provision of approaches and
organizational capability but design principles and meth- Services into operations. It and the Service Provider. methods to achieve improve-
also as a strategic asset. ods for translating strategic also provides guidance on ments in Service quality,
objectives into portfolios of how the requirements of Ser- Maintains stability in Service operational efficiency, and
services and Service Assets. vice Strategy, as architected operations while allowing business continuity.
in Service Design, are finally for Changes in design, scale,
realized in Service Operations scope, and Service levels.
while controlling the risks of
failure and disruption.

Source: Based on AXELOS ITIL® Service Lifecycle Suite 2nd Edition, 2011. Reproduced under licence from AXELOS.
w w w. I Tp r e n e u r s . c o m

You might also like