1 - project
Introduction
As part of the Managing safely course, you have to complete a project and have it
assessed. You will be expected to carry out a risk assessment based on your own work
environment. You need to record the results on the attached sheets and submit them for
marking. Do not submit any additional material in support of your project work as only the
six parts of the A4 project will be assessed. The project can be word processed or hand
written.
There is a two week time limit for the return of the project. Your project must be completed
and returned by
Instructions
Please read all of the instructions before starting work on your project.
The project is broken down into a number of parts. Please complete each section as
detailed below.
Record a brief description of all the work tasks within your work environment including:
MS Project
Pack version 3.1
..
Record a brief description of three location hazards that may arise in your work
environment. For example, car park, stairs, uneven floor. For each of these hazards
please include:
Record a brief description of three hazards that may arise from equipment or substances
used. For each of these hazards please include:
Part 4 - a hazard checklist of the activities carried out within your work environment
Record a brief description of three hazards that may arise from within your work
environment. For each of these hazards please include:
Note: for the purpose of this exerc;:ise all three activity hazards that you are
assessing on part 4 must require a risk assessment.
Please carry out a risk assessment on all three of the activity hazards you have listed on
part 4. Please make sure you include:
Note: for the purpose of this exercise all three activity hazards that you are
assessing on part 5 must require risk controls.
MS Project
Pack version 3.1
Part 6 - risk control recommendations
Please complete the risk control form for all three activity hazards you have listed on part
5. Please make sure you include:
• a description of the work activity and risk level from the risk assessment
• existing risk controls
• any further risk controls required - in relation to the work activity
• the residual risk (please use the 5 x 5 matrix) - in relation to the work activity
• a description of the type of monitoring required and how often - in relation to the
residual risk
Note: where you have large numbers of hazards in your work environment you will not
have space to record them all. In these circumstances, select a representative sample of
hazards for the purposes of this project and record only these. Remember that only three
hazards are required for parts 2, 3, and 4.
Each part has a maximum number of marks which can be awarded and details are given
in the table below.
1 18
2 16
3 16
4 13
5 30
6 30
Total 123
Minimum mark 62
Finally, before returning your project check that your name, the end of course date, the
name of your company, the site name and the name of your training provider are recorded
on the first sheet. '
Please also ensure that you sign each sheet to confirm that the work you submit is your
own.
Please note: the small square boxes in the bottom right hand corner of each section
on parts 2 to 6 are for the markers use only.
MS Project
Pack version 3.1
Marks
allocated
Part 1 - description of the work tasks that are your
responsibility (continued on the next page)
A description of the people who work in or visit the area on a regular basis
or from time to time and how often they're there ¥
People on regular basis
1. Civil Engineers Supervisor Operator Workers
12 10 20 55
2. Mechanical Engineers Supervisor Operator Workers
10 12 18 30
3. Electrical Engineers Supervisor Operator Workers
11 11 22 40
4. Construction Engineers Supervisor Operator Workers
10 10 05 20
5. Safety Manager Supervisor Officer
01 ;
4 08
People on Visit
Managers Administration Visitors
I 05 06 I 20 I
Total 270
I I I
Raw Materials :
Product:
All Equipment are using to moving the aluminium and also for housekeeping
MS Project
Pack version 3.1
Hazard Checklist: locatlonsts) Part 2
iosh The location(s) you manage
Description of the Description of the hazard Number and occupation of Risk assessment
(in relation to the location)
location people affected recommended?
(in relation to the location) (If no, please explain)
0 n Total 26
0 0
1. Inclement weather sun, rain, Sand Engineers 02 LlYes ONa
storm Vehicles Operators 03
Installing Bus Bars in Pot 2. Noise of generator Workers 12
rooms 3. Live services like electrical cables Operators 04
4. Manual material handling
0 0 Total 21
0 0
1. Vehicle collision Engineers 03 LlYes ONa
2. Insufficient lighting Vehicles Operators 06
Anode rod shop in 3. Ergonomic hazard Workers 19
maintenance area 4. Fire hazard during melting Operators 05
alumina
~# 0 0 0
Total 33
0
MS Project
Please sign to confirm that this is your own work: Pack version 3.1
Hazard Checklist: equipment and substances Part 3
Permanent and temporary pieces of equipment and substances used in the work environment
"0 0 Total 30
0 0
Engineers 02 [jYes ONO
l. Chemical hazards Coke Dust Vehicles Operators 03
Carbon during loading and unloading Workers 22
2. Exposure Operators 10
3. Inhalation of carbon
4. Crane moving hazard of workU Total 37
0 collision 0 0
l. The crane collapsing or toppling Engineers 01 c:JYes ONO
over Vehicles Operators 03
Crane 2. The load falling overloading Workers 15
3. Live services like cables Operators 02
4. Blind spot during work
Total 21
0 0 0 0
MS Project
Please sign to confirm that this is your own work: Pack version 3.1
Hazard Checklist: activities Part 4
lash Activities carried out within your work environment
: EMAL Deoartment: Site name: EMAL ALMUNIUM
Note: For the purpose of this exercise, all three activity hazards must require a risk assessment.
~
Description Of,the
Work activity
I De~cri~tion Of,the h~zard
(m relation to the work activity)
I
,I
Number and occupat, ion of
people affected' .
Risk assessment
recommended?
'(in relation to the wor,k,acl:iliiM
""'A
0
3. Crane moving hazard of worker
collision o I Total 34
o o
1. During erection of bus bar Engineers 07 rJYes ONo
Setting the new bus bars by moving of crane boom Vehicles Operators 01
crane in pot rooms I 2. Blind spot for crane operator
3. Collision with workers
Workers
Operators
12
03
01 o I Total 23
o o
~Yes ONo
Maintenance shop is for 1. Noise of generators Engineers 00
maintenance, repairing and 2. Fire hazard during welding Vehicles Operators 05
welding equipment 3. Current hazard due to sparking Workers 14
4. Tools using in workshop Operators 05
o 5. Fume
o Total 24 o o
MS Project
Please sign to confirm that this is your own work:__ ~+-,t.b...£....-I-__ Pack version 3.1
..
iosh Risk assessment form Part 5
Company: EMAL Department: Field Engineering Site name: EMAL ALMUNIUM
Note: For the purpose of this exercise, all three activity hazards must require risk contro s.
Work Hazard, hazardous event and People Assessment of risk
(m relation to the work activity)
Are risk controls'
activity expected consequence affected Likelihood X Consequence = Risk required?
(in relation to the work activity) (in relation to the work level level level
activity)
l. Chemical hazards Coke Dust during Occupation:
loading & unloading
Unloading Vehicle operator,
May cause respiratory problem
Coke and Workers & operators
2. Crane moving hazard of worker
putting on the collision Injury 4 5 20
conveyer 0 5. Crane moving hazard of worker
collision C
Number: 22
0 0 0 0
l. During erection of bus bar Occupation:
Setting the moving of crane boom Injury
Engineer, Vehicle ~Yes ONo
operator, Workers
new bus bars 2. Blind spot for crane operator- & operators
by crane in Can cause collision workers 4 5 20
3. Collision with workers Number: 25
potroomsc
May cause serious injury 0 0 0 0 0
l. Noise of generators hearing loss Occupation:
Maintenance 2. Fire hazard during welding Workers & operators ~Yes ONO
3. Current hazard due to sparking can
shop is for cause borne
maintenance Number: 15 4 4 16
repairing
welding
'E] 4. Tools using in workshop
5. Fume
Injury [
] 0 0 0 0
Date: 18-11-13 Time: 04:30 pm Review period: One Month Date of next review: 20-12-13
Q
Setting the new 3. Proper 1. Permanent hard Engineer
bus bars by Barricade barricading until work
crane in pot 4. Awareness by finish 3 2 6
rooms training worker 2. Arrange training of
Frequency: After
Risk level: 200 0
workers for working in
0 0 0 Starting & Completing
blind spot
n shift
~
Maintenance Permanent monitoring during
shop is for 1. Provide ear 1. Workers training to wear working hours
maintenance, plugs and use ear plugs 2 2 6
repairing and C 2. Don't use
handmade tools
2. Provide fire
extinguishers & fire watch
Frequency: After Starting
welding
Risk level: 16 I man 0 0 0 0 & Completing shift
121
Date: 18-11-13 Review period: One Month Date of next review:
..