ISSUE 9

2014

Construction
Manual

The details and information in this book are for guidance purposes only and are not site specific.
Named materials must be used to conform with C.A.T.G. certification. Refer to the relevant design
manual and panel drawings for the site, which should be read in conjunction with the approved
Building Regulation drawings and must be adhered to and take priority over standard details. FOR
FIXING DETAILS REFER TO ERECTION MANUAL and DESIGN MANUAL.
Sips Eco Panels MANUAL.
CONTENTS

GENERAL INFORMATION AND GLOSSARY OF TERMS 3.00 INTERNAL DETAILS


CM1 FOREWORD CM310 NOGGINGS AND PANEL CONNECTION
CM2 NOT USED CM311 PLASTERBOARD FIXING DETAIL
CM3 PARTY WALL ACT SHEET 1 CM312 MID FLOOR SOUND INSULATION
CM4 PARTY WALL ACT SHEET 2 CM313 WALL SOUND INSULATION
CM5 TYPICAL EXTERNAL WALL CM314 JUNCTION OF LOADBEARING WALL WITH FLOOR
CM6 GLOSSARY OF BUILDING TERMS SHEET 1 CM315 INTERNAL WALL TO WALL JUNCTION
CM7 GLOSSARY OF BUILDING TERMS SHEET 2 CM316 NON LOADBEARING WALL AND FLOOR SHEET
CM8 SCAFFOLD DETAILS CM317 WALL JUNCTION IN 4 DIRECTIONS
CM9 SCAFFOLD SECTION CM318 NON LOADBEARING WALL PARALLEL TO JOISTS

1.00 FOUNDATIONS AND GROUND FLOOR DETAILS 4.00 ROOF DETAILS


CM110 DPC RELATIONSHIP WITH CHIPBOARD FLOOR CM410 CLOSED EAVES
CM111 DPC RELATIONSHIP WITH SCREEDED FLOOR CM411 CLOSED EAVES AT WINDOW HEAD
CM112 RESTRAINT STRAP FIXING 1 CM412 FLUSH EAVES
CM112.1 RESTRAINT STRAP FIXING 2 CM413 OPEN EAVES
CM113 WIND PORTAL FOUNDATION DETAILS CM414 TYPICAL RIDGE AND ATTIC DETAILS.
CM114 SOLEPLATE FIXING CM415 ROOF PANEL TO PANEL CONNECTION
CM115 JUNCTION OF INTERNAL LOAD BEARING WALL
AND FOUNDATIONS 5.00 MISCELLANEOUS DETAIL
CM116 MOBILITY DOOR FRAME AND SCREED CM510 PLASTERBOARD SPECIFICATION
CM117 MOBILITY DOOR FRAME AND CHIPBOARD CM511 INTERNAL DOOR LINING
2.00 EXTERNAL WALL DETAILS CM512 METER BOX DETAIL
CM513 FLUE DETAIL
CM210 EXTERNAL WALL AND TRUSS ROOF CEILING CM514 WALL HUNG BOILER DETAIL
CM211 RIM BEAM CM515 CHIMNEY DETAIL
CM212 JUNCTION OF EXTERNAL AND INTERNAL WALLS CM516 CHIMNEY SECTION
CM213 DOOR AND WINDOW FIXING SHEET 1 CM517 WATER TANK DETAIL
CM214 DOOR AND WINDOW FIXINGS SHEET 2 CM518 NOT USED
CM215 INSTALLATION OF uPVC WINDOWS SHEET 1 CM519 NOT USED
CM216 INSTALLATION OF uPVC WINDOWS SHEET 2 CM520 NOT USED
CM217.1 PARTY WALL EDGE SEALING DETAIL1 CM521 DRILLING HOLES THROUGH INTERNAL WALLS
CM217.2 PARTY WALL EDGE SEALING DETAIL2 CM522 ALLOWANCE FOR VERTICAL MOVEMENT
CM217.3 PARTY WALL EDGE SEALING DETAIL3 WHEN USING MASONRY CLADDING
CM218 EXTERNAL SINGLE DOOR OPENING CM523 SUPPORT TO HEAVY OBJECTS
CM219 CLADDING DETAIL - TIMBER
CM220 CLADDING DETAIL - RENDER
CM221 CLADDING DETAIL - RENDER (MOVEMENT JOINT)
EXTERNAL WORKS
CM222 CLADDING DETAIL - TILING CM610 TREE PROTECTION NOTES
CM223 EXTERNAL WALL CORNER CM611 TREE PROTECTION ZONE SHEET 1
CM612 TREE PROTECTION ZONE SHEET 2
CM613 SELF-BUILD PROGRAMME
ISSUE 9
2014

CONTENTS
FOREWORD

The enclosed details are indicative of current practice and are issued for guidance
only.
Any timber frame structure manufactured and supplied by Sips eco panels will be
designed specifically for the project and will be detailed accordingly. Construction
of the timber frame must be carried out in accordance with the drawings and details
issued for construction.

Sips eco panels reserve the right to amend details as required to reflect revised
practices and changes in Building Regulations.

Whilst we believe that the contents reflect current Building Regulation requirements
it is the builder's or project manager's overall responsibility to ensure compliance
and to seek approval from Building Control Officers or other certifiers, as no
warranty is given or should be implied as to the accuracy of the information for any
specific application.

THIS MANUAL MUST BE READ IN CONJUNCTION WITH NHBC AND OTHER


GUARANTOR'S STANDARDS, ALL RELEVANT BRITISH STANDARDS AND
CODES OF PRACTICE AND ANY OTHER SPECIFICATIONS RELATIVE TO
YOUR PROJECT.

CONSTRUCTION (DESIGN & MANAGEMENT) REGULATIONS (1994)

All construction projects large and small are subject to the CDM Regulations
(1994). Essentially the regulations make the client responsible for implementing
aspects of health and safety on their site.

If the development will be for a domestic client or will be less than 30 days in
duration then the responsibility for Health and Safety is then passed onto the main
contractor. In most cases for Sips eco panels the client is the main contractor.

In all cases the client may devolve this responsibility to a CDM Planning
Supervisor, who will act on the clients behalf. Please refer to a Planning
Supervisor for advice.
ISSUE 9
2014

FOREWORD
CM1
THE PARTY WALL etc. ACT (1996)

INTRODUCTION

The Party Wall etc. Act 1996 came into force on 1st July 1997 throughout England and Wales.

If you intend to carry out building work which involves one of the following categories:

neighbouring property (section 1 of the Act)

You must find out whether that work falls within the Act (your project manager will be able to
advise you on this). If it does, you must notify all affected neighbours. A notice must be given
even where that work will not extend beyond the centre line of a party wall.

The Act covers:

of the hole or foundations.

The Act provides a framework for preventing and resolving disputes in relation to party walls,
boundary walls and excavations near neighbouring buildings. It is based on some tried and tested
provisions of the London Buildings Acts, which applied in inner London for many decades.

On the following page a brief, simple outline is given to explain the Act.
THIS IS NOT AN AUTHORATIVE INTERPRETATION OF THE LAW. You must remember that
reaching an agreement with your neighbour under the Act DOES NOT remove the possible need
for planning permission or building regulations approval.

In all cases please refer to a party wall surveyor for advice.


ISSUE 9
2014

PARTY WALL ACT


CM3

SHEET ONE
THE PARTY WALL etc. ACT (1996)

WHAT IS A PARTY WALL?

The Act recognises two main types of party wall. These are referred to as a 'party wall' or a 'party
fence wall'.
A wall is a 'party wall' if:

(i) it forms part of a building and stands astride the boundary of land belonging to two (or more)
different owners; or
(ii) it separates buildings and it either

(a) stands astride the boundary of land belonging to two (or more) different owners; or
(b) stands wholly on one owner's land, but is used by two (or more) owners to separate their
buildings. Where one person has built the wall in the first place and another has butted their
building up against it without constructing their own wall, only the part of the wall that does the
separating is 'party' - sections on either side or above are not 'party'.

A wall is a 'party fence wall' if it is a wall which is not part of a building, that stands astride the
boundary line between lands of different owners and is used to separate those lands (for example
a garden wall). This does not include such things as wooden fences.

The Act also uses the expression 'party structure'. This is a wider term, which could be a party
wall or a floor partition or other structure separating buildings or parts of buildings approached by
separate staircases or entrances (for example flats).

If you plan to:

neighbouring owner's building or structure where that work will go deeper than the neighbour's
foundations; or

neighbouring owner's building or structure where that work will cut a line drawn downwards at
45o from the bottom of the neighbour's foundations;

You must inform the adjoining owner by serving a notice. The notice must also state whether you
propose to strengthen or safeguard the foundations of the building or structure belonging to the
adjoining owner. The notice must be accompanied by plans.

The Act contains no enforcement procedures for failure to serve a notice. However, if you start
work without having first given notice in the proper way, adjoining owners may seek to stop your
work through a court injunction or seek other legal redress.
ISSUE 9

PARTY WALL ACT


2014
CM4

SHEET TWO
THE EXTERNAL WALL CONSISTS OF TWO PARTS;
THE LOADBEARING SIP PANEL.
THE OUTER CLADDING.THIS MAY BE A HEAVYWEIGHT CLADDING SUCH AS BRICKWORK SUPPORTED
INDEPENDENTLY OFF OF FOUNDATIONS, OR A LIGHTWEIGHT CLADDING ATTACHED TO THE TIMBER
FRAME SUCH AS; RENDER, HANGING TILES OR TIMBER BOARDING. REFER TO OTHER SECTIONS OF THIS
MANUAL CM219 - CM222. SEE NOTE BELOW

SIP PANEL

BATTENS FOR SERVICE VOID (WHERE REQUIRED).


FOR PLASTERBOARD
SPECIFICATION REFER TO
DRAWING CM44

BREATHER HOLDING DOWN STRAPS SUPPLIED BY


MEMBRANE Sips Eco Panels AND FIXED BY
BRICKWORK CONTRACTOR. SEE CM112

VAPOUR CONTROL LAYER


(VCL SUPPLIED & FITTED BY
OTHERS BEHIND)
FLOOR FINISH
SEE CM110 & CM111

OPEN PERPENDS TO
VENTILATE AND DRAIN
THE CAVITY SPACED
AT MAX. 1500mm c/c
HELICAL TIES (NOT SUPPLIED). STAINLESS
STEEL HELIFIX TimTie 6 or SIMPSON
STRONGTIE TIMBER FRAME WALL TIES
SWT50 SPACED AT MAX 600mm c/c
HORIZONTALLY AND 450mm c/c
VERTICALLY

FINISHED VENTILATED DPC


GROUND CAVITY DPC
LEVEL

SOLEPLATE - THIS PROVIDES A LEVEL


AND ACCURATE POSITIONED BASE ON
WHICH THE SUPERSTRUCTURE WILL BE FIXED,
INCLUDING THE FLOOR IN THE CASE OF
SUSPENDED TIMBER GROUND FLOORS.
IT ALSO PROVIDES A NAILING PLATE FOR
THE SIPS PANEL AND PROTECTS THE DPC
FLOOR DPM LAPPED WITH
DPC AND TURNED UP TO
LAP WITH VAPOUR
THE CONSTRUCTION OF EXTERNAL WALLS MUST COMPLY WITH
CONTROL LAYER.
APPROVED DOCUMENT B OF THE BUILDING REGULATIONS
PARTICULARLY IF THE CLADDING IS COMBUSTIBLE AND WITHIN 1M OF
THE BOUNDARY, WITH PARTICULAR ATTENTION TO PART B4
HIGHLIGHTING THE SPECIFIC MINIMUM REQUIREMENTS OF FIRE
RESISTANCE.THIS INCLUDES OPENABLE AREAS.

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


ISSUE 9

TYPICAL
2014
CM5

EXTERNAL WALL
Aggregate: sand and/or stone mixture, used with cement to make concrete

Architrave: wooden strips around a door or window, which cover the join between the door lining and wall

Barge board: the board that hides and protects the outside edge of a gable

Barge foot: Timber piece at the bottom of the bargeboard, blocking off the gap under the eaves

Base rail; also known as bottom plate: the lower horizontal member of a timber wall panel

Batten: a piece of timber fixed in place for something to be attached to - notably, rows of battens are put
on the roof to hold the tiles. These are also used to fix plasterboard to off of the SIPS panel.

Blocking: pre-cut timbers that are fitted between joists above a wall panel on which further wall panels are
fitted, and to fix plasterboard at ceiling level

Breather membrane: waterproof sheeting applied to the outside of a SIPS panel to keep water out but to
let the frame 'breathe'

Cavity: the gap between the external and internal walls of a house. Cavity construction is common in this
country. A drained and vented cavity is maintained between the external cladding (brickwork or similar)
and the timber structure to remove any water that penetrates the outer skin in extreme conditions while the
venting increases the safety margin against condensation risk.

Cavity closers: These close the cavity in a cavity wall. For instance at eaves level and at window and
door openings. They prevent smoke from penetrating the building. They could be sleeved mineral wool or
timber. These must be treated timber and cut ends brushed with preservative. A separate DPC should be
fitted on the outside to protect the timber.

Cement: A powder that, when mixed with water and aggregate forms concrete, screed, mortar or render. It
is a term occasionally used for glue.

Compactor: machine with vibrator that compacts material - e.g. hardcore in foundations

Concrete: a mixture of water, sand, stone and a binder (usually cement) that hardens to a stone like mass.

Corbel: projection of brickwork from a wall, for instance to support a beam or roof truss.

Courses: Parallel layers of brickwork, blocks, tiles etc. A soldier course is a course laid vertically - for
instance, above a window

Decking: term used to describe any timber floor area

DPC and DPM: damp proof course and damp proof membrane respectively. A DPC is a wide strip of
plastic laid along the base of the brickwork skin to prevent rising damp. A dpm is plastic sheeting laid
under or over the concrete slab to prevent damp rising

Dry lining: plasterboard finish to walls fitted to battens off of the SIPS panel.

Eaves: The lowest, overhanging part of a sloping roof, or the area under it. Usually used to fix gutters to.

Efflorescence: Powdery white salts on the face of brickwork as it dries out, created by water moving
through the wall from gypsum or pyrite in the clay and coal the bricks are fired with. When the water dries
out, salt deposits are left behind. Efflorescence can be greatly reduced, if not prevented, by keeping bricks
dry during laying, which includes covering them at night.

Fascia: board fitted over the ends of the roof trusses and carries the gutter

Felt: sheets laid beneath the roof tiles to waterproof the trusses below.

Flashing: lead used to dress up walls at external joints for instance around chimneys.

Frog: a depression in one or more faces of a brick. Such bricks should be laid with the frog facing up

Gable: the end of a wall that is vertically triangular in shape


ISSUE 9

GLOSSARY OF BUILDING
2014
CM6

TERMS SHEET ONE


Gable ladder: pre-made component which abuts the first roof truss and forms the overhand on a gable roof.

Gallows brackets: Triangular brackets used to support the weight of an


item such as a bay window or porch

Joist: a beam that supports a floor or ceiling

Lintel: a beam above doors and windows and other openings used for supporting the structure above.

Open Perpends: The cavity between the SIps wall and brick or block cladding should be self draining. The
openings (Open Perpends) provide for drainage; Open Perpends at 1.5 m maximum centres should be kept clear
of mortar. Proprietary plastic ventilators of perpend width are available. Open Perpends should be used above
wherever the cavity is bridged with a horizontal cavity tray,such as a lintols or roof abutments etc.

OSB: Oriented strand board is an engineered wood product formed by laying strands (flakes) of wood in specific
orienations. It is used on the outside faces of a SIPS panel sandwiching the expanded poystyrene. It can also be
used in many ways the same as plywood and is becoming a more popular form of board.

Oversite: concrete base laid over the foundations. Normally the ground floor slab.

Panel: a section of wall, floor, ceiling or roof pre-fabricated and forming part of a timber frame kit

Profiles: timber boards that are used initially to mark the foundation boundaries

Purlin: a beam in roof construction, which supports the rafters or SIPS roof panels.

Quilt: term used to describe the mineral wool often supplied in rolls 300-900mm wide used for insulation of internal
walls and floors

Rafter feet: end of rafter where gutter or fascia is fixed

Ring beam: perimeter timber in a joist frame floor

Rim beam: Similar to a ring beam but acting as a continuous lintel around the perimeter of a building.

Sarking: a detail of roof boarding common in Scotland that can be used to give extra strength and
weatherproofing. The entire roof is covered by sheathing boards nailed to it before the roof is felted and then tiled.

Screed: smooth sand and cement mixture applied to finish off a concrete floor

Setting out: marking out on the ground the area where the house is going to be built

Skim: thin topcoat of plaster. It can be applied to plasterboard to give a slightly silkier feel to the wall. Most
plasterboard is however, finished 'dry' when it is taped and jointed, ready for immediate decoration

Soffit: flat plywood fixed beneath the eaves between the back of the
fascia and the wall to conceal the rafters. It can incorporate a soffit ventilation strip to ventilate the roof space if
breathable roofing felt is not used

Soleplate: a treated timber anchored to the base to fix and set out wall panels

Stack: soil pipe running from top of the house down to the drain. The top is open to the outside allowing the drain
to ventilate. Some stacks are non-venting and these will have a screwed down cover. These must be joining a drain
run that is ventilated at its furthest point.

Studwork: the timber framework of internal walls

Tacking: nailing of plasterboard to battens without driving the nail fully home

Truss: prefabricated frame for the roof construction. Fink trusses are used as standard and are cheaper than attic
trusses, but the latter will allow space in the loft to be utilised for accommodation. SIPS are used to create a roof
allowing the loft area to be used as usable space where possible.

Vapour control layer (vcl): 500g gauge polythene sheeting. An airtight skin to prevent interstitial condensation.
Fitted to the inside face of an external wall or internal room where steam can occur it protects the wall from
condensation.

Verge: the point at which the brickwork in a gable meets the roof. It is the overhang of the roof that should not
exceed 50mm.

Wallplate: horizontal members attached to the end of studding in internal panels. Head binders are also referred
to as wallplates.

Wall ties: span the cavity to help support the brickwork of the outer walls. Helifix TimTie 6 or stainless steel timber
frame wall ties may be used. These are screwed into the panel and laid on the mortar bed of brickwork.

For further useful building terms you may wish to refer to the Penguin Dictionary of Building
ISSUE 9

GLOSSARY OF BUILDING
2014
CM7

TERMS SHEET TWO


NOTES:

THIS DRAWING SHOWS THE SCAFFOLD REQUIREMENT FOR


ERECTION OF SIPS PANELS ONLY. IT IS NOT THE REQUIRED
SCAFFOLD FOR THE BRICKWORK CONTRACTOR.

600mm BELOW SOFFIT/ WHEN ROOF IS CONSTRUCTED


LOWEST EAVES LEVEL. PROVIDE SCAFFOLD TO FRONT OF
DORMER WINDOW.

Platform Level
Platform Level

APPROX
2100

Platform Level
TO SUIT
DESIGN

Platform Level
ABOVE
S.S.L
2100

FOR SINGLE STOREY BUILDINGS SET PLATFORM AT 2000 AND 2400

TYPICAL SCAFFOLD ELEVATION.

Site Access Notes:


3000mm minimum clear space to be left adjacent to where
the sips wall panels will be unloaded from the lorry, to allow
wall panels to be loaded into ground floor positions & onto
first floor.

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


ISSUE 9
2014

SCAFFOLD DETAILS
CM8
SCAFFOLDING TO THE FULL PERIMETER OF THE SIPS FRAME WILL BE REQUIRED TO GIVE A
FULL WORKING LIFT AT EACH FLOOR LEVEL AND AT ROOF LEVEL A MINIMUM 910mm BELOW
WALLPLATE LEVEL (TOP OF PANEL) TOGETHER WITH ANY LIFTS AT GABLE ENDS TO ENABLE
PEAK PANELS AND VERGE DETAILS TO BE COMPLETED.
SUITABLE SECURE LADDER ACCESS IS REQUIRED AT ALL LEVELS AND IS TO BE PROVIDED AND
FIXED BY THE MAIN CONTRACTOR. A CRASH MAT MUST BE SUPPLIED BY CLIENT AND HANDRAIL
MUST BE FITTED BY Sips Eco Panels AT THE APPROPRIATE TIME.

Scaffold to be an independent
structure, with no ties to the
timber frame.
950-1150 handrail

L I N E O F SIPS T I M B E R F R A M E
2100 TO PLATFORM FROM S.S.L.

NOTE: THIS SCAFFOLDING IS FOR THE ERECTION OF THE TIMBER FRAME ONLY
IT IS NOT THE REQUIRED SCAFFOLD FOR THE BRICKWORK CONTRACTOR.

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


ISSUE 9
2014

SCAFFOLD SECTION
CM9
Sips Eco Panels RECOMMEND THE BRICKWORK SHOULD NOT BE
STARTED BEFORE THE SIPS FRAME HAS BEEN ERECTED.

Sips Eco Panel


REFER TO CM5

RESTRAINT STRAPS (SUPPLIED BY Sips


Eco Panels) TO BE FIXED AT 1200 c/c.
BUILT INTO BRICKWORK AND SET
BELOW LEAN MIX CONCRETE CAVITY
FILL (IF REQUIRED). THESE MUST BE 22mm CHIPBOARD ON
FITTED BY BRICKLAYER TO SUIT BRICK VAPOUR BARRIER ON
COURSES. SEE CM112. 90mm INSULATION ON
D.P.M LAPPED WITH WALL VCL ON
SUSPENDED CONCRETE SLAB

OPEN PERPENDS AT 1500c/c


MIN.150

F.F.L.
D.P.C.
D.P.C.

112
GROUND LEVEL
CAVITY
MIN. 225
CLEAR

150mm BELOW
LOWEST TIMBER
EXTERNAL WALL
D.P.C.
300 MIN.

440 x 112 x width of wall 7N/mm2 Dense


MIN 225mm
Concrete Blocks (cut to suit finished floor depth),
VENTILATED VOID
Density 1950kg/m3 or similar approved on 15mm
TO SUIT GROUND
Mortar bedding - total 155mm upstand. 155mm
CONDITIONS.
concrete upstand can also be used with a GEN1
mix.' N.B. If the block wall overhangs the cavity,
the erectors must ensure the DPC is lapped over
1000 MINIMUM

the outside face of the coursing block to stop


NOT A BRICK COURSE

water ponding on top of the overhang. It is


possible that to avoid this the block could be
flush with the floor and frame (cavity side), but a
Building Inspector may query the internal cold
bridge - this should be checked with your
Building Control and / or Insurance Inspector
(NHBC etc.)

450/600 x MINIMUM DEPTH AS SHOWN ON MASS


CONCRETE FOUNDATIONS TAKEN DOWN TO BEAR INTO
VIRGIN SUITABLE STRATUM. FOUNDATIONS ALSO TO
BE TAKEN DOWN MIN. 300 BELOW ANY ROOT
PRESENCE.

FOR FOUNDATION SETTING OUT REFER TO FOUNDATION LOCATION PLAN


THIS DRAWING SHOWS TRADITIONAL TRENCH FILL FOUNDATIONS AND IS NOT SITE SPECIFIC. ALL GROUND
FLOORS & FOUNDATION DEPTHS/DESIGN TO BE APPROVED BY THE LOCAL BUILDING INSPECTOR AND TO SUIT
LOCAL GROUND CONDITIONS.
THIS DRAWINGS IS TO BE READ IN CONJUNCTION WITH THE BUILDING REGULATIONS NOTES AND DRAWINGS.
HOUSE SETTING OUT RELIES ON F.F.L [Finished Floor Level] = EXTERNAL D.P.C. LEVEL.
TOP OF SOLEPLATE MAY REQUIRE CUTTING OUT AT INTERNAL AND EXTERNAL DOOR POSITIONS.
NO BRICKWORK IS TO BE CONSTRUCTED BELOW DPC LEVEL (TO EXTERNAL CAVITY SKIN) UNTIL AFTER THE
TIMBER FRAME HAS BEEN ERECTED (TO ENSURE THAT A NOMINAL 50mm CAVITY IS MAINTAINED BETWEEN
TIMBER FRAME AND OUTER SKIN).

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


ISSUE 9

DPC RELATIONSHIP WITH


CM110

2014

CHIPBOARD FLOOR
SIPs Eco Panels RECOMMENDS THE BRICKWORK SHOULD NOT BE
STARTED BEFORE THE SIPS FRAME HAS BEEN ERECTED.

Sips Eco Panel.


REFER TO CM5

RESTRAINT STRAPS (SUPPLIED BY (Sips Eco


Panels) TO BE FIXED AT 1200 c/c. BUILT INTO
BRICKWORK AND SET BELOW LEAN MIX
65mm SCREED ON
CONCRETE CAVITY FILL (IF REQUIRED). THESE
VAPOUR BARRIER ON
MUST BE FITTED BY BRICKLAYER TO SUIT
90mm INSULATION ON
BRICK COURSES. SEE CM112
D.P.M LAPPED WITH WALL
VAPOUR BARRIER ON
SUSPENDED CONCRETE SLAB

OPEN PERPENDS AT 1500c/c


MIN.150

F.F.L.
D.P.C.
D.P.C.
CAVITY
CLEAR
MIN. 225

155
GROUND LEVEL
150mm BELOW
LOWEST TIMBER
EXTERNAL WALL
440 x 140 x width of wall 7N/mm2 Dense
Concrete Blocks (cut to suit finished floor depth),
D.P.C.
Density 1950kg/m3 or similar approved on 15mm
300 MIN.

MIN 225mm VENTILATED VOID Mortar bedding - total 155mm upstand. 155mm
TO SUIT GROUND CONDITIONS. concrete upstand can also be used with a GEN1
mix.' N.B. If the block wall overhangs the cavity,
the erectors must ensure the DPC is lapped over
the outside face of the coursing block to stop
water ponding on top of the overhang. It is
possible that to avoid this the block could be
1000 MINIMUM

flush with the floor and frame (cavity side), but a


Building Inspector may query the internal cold
bridge - this should be checked with your
NOT A BRICK COURSE

Building Control and / or Insurance Inspector


(NHBC etc.)

450/600 x MINIMUM DEPTH AS SHOWN ON MASS


CONCRETE FOUNDATIONS TAKEN DOWN TO BEAR INTO
VIRGIN SUITABLE STRATUM. FOUNDATIONS ALSO TO
BE TAKEN DOWN MIN. 300 BELOW ANY ROOT
PRESENCE.

FOR FOUNDATION SETTING OUT REFER TO FOUNDATION LOCATION PLAN


THIS DRAWING SHOWS TRADITIONAL TRENCH FILL FOUNDATIONS AND IS NOT SITE SPECIFIC. ALL GROUND
FLOORS & FOUNDATION DEPTHS/DESIGN TO BE APPROVED BY THE LOCAL BUILDING INSPECTOR AND TO SUIT
LOCAL GROUND CONDITIONS.
THIS DRAWINGS IS TO BE READ IN CONJUNCTION WITH THE BUILDING REGULATIONS NOTES AND DRAWINGS.
HOUSE SETTING OUT RELIES ON F.F.L [Finished Floor Level] = EXTERNAL D.P.C. LEVEL.
TOP OF SOLEPLATE MAY REQUIRE CUTTING OUT AT INTERNAL AND EXTERNAL DOOR POSITIONS.
NO BRICKWORK IS TO BE CONSTRUCTED BELOW DPC LEVEL (TO EXTERNAL CAVITY SKIN) UNTIL AFTER THE
TIMBER FRAME HAS BEEN ERECTED (TO ENSURE THAT A NOMINAL 50mm CAVITY IS MAINTAINED BETWEEN
TIMBER FRAME AND OUTER SKIN).

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


ISSUE 9

DPC RELATIONSHIP WITH


CM111

2014

SCREEDED FLOOR
FOR PLASTERBOARD
AUSTENITIC STAINLESS STEEL SPECIFICATION REFER TO
HOLDING DOWN STRAPS DRAWING CM510
SUPPLIED BY Sips Eco Panels
AND FIXED BY BRICKWORK
CONTRACTOR TO Sips Eco SIP PANEL WITH 500g
Panels BY 6no. 50x3.35mm SS POLYTHENE VAPOUR
ANNULAR RINGSHANK NAILS AT CONTROL LAYER FIXED
CORNERS, SIDES OF OPENINGS TO PANEL. SEE CM5
AND AT 1200c/c MAX. STRAPS TO
BE SET INTO LEAN MIX
CONCRETE WHERE POSSIBLE.
SIMILAR APPROVED BY
SUPPLIER MAY BE USED.

D.P.C.
MIN. 225

GROUND LEVEL
TO D.P.C.

150mm BELOW
LOWEST TIMBER
MIN.150

STRUCTURAL SLAB TYPE


AND DESIGN MAY VARY

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


ISSUE 9

RESTRAINT STRAP
CM112

2014

FIXING TYPE 1
EXTERNAL SKIN SHOWN
INDICATIVE. DETAILED
AND SUPPLIED BY OTHERS.

SIPS WALL PANEL ON


20mm SOLE PLATE.
U/S OF SOLEPLATE MUST
BE LEVEL WITH F.F.L.

DPC

FLOOR BUILD UP BY OTHERS


FFL
MIN.150

7N
DENSE DPM LAPPED
GROUND LEVEL BLOCK UNDER DPC

75mm x 75mm x 10mm


SQUARE WASHER -
WASHER MUST BE TIGHT
AGAINST VERTICAL FACE
FISCHER FBS 6 CONCRETE
OF STRAP
SCREW OR EQUAL AND
APPROVED TO GIVE SAFE
WORKING UPLIFT FORCE

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


CM112.1

ISSUE 9

RESTRAINT STRAP
2014

FIXING TYPE 2
STEELWORK TO BE BLAST CLEANED
AND FINISHED IN 75 MICRON ZINC
PHOSPHATE PRIMER. WIND PORTAL
LOCATED AT GROUND FLOOR ONLY.

100

50
100 50 120 x 45 TIMBER FIXED TO
STEEL POST USING M12

50
BOLTS AT 600c/c.

450
250

50
48

152
50

600

152 x 152 UC CONNECTED 145 x 20 TIMBER FIXED TO


TO BASE USING 4 M16 STEEL POST (FOR
KEMFIX BOLTS OR SIMILAR CONNECTION OF DOORS
ETC.) USING SELF DRILLING
SELF TAPPING SCREWS (BY
OTHERS)

BASE DETAIL PLAN ON POST

25mm MAX. FLOOR JOIST STEELWORK ENCASED IN 19mm


F.F.L. GROUT FIRELINE PLASTERBOARD OR
D.P.C.
SIMILAR WITH 5mm SKIM
D.P.C.
250
MIN. 225

CAVITY
CLEAR

NOMINAL

100
300

48

100 DOOR
OPENING PROVIDE INSULATION TO
PREVENT COLD BRIDGING

145 x 20 TIMBER FIXED TO


STEEL BEAM (FOR
REINFORCEMENT DESIGNED BY CONNECTION OF DOORS ETC.)
FOUNDATION ENGINEER. USING SELF DRILLING SELF
TAPPING SCREWS (BY OTHERS)

SECTION THROUGH BASE SECTION THROUGH


CROSS BEAM
READ IN CONJUNCTION WITH CM5. REFER TO STRUCTURAL
ENGINEER'S CALCULATIONS FOR FOUNDATION DESIGN.
Work to written dimensions only. DO NOT SCALE. If in doubt ask.
ISSUE 9

WIND PORTAL
CM113

2014

FOUNDATION DETAIL
EXPANDED POLYSTYRENE
INSULATING CORE.
11mm THICK
OSB OUTER
SKIN WITH
BREATHER
PAPER
EXTERNALLY.

45mm
TREATED SW
BOTTOM
PLATE

PANEL SECURED USING


35mm x 3.9mm COARSE
THREAD BLACK
PHOSPHATE SCREWS
OR (BZP) BRIGHT ZINC
PLATED FINISH AT 200c/c
AND 50mm FROM END.

45mm TREATED SW
SOLEPLATE

DAMP PROOF COURSE

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


ISSUE 9
CM114

2014

SOLEPLATE FIXING
INTERNAL
440 x 140 x width of wall
7N/mm2 Dense Concrete
Blocks, Density
1950kg/m3 or similar
approved on 15mm Mortar
STUD WALL bedding - total 155mm
upstand. 155mm concrete
upstand can also be used
PLASTERBOARD with a GEN1 mix.'

SKIRTING BOARD
RIGID INSULATION
DPC/DPM LAPPED
SAND AND CEMENT

DPC DPM
(OVERLAPS DPM)

AIR
BRICK

HARDCORE

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


ISSUE 9

JUNCTION OF INTERNAL
CM115

2014

LOADBEARING WALL
FOUNDATIONS
OPEN PERPENDS AT MAX.

55 APPROX.
1500mm C/C FOR DRAINAGE
AND VENTILATION OF CAVITY. TIMBER FRAME LINTOL. (NOT
PROVIDE A MINIMUM OF 2 IN SUPPLIED-CATNIC CTF5 OR
ALL CASES SIMILAR).
PROVIDE CAVITY TRAY
ABOVE TUCKED BEHIND
BREATHER MEMBRANE AND
LAPPED
MAKE UP OR PACKER FITTED
IN JOINERY FACTORY IN
ORDER TO MAKE FRAME
UPTO 2100mm.

2155 approx
15 MAX.

20
F.F.L./COMMON
75 max D.P.C. LEVEL
OVERHANG
RAMP

MAXIMUM LEVEL (150mm


BELOW COMMON DPC) OF
GROUND LEVEL EITHER SIDE
OF RAMP.
50

MOBILITY DOOR CILL TO


HAVE ITS OWN DPC LAPPED
INTO COMMON DPC.

OPEN PERPENDS AT MAX.


1500mm C/C FOR DRAINAGE ENSURE THAT DPM IS NOT
PERFORATED OR DAMAGED
AND VENTILATION OF CAVITY.
AND IS ADEQUATELY LAPPED
WITH DPC.
VENTED DRAINAGE CHANNEL
50 x 50 BATTEN WRAPPED IN
MIN.135 DEEP
DPC. MIN. 75mm ABOVE
DRAINAGE CHANNEL

NOTE: DPC LEVEL LOCALLY STEPPED DOWN AT


MOBILITY DOOR THRESHOLD POSITION.
Work to written dimensions only. DO NOT SCALE. If in doubt ask.
ISSUE 9

MOBILITY DOOR FRAME


CM116

2014

AND SCREED
TIMBER FRAME LINTOL. (NOT
OPEN PERPENDS AT MAX. SUPPLIED-CATNIC CTF5 OR

55 APPROX.
1500mm C/C FOR DRAINAGE SIMILAR) USE AS CAVITY
AND VENTILATION OF CAVITY. TRAY OR PROVIDE ONE
PROVIDE A MINIMUM OF 2 IN ABOVE TUCKED BEHIND
ALL CASES BREATHER MEMBRANE

OPEN PERPENDS FOR


DRAINAGE AND VENTILATION

MAKE UP OR PACKER FITTED


IN JOINERY FACTORY IN
ORDER TO MAKE FRAME
UPTO 2100mm.

2155 approx
15 MAX.

CHIPBOARD ON VAPOUR
CONTROL LAYER ON
INSULATION
20
75 max
F.F.L.
OVERHANG
RAMP

MAXIMUM LEVEL (150mm


BELOW COMMON DPC) OF
GROUND LEVEL EITHER SIDE
OF RAMP.
50

MOBILITY DOOR CILL TO


HAVE ITS OWN DPC LAPPED
INTO COMMON DPC.

50 x 50 TIMBER BATTEN
WRAPPED IN DPC
PREVENTING COLD BRIDGING
OPEN PERPENDS AT MAX.
1500mm C/C FOR DRAINAGE
AND VENTILATION OF CAVITY.
ENSURE THAT DPM IS NOT
PERFORATED OR DAMAGED
VENTED DRAINAGE CHANNEL 50 x 50 BATTEN MIN. 75mm AND IS ADEQUATELY LAPPED
MIN.135 DEEP ABOVE DRAINAGE CHANNEL WITH DPC.

NOTE: DPC LEVEL LOCALLY STEPPED DOWN AT


MOBILITY DOOR THRESHOLD POSITION.
Work to written dimensions only. DO NOT SCALE. If in doubt ask.
ISSUE 9

MOBILITY DOOR FRAME


CM117

2014

AND CHIPBOARD
Sips Eco Panel

GLASS FIBRE INSULATION

CEILING TIE

.
HELIFIX TIMTIE 6
OR STAINLESS VAPOUR CONTROL
STEEL SIMPSON LAYER (VCL
STRONGTIE SWT50 SUPPLIED. FITTED BY
TIMBER FRAME OTHERS)
WALL TIE
50 x 50 BATTEN

SIPs ECO PANEL


REFER TO CM5

THIS DETAIL TO BE EMPLOYED WHEN TRUSSED


RAFTERS ARE INSTALLED AS A COLD ROOF SYSTEM.
NOT FOR HABITABLE LOFT AREAS. REFER TO
RELEVANT STRUCTURAL CALCULATIONS AND PANEL
DRAWINGS FOR SPECIFIC SITE. READ IN CONJUNCTION
WITH CM5. PLASTERBOARD DETAILS OMITTED FOR
CLARITY. REFER TO CM44 FOR SPECIFICATION.

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


ISSUE 9

EXTERNAL WALL AND


CM210

2014

TRUSS ROOF CEILING:


GABLE END
HELIFIX TIMTIE 6
OR STAINLESS
Sips Eco Panel STEEL SIMPSON
STRONGTIE SWT50
BATTENS TIMBER FRAME
ON VCL WALL TIES

PLASTERBOARD -
REFER TO CM510
FOR SPECIFICATION.
SERVICE VOID

SKIRTING BOARD

FLOOR DECKING

RIM BEAM

BREATHER
MEMBRANE LAPPED
TOP AND BOTTOM
I-BEAM AND OVER RIM BEAM
SOUND INSULATION PLASTERBOARD
NOGGING
FACE OR TOP MOUNTED
HANGERS TO BE USED 120 HEAD BINDER
WHERE SPECIFIED

PLASTERBOARD BREATHER
MEMBRANE
VERTICAL
VAPOUR
BATTEN ON VCL
CONTROL LAYER
Sips Eco Panel SUPPLIED. FITTED BY
REFER TO CM5 OTHERS
READ IN CONJUNCTION
ELEVATION WITH CM5
Work to written dimensions only. DO NOT SCALE. If in doubt ask.
ISSUE 9
CM211

2014

RIM BEAM
PLASTERBOARD ON
BATTENS. REFER TO
CM510 FOR
SPECIFICATION
BREATHER
MEMBRANE

VAPOUR CONTROL
LAYER AS REQUIRED.
REFER TO CM5

95x45 STUD

Sips Eco Panel


REFER TO CM5

PLASTERBOARD

HELIFIX TIMTIE 6
OR STAINLESS
STEEL SIMPSON
STRONGTIE
SWT50 TIMBER
FRAME WALL
TIES

READ IN CONJUNCTION
PLAN WITH CM5
Work to written dimensions only. DO NOT SCALE. If in doubt ask.
ISSUE 9

JUNCTION OF EXTERNAL
CM212

2014

AND INTERNAL WALL


BREATHER MEMBRANE

DOOR FRAME SET BACK


30mm FROM EDGE OF
BATTEN.

HELIFIX TIMTIE 6 OR
30
STAINLESS STEEL
SIMPSON
STRONGTIE SWT50
TIMBER FRAME
WALL TIES AT JAMB
TO BE SPACED AT
SERVICE VOID 225 c/c VERTICALLY

SEALANT
PLASTERBOARD & VCL TIMBER JAMB
CONTINUES AROUND
JAMB. REFER TO CM311
FOR SPECIFICATION
CAVITY BARRIER NAILED
TO JAMB STUDS AND
FITTED WITH DPC

DOOR AND WINDOW FIXED TO


FRAME USING WINDOW
CRAMPS. SPACE CRAMPS AT CILL
600c/c AND EQUAL DISTANCE
FROM ENDS.

PLAN

REFER TO CM311 FOR MOVEMENT CONTROL

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


ISSUE 9

DOOR/WINDOW
CM213

2014

FIXING 1
HELIFIX TIMTIE 6 OR
STAINLESS STEEL TIMBER
FRAME WALL TIES AT
JAMB TO BE SPACED AT
225 c/c VERTICALLY

WINDOW FIXED TO FRAME


USING WINDOW CRAMPS
NAILED TO BATTENS AND
FRAME. SPACE CRAMPS
AT 600c/c AND EQUAL
DISTANCE FROM ENDS.
ALLOWANCE FOR
TIMBER WINDOW CILL

.
TIMBER WINDOW BOARD DIFFERENTIAL
MOVEMENT
REFER TO CM522 FOR
MOVEMENT CONTROL
SEALANT

CANT CILL BRICK TO BE


USED WHERE REQUIRED
FOR SHORT CILLS.

D.P.C. DRESSED INTO


RECESS IN FRAME AND

SECTION SECTION THROUGH WINDOW CILL


STAPLE FIX TO BATTEN
LAP WITH VCL.
TIMBER FRAME LINTOL.
(NOT SUPPLIED-CATNIC
CTF5 OR SIMILAR) USE AS
CAVITY TRAY OR PROVIDE
30 ONE ABOVE TUCKED
BEHIND BREATHER
MEMBRANE

PLASTERBOARD & VCL


CONTINUES AROUND SEALANT
JAMB. REFER TO CM311 TIMBER JAMB
FOR SPECIFICATION
CAVITY BARRIER NAILED
TO JAMB STUDS AND
FITTED WITH DPC

ELEVATION

REFER TO CM311 FOR MOVEMENT CONTROL


Work to written dimensions only. DO NOT SCALE. If in doubt ask.
ISSUE 9

DOOR/WINDOW
CM214

2014

FIXING 2
SAFETY PRECAUTIONS

UPVC WINDOWS CAN BE VERY HEAVY. LIFTING OF FRAMES TO BE DONE IN THE


APPROPRIATE MANNER AS TO AVOID STRAIN AND RESULTING INJURIES. IF A FRAME IS
HEAVY GET SOMEONE ELSE TO HELP WITH LIFTING IT.
ALWAYS WEAR THICK HAND PROTECTING GLOVES WHEN HANDLING GLASS OR GLAZING
UNITS. BE EXTREMELY CAREFUL WHEN MOVING FRAMES ABOUT.
IF ANY LADDERS ARE USED ENSURE THAT THEY ARE SOUND AND USED PROPERLY AND
SECURELY FASTENED. IF WORKING AT FIRST FLOOR LEVEL & HIGHER THE USE OF STAGING
PLATFORMS IS SAFER THAN LADDERS.
TO PREVENT POSSIBLE ALLERGIC REACTION TO MASTIC WEAR SUITABLE RUBBER GLOVES
WHEN HANDLING OR TOUCHING MASTIC, ALWAYS ADHERE TO MANUFACTURERS
INSTRUCTIONS.

HANDLING OF uPVC FRAMES.

FRAMES TO BE CARRIED AS NEAR TO VERTICAL AS POSSIBLE. THEY SHOULD BE HANDLED


FROM THE ENDS AND AS CLOSE TO THE TOP AS POSSIBLE. THIS IS MOST ESSENTIAL WHEN
THE UNITS ARE READY GLAZED BECAUSE THE EXTRA GLASS WEIGHT WILL GREATER
DEFLECTIONS.
HORIZONTAL LIFTING CAN CREATE SUFFICIENT TWIST IN THE FRAME TO CAUSE GLAZING
SEAL MOVEMENT, AND THUS WATER PENETRATION CAN OCCUR IF THIS IS NOT RECTIFIED
WHEN FIXING. IN THE WORST CASES, WITH LARGE GLAZED WINDOWS, GLASS BREAKAGE
CAN OCCUR BY POOR HANDLING.
IT SHOULD BE NOTED THAT DISTORTION IS NOT A PERMANENT FEATURE OF MISHANDLING
AND CAN BE RECTIFIED SIMPLY DURING THE FIXING OPERATION.
FOR WINDOWS ABOVE GROUND FLOOR LEVEL IT MAY BE NECESSARY TO USE SPECIALIST
LIFTING EQUIPMENT FOR HEAVY FRAMES.

PREPARATION OF THE FRAME.

1. IF FIXING BRACKETS ARE TO BE USED, THEN THESE SHOULD NOW BE FIRMLY ATTACHED
TO THE OUTER FRAME, STARTING NO LESS THAN 150mm MINIMUM FROM THE CORNERS
AND NO MORE THAN 600mm APART.

2. IF IT IS REQUIRED TO SCREW THROUGH THE MAIN OUTER FRAME INTO THE STRUCTURE,
THEN THE GLASS IN THE APPROPRIATE FIXED LIGHTS MUST BE REMOVED. REFER TO
SUPPLIER'S INSTRUCTIONS.

3. IF A SILL IS REQUIRED AND HAD BEEN SUPPLIED SEPARATELY FROM THE WINDOW, THEN
IT MUST NOW BE ATTACHED IN ACCORDANCE WITH THE MANUFACTURERS INSTRUCTIONS.
IF THE SILL IS TO BE FIXED TO THE WINDOW FRAME WITH SCREWS, ALWAYS SCREW FROM
THE UNDERSIDE OF THE SILL INTO THE FRAME. IT IS IMPORTANT THAT THE FIXING SYSTEMS
DO NOT PENETRATE DRAINAGE CHANNELS. (SEE MANUFACTURERS SEPARATE
INSTRUCTIONS).

4. IF THE WINDOW IS TOO HEAVY FOR CONVENIENT HANDLING, THE GLASS UNITS MAY HAVE
TO BE REMOVED (SEE SUPPLIERS INSTRUCTIONS) OR IN THE CASE OF AN INWARD OPENING
TILT AND TURN WINDOW, IT MAY BE MORE CONVENIENT TO REMOVE THE SASH OR SASHES.
(SEE SUPPLIERS INSTRUCTIONS). ONCE THE SASH HAS BEEN REMOVED, DO NOT ALTER
THE POSITION OF THE OPERATING HANDLE UNTIL THE SASH HAS BEEN REFITTED.

5. STORE ANY GLASS OR SASH YOU HAVE REMOVED SAFELY AWAY FROM WHERE YOU ARE
WORKING.

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


ISSUE 9

INSTALLATION OF uPVC
CM215

2014

WINDOWS SHEET ONE


FITTING LOCATING SILL.

1. THE TONGUE OF THE SILL LOCATES IN THE OUTER FRAME GROOVE, THE EXCESS SPRUE
OF THE WELD MUST BE CLEARED OUT SO THE SILL FITS FLUSH WITH THE WINDOW FRAME.

2. A THIN LINE OF SILICON SHOULD BE APPLIED TO THE BOTTOM RAIL OF THE WINDOW
BEFORE THE SILL IS APPLIED.

3. AT THE END OF THE WINDOW AND SILL, SILICON SHOULD BE APPLIED TO BLOCK OFF ANY
WATER PENETRATION CAUSED THROUGH CAPILLARY ACTION. (APPROX. 8mm IN)

4. END CAPS SHOULD NOW BE FITTED USING EITHER CONTACT GLUE OR CONTACT CEMENT.

INSTALLATION.

1. CHECK THAT THE FRAME WILL FIT INTO THE APERTURE. THERE SHOULD BE A MINIMUM
OF 10mm CLEARANCE ON BOTH HEIGHT AND WIDTH, 5mm ALL AROUND THE FRAME. CHECK
THAT THE DPC HAS BEEN INSTALLED & IS NOT DAMAGED.

2. OFFER THE WINDOW INTO THE APERTURE, BEDDING IN THE MANNER RECOMMENDED BY
THE SYSTEM SUPPLIER, TEMPORARILY WEDGING IT INTO POSITION MAKING SURE ITS LEVEL
& PLUMB.

3. FIX THE WINDOW INTO THE APERTURE USING EITHER FIXING BRACKETS OR BY DRILLING
AND SCREWING THE OUTER FRAME, SCREW HOLES SHOULD BE NO LESS THAN 150mm
FROM THE CORNERS AND AT NO MORE THAN 600mm CENTRES. IF IT IS NECESSARY TO
SCREW THROUGH THE BOTTOM MEMBER OF THE OUTER FRAME, (WHERE WATER CAN
COLLECT) THEN ADEQUATE SEALING SHOULD BE APPLIED. IF A FIXING IS REQUIRED ALONG
THE BOTTOM MEMBER IT IS PREFERABLE TO USE BRACKETS.

4. INSERT EXPANDING PLUGS AND SCREW HOME FIRMLY. CHECK BY MEASUREMENT THAT
THE ACTION OF TIGHTENED SCREWS HAS NOT DISTORTED THE FRAME. CHECK THAT ALL
OPENING WINDOWS FUNCTION CORRECTLY AND THE HANDLES DO NOT FOUL THE FRAME.
CHECK THAT THE DRAIN PLUGS ARE NOT DAMAGED OR BLOCKED.

5. REFIT SASH OR SASHES THAT WERE REMOVED.

6. CHECK THE WINDOW FOR CORRECT OPERATION BEFORE PROCEEDING WITH THE MASTIC
SEAL OR MAKING GOOD.

ADJUSTMENT OF HINGES.

NORMALLY THE HINGES ARE ADJUSTED ON GLAZED UNITS BEFORE LEAVING THE FACTORY,
BUT IN SOME CASES ADJUSTMENT ON SITE MAY BE NECESSARY.
THIS IS DONE BY TURNING THE SMALL BRASS ADJUSTING SCREW CLOCKWISE TO INCREASE
THE FRICTION. THIS MUST BE DONE GRADUALLY IN SMALL INCREMENTS AND EVENLY ON
BOTH SIDES TO AVOID TWISTING THE FRAME DURING THE OPERATION.
THE FRICTION SHOULD BE ADJUSTED UNTIL THE OPENING LIGHT WILL REMAIN FIXED IN ANY
OPEN POSITION.

CLEANING OF uPVC WINDOWS

TO KEEP THE WINDOW FRAMES IN GOOD CONDITION THEY SHOULD BE WASHED DOWN
REGULARLY WITH A WEAK HOUSEHOLD DETERGENT SOLUTION. FOR STUBBORN GREASY
STAINS USE A SPOT OF WHITE SPIRIT OR METHYLATED SPIRITS ON A CLEAN CLOTH. IN
DIFFICULT CORNERS AN OLD TOOTHBRUSH OR NAIL BRUSH MAY BE USED.

DO NOT USE ABRASIVE CLEANING POWDERS, WIRE WOOL OR AMMONIA BASED CLEANING
AGENTS.
Work to written dimensions only. DO NOT SCALE. If in doubt ask.
ISSUE 9

INSTALLATION OF uPVC
CM216

2014

WINDOWS SHEET TWO


EFFECTIVE EDGE SEALING TO PARTY WALLS
THE CURRENT BUILDING REGULATIONS UNDER APPROVE DOCUMENT L
REQUIRES THAT THE CAVITY IS SEALED AND THAT THE SEALING IS
EFFECTIVE AT RESTRICTING AIR FLOW AND ALSO ALIGNED WITH THE
THERMAL ENVELOPE. IT WILL ALSO BE NECESSARY TO DEMONSTRATE
THAT THE DESIGN ADOPTED IS LIKELY TO BE ROBUST UNDER NORMAL
SITE CONDITIONS. THE EDGE OF THE PARTY WALL CAVITY SHOULD BE
CLOSED WITH A MINERAL WOOL BATT AND POLYTHENE SLEEVED MINERAL
WOOL CAVITY BARRIERS TO EITHER SIDE OF THE PARTY WALL IN THE
EXTERNAL WALL CAVITY. REFER TO DETAIL ON SHEET E5. THE DETAIL ON
THE FOLLOWING SHEETS CM217.2 AND CM217.3 SHOWS A REASONABLY
ROBUST LEVEL OF SEALING.

AT THE JUNCTION OF THE PARTY WALL AND EXTERNAL WALL CAVITY, THE
EDGE OF THE PARTY WALL IS STOPPED WITH EITHER WIRE
REINFORCED MINERAL WOOL, OR A POLYTHENE SLEEVED MINERAL
WOOL CAVITY BARRIER. TYPICALLY ONE WIDE OR TWO NARROW CAVITY
BARRIERS ARE INSTALLED IN THE EXTERNAL WALL CAVITY EITHER SIDE
OF THE PARTY WALL CAVITY. THESE ARRANGEMENTS OF CAVITY
BARRIERS FIRMLY COMPRESSED AND FITTED CORRECTLY SHOULD ALSO
ADD TO THE ROBUSTNESS AND EFFECTIVENESS OF THE AIR SEAL.

THE TOP AND BOTTOM OF THE PARTY WALL CAVITIES CAN ALSO BE
CLOSED USING A SIMILAR ARRANGEMENT OF AIR BARRIERS. ONCE THE
GROUND FLOOR SOLE PLATES ARE LAID, A 300 MM WIDE STRIP OF AIR
BARRIER 1 CAN BE PLACED OVER THE SOLE PLATES AND PARTY WALL
CAVITY BEFORE THE PARTY WALL PANELS ARE ERECTED. THIS AIR
BARRIER CAN ALSO BE EXTENDED OUT PAST THE END OF THE PARTY
WALL, 2 RETURNED UP THE FACE OF THE EXTERNAL WALL AND LAPPED
AND SEALED TO THE EXTERNAL WALL BREATHER MEMBRANE OR AIR
BARRIER 3 ENSURING ALL LAPS DEFLECT MOISTURE AWAY FROM THE
SIPS FRAME AT THE TOP OF THE PARTY WALL (EITHER AT EACH FLOOR
ZONE, OR AT TOP FLOOR CEILING LEVEL) A SIMILAR ARRANGEMENT OF
AIR BARRIERS COULD BE INSTALLED BEFORE THE SPANDREL PANELS ARE
ERECTED. ANY JOINTS IN THE AIR BARRIERS SHOULD BE LAPPED, TAPED
AND WHERE POSSIBLE MECHANICALLY FIXED.

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


CM217.1

ISSUE 9

PARTY WALL
2014

EDGE SEALING DETAIL 1


AIR
BARRIER

SOLEPLATE

SLAB

EXTERNAL
SIP PANEL

HIGH PERFORMANCE BREATHER

2 MEMBRANE LAP LEFT LOOSE

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


CM217.2

ISSUE 9

PARTY WALL
2014

EDGE SEALING DETAIL 2


BREATHER
MEMBRANE
ON SIP PANEL

AIR BARRIER RETURNED UP THE OUTER


FACE OF FRAME BEFORE BREATHER
MEMBRANE IS LAPPED AND SEALED
WITH PROPRIETARY TAPE

BREATHER
MEMBRANE LAPPED AND SEALED
3 WITH PROPRIETARY TAPE

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


CM217.3

ISSUE 9

PARTY WALL
2014

EDGE SEALING DETAIL 3


PAS90 NAILS 35mm SCREWS FIXING PANELS TO TOP
FIXING 45 x95 AND BOTTOM PATES & REBATED
TO 45x120 @ CRIPPLE STUDS @ 150mm c/c (STARTING
200 c/c 50mm IN FROM EACH END)
TOP RAIL

SIP LINTEL

SIP
PANELS

LINTEL

THE INNER TIMBER ON BOTH


SIDES IS TO BE LEFT ON SITE
AND NOT FIXED. THIS IS FOR
CLIENT'S USE IF TIMBER DOOR
FRAMES ARE USED. THEY ARE
OMITTED IF uPVC DOOR FRAME
IS USED. THEY ARE NOT
SUPPLIED FOR OTHER DOORS.

1020

BOTTOM RAIL

ELEVATION

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


ISSUE 9

EXTERNAL SINGLE
CM218

2014

DOOR OPENING
BREATHER MEMBRANE

TREATED BATTENS FIXED TO PANEL


USING 3mm WOODSCREWS AT
600mm c/c
HORIZONTAL BATTENS, IF
REQUIRED, SHOULD PROVIDE
FOR VENTILATION AND
DRAINAGE. TOPS OF BATTENS
SHOULD ALSO SLOPE TOWARDS
THE OUTSIDE.

3mm SS WOODSCREWS AT
600mm c/c

MIN. OVERLAP 25mm

BOARD JOINTS MUST


OCCUR AT BATTENS

WEATHER BOARDING CAN BE APPLIED TO EXTERNAL MASONRY SKIN OF A


CAVITY WALL OR AS SHOWN ABOVE FOR SINGLE OR TWO STOREY
CONSTRUCTION.
ADDITIONAL COUNTER BATTENS MAY BE NECESSARY BETWEEN THE
VERTICAL BATTENS AND THE BREATHER MEMBRANE IN SEVERELY EXPOSED
AREAS TO PERMIT MORE EFFICIENT DRAINAGE OF ANY WATER.
ADDITIONAL BATTEN MAY ALSO BE REQUIRED TO ALLOW CLADDING TO LINE
THROUGH WITH BRICKWORK BELOW.
TO AVOID INFESTATION BY INSECTS, OPENINGS TO THE CAVITY SHOULD BE
PROTECTED BY AN INSECT SCREEN.
Work to written dimensions only. DO NOT SCALE. If in doubt ask.
ISSUE 9
CM219

2014

CLADDING - TIMBER
BREATHER
MEMBRANE

TREATED BATTENS FIXED TO


PANEL USING 3mm SS
WOODSCREWS AT 600mm c/c.
HORIZONTAL BATTENS SHOULD
PROVIDE FOR VENTILATION AND
DRAINAGE. TOPS OF BATTENS
SHOULD ALSO SLOPE TOWARDS
THE OUTSIDE.

DPC

BACKED METAL LATHE

DRAINED AND VENTILATED


CAVITY

CEMENT RENDER USUALLY IN


THREE COATS

RENDER CAN BE APPLIED TO EXTERNAL MASONRY SKIN OF A CAVITY WALL


OR AS SHOWN ABOVE FOR SINGLE OR TWO STOREY CONSTRUCTION.
BATTENS TO BE MINIMUM 50mm UNLESS BUILDING PAPER BACKED
LATHE IS USED, IN WHICH CASE BATTENS MAY BE REDUCED TO 25mm.
ADDITIONAL HORIZONTAL COUNTER BATTENS MAY BE NECESSARY
BETWEEN THE VERTICAL BATTENS AND THE BREATHER MEMBRANE
IN SEVERELY EXPOSED AREAS TO PERMIT MORE EFFICIENT
DRAINAGE OF ANY WATER.
ADDITIONAL BATTEN MAY ALSO BE REQUIRED TO ALLOW CLADDING TO LINE
THROUGH WITH BRICKWORK BELOW.
TO AVOID INFESTATION BY INSECTS, OPENINGS TO THE CAVITY SHOULD BE
PROTECTED BY AN INSECT SCREEN.

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


ISSUE 9

CLADDING - RENDER
CM220

2014

SHEET 1
TREATED BATTENS FIXED TO PANEL
PROTECTED BY INSECT SCREEN.
HORIZONTAL BATTENS SHOULD
PROVIDE FOR VENTILATION AND
DRAINAGE. TOPS OF BATTENS
SHOULD ALSO SLOPE TOWARDS
THE OUTSIDE.

PROPRIETARY INTUMESCENT STRIP


WITH DRAINAGE AND VENTILATION
GRID

PROPRIETARY METAL RENDER


STOPS

MOVEMENT JOINT.
REFER TO CM32

3mm SS
WOODSCREWS
AT 600mm c/c

POLYTHENE DPC TO
FACE OF BATTENS
AND DRESSED UP
BEHIND BREATHER
MEMBRANE

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


ISSUE 9

CLADDING - RENDER
CM221

2014

ALLOWANCE FOR
MOVEMENT
BREATHER MEMBRANE

TREATED BATTENS FIXED TO


PANEL. VERTICAL BATTENS
SHOULD PROVIDE FOR
VENTILATION AND DRAINAGE IF
REQUIRED. TOPS OF BATTENS
SHOULD ALSO SLOPE TOWARDS
THE OUTSIDE.
25mm BATTENS FIXED WITH 3mm
SS WOODSCREWS AT 600mm c/c
12mm COUNTER BATTENS FIXED
WITH 3mm SS WOODSCREWS AT
600mm c/c IF REQUIRED.

PLAIN TILES

TILE HANGING CAN BE APPLIED TO EXTERNAL MASONRY SKIN


OF A CAVITY WALL OR AS SHOWN ABOVE FOR SINGLE OR TWO
STOREY CONSTRUCTION.
ADDITIONAL VERTICAL COUNTER BATTENS MAY BE NECESSARY
BETWEEN THE HORIZONTAL BATTENS AND THE BREATHER MEMBRANE
IN SEVERELY EXPOSED AREAS TO PERMIT MORE EFFICIENT DRAINAGE
OF ANY WATER.

ADDITIONAL BATTEN MAY ALSO BE REQUIRED TO ALLOW CLADDING


TO LINE THROUGH WITH BRICKWORK BELOW.
TO AVOID INFESTATION BY INSECTS, OPENINGS TO THE CAVITY
SHOULD BE PROTECTED BY AN INSECT SCREEN.

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


ISSUE 9

CLADDING -
CM222

2014

TILE HANGING
WALL TIE
Sips Eco Panel

PLASTERBOARD
ON BATTENS

VAPOUR CONTROL
LAYER

Sips Eco Panel

BREATHER
MEMBRANE

READ IN CONJUNCTION WITH CM5. PLASTERBOARD DETAILS


PLAN
OMITTED FOR CLARITY. REFER TO CM510 FOR SPECIFICATION
Work to written dimensions only. DO NOT SCALE. If in doubt ask.
ISSUE 9

EXTERNAL WALL
CM223

2014

CORNER
FIXING OF
PLASTERBOARD PLASTERBOARD. REFER TO
CEILING CM510 FOR SPECIFICATION
NOGGINGS AT
ALL JOINTS AT
600mm c/c

45

45

INSULATED SPLINE JOINING 2


PANELS TOGETHER. THIS
COULD ALSO BE SOLID
TIMBER. FIXED USING 35mm
SCREWS @ 150mm c/c
(STARTING 50mm FROM END
OF PANEL)

PANEL TO PANEL JUNCTION

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


ISSUE 9

NOGGINGS AND PANEL


CM310

2014

CONNECTION
SERVICE VOID
FOR ELECTRICS
AND PLUMBING

VAPOUR BARRIER
V.C.L. SEE CM5

SOFTWOOD BATTENS AT 600mm c/c


ON VAPOUR BARRIER ON Sips Eco
Panel. IDEAL SIZE FOR BATTENS IS
25mm x 25mm BUT THEY CAN BE
PLASTERBOARD SMALLER SUBJECT TO FIRST FIX
SEE CM510 SERVICES.

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


ISSUE 9

PLASTERBOARD
CM311

2014

FIXING DETAIL
22mm CHIPBOARD FLOOR (WEYROC
PROTECT OR SIMILAR TO ACHIEVE
15kg/m2) DECKING ON TJI OR ULTRA
JOISTS AT MAXIMUM 600mm c/c.

15mm PLASTERBOARD. REFER 100mm GLASSFIBRE


TO CM510 FOR SPECIFICATION INSULATION QUILT. [ISOVER
APR 1200 OR SIMILAR
APPROVED]. HUNG USING
NETTING IF REQUIRED.

IT IS POSSIBLE TO DRILL HOLES THROUGH THE TJI FLOOR JOISTS BUT


APPROVAL MUST BE GIVEN BY Sips Eco Panels. GENERALLY A HOLE OF UP TO
38mm CAN BE DRILLED ANYWHERE IN THE WEB, HOWEVER THERE SHOULD BE
A GAP OF AT LEAST 2 x DIAMETER OF LARGEST HOLE BETWEEN HOLES. ANY
HOLES BIGGER THAN 38mm MUST BE APPROVED BY Sips Eco Panels.

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


ISSUE 9

MID FLOOR
CM312

2014

SOUND INSULATION
THESE DETAILS ARE FOR A WALL
SEPARATING A ROOM WITH A W.C. OR
A BEDROOM FROM ANOTHER ROOM.

25mm ISOWOOL ACOUSTIC PARTITION ROLL [1200] IN


THE CAVITY

45mm x 95mm STUDS AT 600mm c/c NOMINALLY

BUILDING REGULATIONS PART E - RESISTANCE TO THE PASSAGE OF SOUND

DWELLING HOUSES SHALL BE DESIGNED AND CONSTRUCTED SO THAT


INTERNAL ROOMS BETWEEN BEDROOMS OR A ROOM CONTAINING A WATER
CLOSET [W.C.] AND OTHER ROOMS AND INTERNAL FLOORS PROVIDE
REASONABLE RESISTANCE TO THE PASSAGE OF SOUND.

HOWEVER, THIS DOES NOT APPLY TO WALLS CONTAINING A DOOR OR WALLS


SEPARATING AN EN-SUITE TOILET FROM AN ASSOCIATED BEDROOM.

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


ISSUE 9
CM313

2014

SOUND INSULATION
INTERNAL WALL
RUNNING ACROSS
FLOOR JOISTS

BOTTOM RAIL
PLASTERBOARD

SKIRTING BOARD LOCATOR PLATE IF


SPECIFIED
BATTEN
FLOOR DECKING

SPAN

I-BEAM
SOUND INSULATION
HEAD BINDER

TOP RAIL
PLASTERBOARD

READ IN CONJUNCTION WITH CM5. PLASTERBOARD DETAILS


OMITTED FOR CLARITY. REFER TO CM510 FOR SPECIFICATION.

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


ISSUE 9

JUNCTION OF INTERNAL
CM314

2014

LOAD BEARING WALL


PLASTERBOARD
NOGGINGS

STUD

15mm PLASTERBOARD
FIXED USING SMOOTH
SHANK GALVANISED
FLAT ROUND HEAD
NAILS AT 150mm c/c OR
SCREWS AT 230mm c/c

PLAN
READ IN CONJUNCTION WITH CM510. REFER TO CM510 FOR
PLASTERBOARD SPECIFICATION.
Work to written dimensions only. DO NOT SCALE. If in doubt ask.
ISSUE 9

INTERNAL WALL
CM315

2014

TO WALL JUNCTION
BOTTOM RAIL
PLASTERBOARD

SKIRTING BOARD LOCATOR PLATE IF


SPECIFIED

FLOOR DECKING

SPAN

SOUND I-BEAM
INSULATION
HEAD BINDER
PLASTERBOARD
TOP RAIL

PLASTERBOARD

READ IN CONJUNCTION WITH CM5. REFER TO CM311 AND


CM510 FOR PLASTERBOARD SPECIFICATION.
Work to written dimensions only. DO NOT SCALE. If in doubt ask.
ISSUE 9

NON LOADBEARING
CM316

2014

WALL AND FLOOR


STUD

STUD CLUSTER

PLASTERBOARD

PLAN
READ IN CONJUNCTION WITH CM5. PLASTERBOARD DETAILS OMITTED FOR
CLARITY. REFER TO CM311 AND 510 FOR PLASTERBOARD SPECIFICATION.
Work to written dimensions only. DO NOT SCALE. If in doubt ask.
ISSUE 9

INTERNAL WALLS
CM317

2014

JUNCTION IN
FOUR DIRECTIONS
PLASTERBOARD
BOTTOM RAIL

SKIRTING BOARD LOCATOR PLATE IF


SPECIFIED

FLOOR DECKING NOGGING OR


BLOCKING
ACCORDING TO
I-JOIST CALCULATED
DEFLECTION

NOGGING
SOUND
HEAD BINDER
INSULATION

PLASTERBOARD TOP RAIL

READ IN CONJUNCTION WITH CM5. PLASTERBOARD DETAILS OMITTED


FOR CLARITY. REFER TO CM311 AND 510 FOR PLASTERBOARD
SPECIFICATION.
Work to written dimensions only. DO NOT SCALE. If in doubt ask.
ISSUE 9

NON LOAD BEARING


CM318

2014

WALL PARALLEL
TO JOISTS
ROOF TILES ON ROOFING
BATTENS ON 25mm
COUNTER BATTENS ON
BREATHER MEMBRANE
ON SIP ROOF PANEL

TILTING FILLET

END BLOCK

FASCIA

CAVITY CLOSER

FASCIA AND SOFFIT SOFFIT


SUPPORT MADE UP ON
SITE TO SUIT DESIGN OR
SUPPLIED WITHIN SIP
PANEL.
DIFFERENTIAL MOVEMENT
JOINT REFER TO CM522

READ IN CONJUNCTION WITH CM5. PLASTERBOARD DETAILS OMITTED FOR CLARITY. REFER
TO CM311 & 510 FOR PLASTERBOARD SPECIFICATION.
Work to written dimensions only. DO NOT SCALE. If in doubt ask.
ISSUE 9
CM410

2014

CLOSED EAVES
25mm
COUNTER
BATTEN

CAVITY CLOSER

FASCIA AND SOFFIT WINDOW FRAME. DOOR


SUPPORT MADE UP ON FRAME DETAIL SIMILAR
SITE TO SUIT DESIGN
DIFFERENTIAL MOVEMENT
JOINT REFER TO CM522

READ IN CONJUNCTION WITH CM5. PLASTERBOARD DETAILS


OMITTED FOR CLARITY. SEE ALSO CM410. REFER TO CM311 &
510 FOR PLASTERBOARD SPECIFICATION.
Work to written dimensions only. DO NOT SCALE. If in doubt ask.
ISSUE 9

CLOSED EAVES
CM411

2014

AT WINDOW HEAD
25mm
COUNTER
BATTEN

TILTING FILLET

SOFFIT PLY TO SUIT

END BLOCK

READ IN CONJUNCTION WITH CM5 AND CM410.


PLASTERBOARD DETAILS OMITTED FOR CLARITY.
REFER TO CM311 & 510 FOR PLASTERBOARD
SPECIFICATION.

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


ISSUE 9
CM412

2014

FLUSH EAVES
25mm COUNTER
BATTEN

TILTING FILLET

SOFFIT PLY TO SUIT END BLOCK

CAVITY CLOSER

DPC

READ IN CONJUNCTION WITH CM5 AND CM40. PLASTERBOARD


DETAILS OMITTED FOR CLARITY. REFER TO CM311 FOR
PLASTERBOARD SPECIFICATION.

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


ISSUE 9
CM413

2014

OPEN EAVES
DOWNSTAND BEAM TO
SUPPORT SIPS PANELS TO
ENGINEER'S
SPECIFICATIONS.

INFILL WEDGE

READ IN CONJUNCTION WITH CM5 AND CM410. PLASTERBOARD


DETAILS OMITTED FOR CLARITY. REFER TO CM510 FOR
PLASTERBOARD SPECIFICATION.

ENSURE VCL IS CONTINUOUS


TO RETAIN INTEGRITY OF
BUILDING SHELL

VCL

TYPICAL EAVES
(ATTIC ROOM)
READ IN CONJUNCTION WITH CM5. PLASTERBOARD
DETAILS OMITTED FOR CLARITY. REFER TO CM311 &
510 FOR PLASTERBOARD SPECIFICATION.

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


ISSUE 9

TYPICAL RIDGE AND


CM414

2014

ATTIC ROOM DETAIL


45mm x172mm x 2 TIMBER SPLINES

45
JOINING 2 PANELS TOGETHER.
FIXED AS SHOWN BELOW

TIMBER SPLINES PROJECT


BEYOND PANEL AND CUT PLUMB
ON SITE BY OTHERS

8.0 x 80mm WASHERHEAD SCREW


SIMPSON STRONG TIE CODE ESCR8.0x80
OR 6.0x95 HEADLOK @ 600mm c/c (BOTH
SIDES - STAGGERED).
3.5 x 35mm COARSE THREAD DRYWALL
SCREWS @ 150mm c/c.
5050

C
L
150
300
300
300
300 300
600 300
300
600 300
3.1 x 90mm SMOOTH GALVANISED
600 NAILS AT 300mm c/c (ONE SIDE).

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


THIS DETAIL IS USED IF 90mm SPLINES ARE NOT PROVIDED.
ISSUE 9

ROOF PANEL TO PANEL


CM414

2014

CONNECTION
DETACHED HOUSE

EXTERNAL WALLS
Sips Eco Panel - 15mm KNAUF SOUND PANEL ON 10-25mm BATTENS USING 3mm WOOD SCREWS
AT 600mm c/c TO CREATE SERVICE VOID . IN KITCHENS OR WHERE HEAVY OBJECTS ARE TO BE
FITTED IT IS RECOMMENDED 100mm HORIZONTAL BATTENS ARE GLUED AND SCREWED
BETWEEN VERTICALS WHERE REQUIRED.

INTERNAL WALLS
95mm x 45mm TIMBER STUDS AT 600mm c/c. PROVIDE NOGGINGS MID HEIGHT TO SUPPORT ONE
LAYER 15mm KNAUF SOUNDSHIELD PLUS TO BOTH SIDES. OUTER LAYER WALLBOARD JOINTS TO
BE FILLED AND REINFORCED WITH KNAUF TAPE AND JOINT.

FLOORS
PLYWEB JOISTS, SOLID JOISTS OR METAL WEB JOISTS PROVIDE 1 LAYER OF 15mm KNAUF
WALLBOARD.

FLATS, SEMI-DETACHED AND TERRACED HOUSES.

PARTY WALLS
2 LAYERS OF KNAUF WALLBOARD WITH ALL JOINTS STAGGERED

LOADBEARING WALL 60 MINUTES


2 LAYERS OF KNAUF FIRE PANEL EACH SIDE WITH ALL JOINTS STAGGERED ON OPPOSITE SIDES
AND EACH LAYER WITH JOINTS FILLED AND REINFORCED WITH KNAUF TAPE AND JOINT.

FLATS

EXTERNAL WALLS
2 LAYERS OF 15mm KNAUF FIRE PANEL. ALL PLASTERBOARD JOINTS SHOULD BE STAGGERED
WITH JOINTS FILLED AND REINFORCED WITH KNAUF TAPE AND JOINT.

COMPARTMENT FLOORS
PLYWEB OR METAL WEB JOISTS PROVIDE 2 LAYERS OF 15mm KNAUF WALLBOARD.

RESILIENT BARS AT MAXIMUM 450mm c/c.

GENERAL NOTES AND NAILING SPECIFICATION

WHERE 2 LAYERS OF PLASTERBOARD ARE REQUIRED JOINTS SHOULD BE STAGGERED.


EACH LAYER OF PLASTERBOARD MUST BE FIXED SEPARATELY AT 150mm c/c TO EACH
STUD AND TOP AND BOTTOM RAIL (IF INTERNAL STUD WALL) AND 150mm c/c TO SIP
PANELS.
BOARDS SHOULD BE FIXED USING DRYWALL HIGH THREAD SCREWS. USE 38mm SCREWS
FOR SINGLE LAYERS AND 63mm SCREWS FOR DOUBLE LAYERS.
LOCATE SCREWS AT LEAST 10mm FROM PAPER BOUND EDGE, 13mm FROM CUT EDGES
AND AT LEAST 6mm FROM EDGE OF TIMBER FRAMING.
ISSUE 9

PLASTERBOARD
CM510

2014

SPECIFICATION
PACK BETWEEN
LINING AND JAMB AT
FIXING POSITIONS.

1-3mm
DOOR LINING

FROM FINISHED FLOOR LEVEL


2040 STRUCTURAL OPENING

2mm

32mm
DOOR STOP

FOR 1981 DOOR SET


TIMBER SUPPLIED
LOOSE. FIT TO SUIT
DOOR OPENING
DOOR

ELEVATION

TYPICAL DOOR
OPENING AS ERECTED

PACK BETWEEN LINING AND


JAMB AT FIXING POSITIONS.

1-3
1-3
32 32
1-3mm 1-3

TYPICALLY 838 OR 762 DOOR LEAF

PLAN
READ IN CONJUNCTION WITH CM5. PLASTERBOARD DETAILS
OMITTED FOR CLARITY. REFER TO CM311 & 510 FOR
PLASTERBOARD SPECIFICATION.
Work to written dimensions only. DO NOT SCALE. If in doubt ask.
ISSUE 9

INTERNAL
CM511

2014

DOOR LINING
OPEN PERPENDS FOR CAVITY TRAY/DPC
DRAINAGE OF CAVITY POSITIONED ABOVE
CAVITY BARRIERS AT METER BOX AND
TOP AND SIDES TO EXTENDED 150mm PAST
ISOLATE CAVITY JAMBS
OPENING BRICK CLADDING
SUPPORTED ON 25mm x
5mm GALVANISED MILD
STEEL BAR

STANDARD METER BOX METER BOX TO BE


AS SUPPLIED BY PLUGGED AND SCREWED
STATUTORY TO BRICKWORK
AUTHORITIES BEDDED THROUGH PRE
DETERMINED HOLES.
ON MASTIC
LEAVE AIR GAP BETWEEN
BACK OF BOX AND
BREATHER PAPER.

SIP PANEL
CAVITY BARRIERS
REQUIRED FOR ALL
METERS

GAS INLET PIPE ELECTRICITY SUPPLY


FROM METER TO
CONSUMER UNIT. RUN
DOWN CAVITY OR PASS
THROUGH SIP PANEL.

READ IN CONJUNCTION WITH CM5. PLASTERBOARD DETAILS


OMITTED FOR CLARITY. REFER TO CM311 & 510 FOR
PLASTERBOARD SPECIFICATION.

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


ISSUE 9
CM512

2014

METER BOX
READ IN CONJUNCTION WITH CM5. 1000 MICRON POLYTHENE
PLASTERBOARD DETAILS OMITTED FOR FLASHING OVER BATTENS
CLARITY. REFER TO CM311 & 510 FOR ANGLED TO DIRECT MOISTURE
PLASTERBOARD SPECIFICATION. AWAY FROM FLUE AND TO
ALWAYS CHECK WITH MANUFACTURER
EXTEND 150mm EACH SIDE OF
BEFORE INSTALLATION OF FLUE.
FLUE TERMINAL

LINE FLUE OUTLET WITH


12mm SUPERLUX OR
SIMILAR FIRE RETARDANT OPEN PERPENDS FOR
BOARD AND MAINTAIN A DRAINAGE OF CAVITY
MIN. 25mm GAP EITHER SIDE OF OPENING

GAP TO ALLOW FOR


DIFFERENTIAL MOVEMENT.
REFER TO CM522
COMPRESSIBLE MASTIC SEAL

WATER DRIP COLLAR


AROUND FLUE

AREA OF WALL BEHIND BOILER


TO BE LINED WITH 12mm
SUPERLUX OR SIMILAR
NON-COMBUSTIBLE LINING

GAS FIRED FLUE


COMPRESSIBLE
[INDICATIVE ONLY]
MASTIC SEAL
25

NOT LESS
50

THAN

WATER DRIP COLLAR NON-COMBUSTIBLE FLANGE


AROUND FLUE
25

NON-COMBUSTIBLE SLEEVE
(EXTEND TO FORM CAVITY
BARRIER AROUND OPENING,
NON-COMBUSTIBLE LINING OR INSERT SEPARATE TOP AND
BEHIND BOILER WHERE VERTICAL CAVITY BARRIERS TO
APPROPRIATE ISOLATE CAVITY OPENING

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


ISSUE 9
CM513

2014

FLUE DETAIL
IF A BOILER IS TO BE WALL MOUNTED
THEN IT SHOULD BE FITTED IN
ACCORDANCE WITH MANUFACTURER'S
INSTRUCTIONS.THE BOILER SHOULD BE
FITTED USING FULLY THREADED
SCREWS/NAILS. THE OPENING SHOULD
BE CUT AND THE INSULATION RAKED
OUT USING A HOT WIRE ROUTER TO
ALLOW THE HOLE TO BE TRIMMED
USING 44mm x (INTERNAL PANEL
WIDTH) STUDS. THESE SHOULD BE
NAILED THROUGH THE OSB AT 50mm
c/c. THE FLUE SHOULD HAVE A MINIMUM
GAP ALL ROUND THE OUTSIDE OF THE
FLUE.
on
e cti
s

IF THE APPLIANCE IS NOT SUITABLE


FOR MOUNTING DIRECTLY ONTO A
WALL PANEL IT SHOULD BE SEPARATED
BY A 75mm GAP OR AN ADDITIONAL
LAYER OF PLASTERBOARD [25mm
TOTAL].

OPENING IN WALL FOR BOILER FLUE


CAN BE CUT TO SUIT ON SITE BUT
MUST BE AGREED WITH CUSTOM
HOMES BEFORE CUTTING. IDEALLY
HOLE SHOULD BE POSITIONED
CENTRALLY TO PANEL BUT MUST BE AT
LEAST 500mm FROM TOP OF PANEL

SECTION

MIN. 25mm

READ IN CONJUNCTION WITH CM5.


PLASTERBOARD DETAILS OMITTED
FOR CLARITY. REFER TO CM311 & 510 FOR
PLASTERBOARD SPECIFICATION.
FRONT VIEW
Work to written dimensions only. DO NOT SCALE. If in doubt ask.
ISSUE 9

WALL HUNG BOILER


CM514

2014

FLUE
200 MIN.
FIL VOID AROUND
FLUE WITH WEAK
SAND/CEMENT FILL
AT LEAST 40mm AIR
SPACE IF WALL OF
1340 MIN.

CHIMNEY IS LESS

440 MIN.
340MIN.
THAN 200mm

40mm GAP FILLED


WITH MINERAL WOOL 440 MIN.
BETWEEN PANEL AND
BRICKWORK

450 MIN.
PLAN ON CHIMNEY AT
PLAN ON CHIMNEY RECESS
UPPER FLOOR LEVEL

TIMBER LINTEL TO BE
AT LEAST 300mm
AT LEAST 40mm AIR
FROM INNER FACE OF
SPACE IF WALL OF
FLUE RECESS.
CHIMNEY IS LESS
THAN 200mm

GAP BETWEEN TIMBER


FRAME AND MASONRY TO
BE FILLED WITH MINERAL
WOOL

1340min x 1500mm
HOLE LEFT IN SIP
PANEL
SIP PANEL - DETAIL
HEARTH TO BE AT
OMITTED FOR
LEAST 125mm THICK
CLARITY
PROJECTING 500mm

READ IN CONJUNCTION WITH CM5. PLASTERBOARD DETAILS OMITTED


FOR CLARITY. REFER TO CM311 & 510 FOR PLASTERBOARD
SPECIFICATION.
Work to written dimensions only. DO NOT SCALE. If in doubt ask.
ISSUE 9
CM515

2014

CHIMNEY DETAILS
SQUARE LINED FLUE OF SOLID
NON-COMBUSTIBLE BLOCKS
OR BRICKS
REBATED FLUE LINERS TO BS
1181

300
MIN
EXTERNAL WALL
FIREPLACE SURROUND TO
BD 1251 FIXED TO WALL
THROAT WITH SCREWS THROUGH
CAST-IN FIXING LUGS

0
FLUE GATHERING 10 25mm WIDE
NON-COMBUSTIBLE TAPE
FORMING EXPANSION JOINT

BS 1251 PCC LINTEL OR


BS 1251 FIREBACK HOOD UNIT

1:2:4 LIME: SAND:


cm. / SAND SCEED
BROKEN BRICK
FILLING
SUPERIMPOSED HEARTH
CORRUGATED PAPER 500 MIN
LINING TO FORM AN GROUND FLOOR
EXPANSION JOINT

CONSTRUCTION
HEARTH
DPC
125 MIN

GROUND LEVEL APPROX.

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


ISSUE 9
CM516

2014

CHIMNEY SECTION
WATER TANK SPACED
CENTRALLY

c c
b
a a

100

WATER TANK 295L NOM. MAX.


WATER TANK 227L NOM. MAX.

b1
150

b
300

200

a1 c1 a1
150

c c
200

c1
300

a a b1
150

b
100
300
150

SIZES FOR TANK STAND MATERIALS

a = 40x90 x 2000 LONG


a1 = 40x90 x 1000 LONG
b = 2/40x140 x 300 LONG FOR TRUSSES UP TO 9M SPAN
b1 = 2/40x90 x 4000 LONG FOR TRUSSES UP TO 12M SPAN
c = 40x90 x 1500 LONG
c1 = 40 x 90 x 1000 LONG
15.5x1200x2400 PLYWOOD DECK CUT TO SUIT ON SITE
ALL TANK STAND MATERIAL NAILED WITH 90x4 RUSTPROOF PLAIN HEAD

CHECK LOCATION AND LOADING WITH STRUCTURAL ENGINEER.


Work to written dimensions only. DO NOT SCALE. If in doubt ask.
ISSUE 9
CM517

2014

WATER TANK SUPPORT


150 min

0.25h
Drilling on centre line only. Hole
diameter not greater than 0.25 stud
stud height width and hole centres not closer than
4d (d = hole diameter).
h

0.25h
150 min

Max. 0.25 stud width

Note:
It is recommended to fix Expamet
Safeplates or similar to face of studs
and rails to protect pipes and wires
against rail penetration.

A hole within these rules in a stud which is at least 89mm deep will generally ensure that pipes or
cables are clear of the 40mm or 50mm long nails normally used to fix 12.5mm or 2 x 12.5mm
plasterboard linings respectively. If other board thickness length combinations are specified, the
risk of damage to the services should be checked. Refer to CM510 for plasterboard specification.
Where there is risk to services from nails or screws used to fix lining or flooring boards,
proprietary steel protection plates should be fixed to bridge the notch and protect the services. If
holes or notches larger than 25% of stud depth are necessary, double studs may be needed at
these positions to offset the effect of cutting away the cross sectional area. Where such holes or
notches occur in load bearing walls, the modified members should be checked by calculation.
Roof rafters and purlins, trusses, trussed rafters or bracing should never be notched or cut away
without the relevant calculations being checked or approval obtained from the structural engineer
or specialist component supplier.
When drilling or notching is carried out by the electrician or plumber as part of their installation
work, it is essential that they are aware of the above limits.

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


ISSUE 9

DRILLING HOLES
CM521

2014

IN WALLS
Allow for settlement at flashings to
chimneys etc. depending upon the
number of storeys and chimney
Allowance at eaves and verge: placement within the roof span
17mm - three storey
15mm - two storey
8mm - single storey

15mm at bottom of opening at


second floor level

9mm at bottom of opening at first


floor level

Note: When a timber suspended


floor is used add 6mm to the
3mm at bottom of opening at differential movement allowances
ground floor level quoted.

Note: The allowances shown are for cross sectional timber in the floor zone of conventional platform frame as shown in the detail above,
with timber installed at 20% moisture content and drying to 10% moisture content in service. However, there is minimal shrinkage with
SIPs but allowance should still be allowed for.

The bigger proportion of the differential shrinkage occurs in the floor joists. The shrinkage in the rails and binders does not normally
affect internal linings or the sheathing to panels. However, plasterboard lining to staircase openings of two or more storeys can be
affected since it crosses the floor joist zone. A movement gap in the plasterboard with a cover strip should be provided at the floor zone.

In all cases, the movement gap allowance is for a clear gap. If compressible seals are installed in the gap, the allowance should be
increased as the seal cannot be compressed to zero.

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


ISSUE 9

ALLOWANCE FOR VERTICAL


CM522

2014

SHRINKAGE WHEN USING


MASONRY CONSTRUCTION
Minimum of 4 x 2 woodscrews
2 x 8 (3mm diameter) should be
used to fix this object to the wall

A heavy object such as a


boiler attached to the wall.
100kg x 1000mm x 250mm

15mm plasterboard and


possibly additional
plywood to spread load

Minimum of 6 x 2 woodscrews
2 x 8 (3mm diameter) should be
used to fix the bracket to the wall.

15mm plasterboard and


possibly additional
plywood to spread load
A heavy object resting on a
cantilevered bracket attached to
the wall. 100kg x 250mm x 250mm

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


ISSUE 9

SUPPORT TO
CM523

2014

HEAVY OBJECT
PROTECTION OF TREES
STATUTORY PROTECTION
TREES MAY BE PROTECTED BY A TREE PRESERVATION ORDER [TPO] OR BY
BEING LOCATED IN A CONSERVATION AREA. FAILURE TO NOTIFY OR OBTAIN
CONSENT FROM THE LOCAL PLANNING AUTHORITY COULD RESULT IN
PROSECUTION. CONDITIONS ATTACHED TO A PLANNING CONSENT MAY ALSO
GIVE PROTECTION TO SPECIFIC TREES.

SITE PROTECTION
PROTECTIVE FENCING SHOULD BE ERECTED AROUND ALL TREES AND HEDGING
TO BE RETAINED ON THE SITE ENCLOSING ALL THE AREA UP TO ONE METRE
BEYOND THE CANOPY SPREAD OF THE TREE. THIS WOULD NORMALLY BE AT
LEAST 1.2M HIGH CLEFT CHESTNUT FENCING ON A FIRM STRONG FRAME WORK
COMPLYING WITH BRITISH STANDARD BS 5837:2005, BS1722 AND ANY PLANNING
CONDITION RELATING TO THE SITE.

TREE PROTECTION ZONE


WITHIN THIS AREA NO ACTIVITY SHOULD TAKE PLACE UNLESS IT HAS BEEN
SPECIFICALLY AUTHORISED IN WRITING FROM THE LOCAL PLANNING
AUTHORITY.

SERVICES AND SOAKAWAYS


ALL SERVICE ROUTES SHOULD BE LOCATED OUTSIDE THE TREE PROTECTION
ZONE. HOWEVER, WHERE SERVICES HAVE TO BE LOCATED IN THE VICINITY OF
TREE ROOTS THEN TRENCHES SHOULD BE DUG BY HAND OR THRUST BORED TO
AVOID SEVERANCE OF FEEDER OR STRUCTURAL ROOTS. ALL SUCH WORK
SHOULD BE CARRIED OUT IN ACCORDANCE WITH N.J.U.G.10 [see opposite] AND
AUTHORISED BY THE LOCAL PLANNING AUTHORITY

TREE SURGERY
TREE SURGERY MAY BE NECESSARY TO ENSURE ALL TREES ARE LEFT IN A
SAFE, HEALTHY CONDITION. A QUALIFIED ARBORIST SHOULD BE APPOINTED TO
SURVEY THE TREES AND CARRY OUT REMEDIAL WORKS IN CONSULTATION WITH
THE LOCAL PLANNING AUTHORITY. RECOMMENDED WORK SHOULD BE
SCHEDULED AND LINKED TO THE APPROVED DEVELOPMENT PLAN. ALL WORK
MUST COMPLY WITH BS 5837:2005 AND BS 3998.
ISSUE 9
CM610

2014

TREE PROTECTION
TREE PROTECTION ZONE

DAMAGE TO LIMBS

FIRE DAMAGE

EXCAVATION
DAMAGE TO SPOIL DUMP WILL
STRUCTURAL AND LEAD TO ROOT
FEEDER ROOTS SUFFOCATION

ANY ACTIVITY AROUND STORAGE OF BUILDING


TREE WILL LEAD TO MATERIALS AND SPILLAGE OF
COMPACTION AND
SUFFOCATION OF ROOTS
FLUIDS WILL DAMAGE SURFACE
ROOTS POOR PROTECTION -
DYING TREE

PROTECTIVE FENCE
ERECTED ONE METRE
OUTSIDE EDGE OF TREE
CANOPY TO INCLUDE ALL
ROOTING AREA

MAINTAIN FENCE IN AN
UPRIGHT CONDITION
THROUGHOUT THE
DEVELOPMENT PERIOD

NO BONFIRES MINIMUM
NO STORAGE 1.2M HIGH
NO DISTURBANCE

NO EXCAVATION
NO HARD SURFACING CORRECT PROTECTION
NO SITE HUTS
- HEALTHY TREE
Work to written dimensions only. DO NOT SCALE. If in doubt ask.
ISSUE 9

TREE PROTECTION
CM611

2014

ZONE 1
N.J.U.G. GUIDELINES FOR INSTALLING AND
MAINTAINING UTILITY SERVICES CLOSE TO TREES

DAMAGE TO TREES
[1] TREE ROOTS KEEP A TREE HEALTHY AND UPRIGHT. MOST ROOTS ARE FOUND IN THE TOP 600mm OF SOIL. THEY OFTEN GROW OUT
FURTHER THAN THE TREE'S HEIGHT. THE MAJORITY OF THESE ROOTS ARE VERY FINE; EVEN CLOSE TO A TREE FEW WILL BE THICKER THAN A
PENCIL. MOST STREET TREE ROOTS GROW UNDER THE PAVEMENT AND INTO THE FRONT GARDENS, BUT THEY CAN ALSO GROW UNDER THE
CARRIAGEWAY.
IF ROOTS ARE DAMAGED, FOR EXAMPLE BY TRENCHING, THE TREE MAY FALL OR LOSE ITS VIGOUR AND DECLINE.

[2] TREE TRUNKS CAN BE EASILY DAMAGED, SO BE CAREFUL WHEN WORKING NEAR THEM. FOR EXAMPLE, DO NOT LEAVE PAVING SLABS
AGAINST TREES, DO NOT CHAIN MACHINERY TO THEM OR NAIL SITE NOTICES TO THEIR TRUNKS.

PROTECTING ROOTS
[1] ESTABLISH A PROTECTION ZONE AROUND THE TREE: THE PRECAUTIONARY AREA [see below]

NO PRECAUTIONS PRECAUTIONS
NECESSARY ESSENTIAL
PRECAUTIONARY AREA

EA
AR NTIAL
ON SE
U TI NS ES TRENCHLESS OR
OPEN EXCAVATION

C A IO T MANUAL
AU
PRE PR
EC
EXCAVATION

IN THE PRECAUTIONARY AREA


[2] DO NOT EXCAVATE WITH MACHINERY. USE TRENCHLESS TECHNIQUES WHERE POSSIBLE. OTHERWISE ONLY DIG BY HAND.

WHEN HAND DIGGING, CAREFULLY WORK AROUND ROOTS, RETAINING AS MANY AS POSSIBLE.

DO NOT CUT ROOTS OVER 25mm IN DIAMETER, UNLESS THE COUNCIL'S TREE OFFICER AGREES BEFOREHAND.

PRUNE ROOTS WHICH HAVE TO BE REMOVED USING SHARP TOOLS [E.G. SECATEURS OR HANDSAW]. MAKE A CLEAN CUT AND LEAVE AS SMALL A
WOUND AS POSSIBLE.

BACKFILL THE TRENCH WITH AN INERT GRANULAR MATERIAL AND TOP SOIL MIX. COMPACT THE BACKFILL ONLY WITH EXCAVATED SOIL.

DO NOT REPEATEDLY MOVE/USE HEAVY MECHANICAL PLANT EXCEPT ON HARD STANDING.

DO NOT STORE SPOIL OR BUILDING MATERIAL, INCLUDING CHEMICALS AND FUELS.

[3] FROST CAN DAMAGE EXPOSED ROOTS. IF TRENCHES ARE TO BE LEFT OPEN OVERNIGHT, COVER THE ROOTS WITH DRY SACKING. REMEMBER
TO REMOVE THE SACKING BEFORE BACKFILLING.

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


ISSUE 9

TREE PROTECTION
CM612

2014

ZONE 2
ESTIMATED
WEEK
CM613 ACTIVITY TIMEFRAME 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
GROUNDWORKS 2-3 WEEKS

SITE CLEARANCE
ISSUE 9 FOUNDATIONS
2014 STORM AND FOUL SEWER DRAINS
LAY SERVICE DUCTWORK
TIMBER-FRAME
SCAFFOLDING - 3 SIDES 1-2 DAYS

TIMBER FRAME DELIVERY AND ERECTION 2-3 WEEKS

SCAFFOLDING - 4th SIDE 1 DAY

ROOFING 2 WEEKS

BRICKWORK 2-3 WEEKS

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


FIRST-FIX 1-2 WEEKS

CARPENTRY
ELECTRICAL
PLUMBING
REMOVE SCAFFOLDING 1-2 DAYS

INSULATION AND DRYLINING 3 WEEKS

GLAZING 1-2 DAYS

SCREED FLOOR 5 DAYS

(1 DAY TO LAY AND 4 DAYS TO DRY)


CONNECT SERVICES 1 WEEK

GAS
WATER

based on a 1800ft2 house


SELF BUILD PROGRAMME
ELECTRICS
SECOND-FIX
CARPENTRY 2 WEEKS

ELECTRICS 1 WEEK

PLUMBING 2 WEEKS

KITCHEN 1 WEEK

DECORATING 3 WEEKS

EXTERNAL WORKS 1-2 WEEKS

DRIVEWAY
PATHS
FENCING
LANDSCAPING
BUILDING CONTROL INSPECTION 1 DAY

CERTIFICATE OF COMPLETION ISSUED


INSURANCE COMPANY INSPECTION 1 DAY

THIS PROGRAMME HAS BEEN BASED ON IDEAL WORKING CONDITIONS. NO ALLOWANCE HAS BEEN MADE FOR ADVERSE WEATHER CONDITIONS OR DELIVERY DELAYS. THIS
PROGRAMME IS TO BE USED AS A GUIDE FOR PROGRAMMING TRADES IN THE CORRECT ORDER ONLY, ON A WELL PLANNED SITE. IT IS NOT SITE SPECIFIC. .ALTERNATIVE
ORDER OF TRADESMEN MAY SUIT YOUR SITE BETTER. A WELL ORGANISED SITE CAN BE THE KEY ADVANTAGE IN THE SPEED OF CONSTRUCTION. DETAILED PRE PLANNING
IS A FUNDAMENTAL REQUIREMENT TO MAINTAIN THE ADVANTAGE OF USING SIPS ECO PANELS TIMBER FRAME CONSTRUCTION.
ISSUE 9
2014

PART E
ROBUST
DETAILING
This manual shows how to comply with Approved Document E of the Building Regulations 3) -
Resistance to the passage of sound, but does not achieve approval from Robust Details. The
details and information in this book are for guidance purposes only and are not exhaustive.
They are not site specific. Refer to the relevant design manual and panel drawings for the site,
which should be read in conjunction with the approved Building Regulation drawings and must
be adhered to and take priority over standard details.
CONTENTS

1 FIXINGS SHEET 1
2 FIXINGS SHEET 2
3 GROUND FLOOR SOLEPLATE DETAILS
4 SOLEPLATE FIXINGS
5 FIRST FLOOR SOLEPLATE DETAIL
6 SIPS TO SIPS PANEL FIXING
7 TYPICAL WINDOW COMPONENTS AND ASSEMBLY
8 TYPICAL EXTERNAL DOOR COMPONENTS AND
ARRANGEMENTS
9 EXTERNAL WALL DETAIL
10 OPENINGS AND FIXINGS
11 WINDOW FIXING
12 ROOF FIXING

THIS MANUAL IS FOR GUIDANCE ONLY. IT IS NOT SITE SPECIFIC.


YOU MUST REFER TO THE DRAWINGS PROVIDED WITH EACH KIT
FOR DETAILS RELEVANT TO THE SITE YOU ARE WORKING ON.
SHOULD A DETAIL DIFFER TO SITE DRAWINGS - SITE DRAWINGS
WOULD USUALLY TAKE PREFERENCE. IF YOU HAVE ANY
QUESTIONS PLEASE CONTACT OUR CONTRACTS MANAGER IN THE
FIRST INSTANCE ON 01787 378567.
ISSUE 9

PART E ROBUST
2014

DETAILING CONTENTS
TO BE READ IN CONJUNCTION
WITH DETAIL E19 FOR FULL
CONSTRUCTION OF
SEPARATING WALL

GROUND FLOORS NOT CONTINUOUS


BETWEEN DWELLINGS

FLEXIBLE OR ACOUSTIC SEALANT


(MAY BE OMITTED WHEN TIMBER
GROUND FLOOR IS USED)

FLOOR ZONE FLOOR ZONE 7N DENSE BLOCKS OR


SIMILAR APPROVED. REFER
TO CM110 & CM111
DPC

GROUND FLOOR CONSTRUCTION:


TIMBER FLOOR JOISTS:
- MAY SPAN IN EITHER DIRECTION
- FLOOR DECKING MAY RUN UNDER SOLE PLATES
- CLOSE SPACES BETWEEN FLOOR JOISTS WITH FULL DEPTH TIMBER BLOCKING
WHERE JOISTS ARE AT RIGHT ANGLES TO WALL, OR
BEAM AND BLOCK FLOOR WITH ALL VOIDS FILLED WITH SAND AND CEMENT, OR
PRECAST CONCRETE PLANKS WITH ALL VOIDS BETWEEN PLANKS AND BLOCKWORK
FILLED WITH MORTAR OR FLEXIBLE SEALANT, OR
CAST IN-SITU CONCRETE SUSPENDED SLAB, OR
GROUND BEARING SLAB

*NOTE: ENSURE SUBSTRUCTURE MASONRY IS CORRECTLY SET OUT TO ENABLE TIMBER


FRAME TO ACHIEVE THE REQUIRED GAP BETWEEN WALL PANELS

ELEVATION
Work to written dimensions only. DO NOT SCALE. If in doubt ask.
ISSUE 9

GROUND FLOOR
2014
E1

JUNCTION
TO BE READ IN
CONJUNCTION WITH
PART E ROBUST
DETAIL E19 FOR FULL
CONSTRUCTION OF
SEPARATING WALL

FLEXIBLE OR ACOUSTIC SEALANT PERIMETER INSULATION, ISOLATING


(MAY BE OMITTED WHEN TIMBER SCREED FROM TIMBER FRAME
GROUND FLOOR IS USED)
INSULATION ISOLATING SCREED
POLYTHENE FROM RAFT

DPC

7N DENSE BLOCKS OR
SIMILAR APPROVED.

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


ISSUE 9

GROUND FLOOR
2014
E2

JUNCTION
TO BE READ IN CONJUNCTION
WITH PART E ROBUST
DETAILING E19 FOR FULL
CONSTRUCTION OF
SEPARATING WALL

FLEXIBLE OR ACOUSTIC SEALANT


7N DENSE BLOCKS OR (MAY BE OMITTED WHEN TIMBER
SIMILAR APPROVED. GROUND FLOOR IS USED)
CONTINUOUS DPC

D.P.C.

D.P.C.

RETAINING WALL MAY NEED TO BE


DESIGNED BY ENGINEER

GROUND FLOOR CONSTRUCTION:


TIMBER FLOOR JOISTS:
- MAY SPAN IN EITHER DIRECTION
- FLOOR DECKING MAY RUN UNDER SOLE PLATES
- CLOSE SPACES BETWEEN FLOOR JOISTS WITH FULL DEPTH TIMBER BLOCKING
WHERE JOISTS ARE AT RIGHT ANGLES TO WALL OR
BEAM AND BLOCK FLOOR WITH ALL VOIDS FILLED WITH MORTAR, OR
PRECAST CONCRETE PLANKS WITH ALL VOIDS BETWEEN PLANKS AND BLOCKWORK
FILLED WITH MORTAR OR FLEXIBLE SEALANT, OR
CAST IN-SITU CONCRETE SUSPENDED SLAB, OR
GROUND BEARING SLAB

*NOTE: ENSURE SUBSTRUCTURE MASONRY IS CORRECTLY SET OUT TO ENABLE TIMBER


FRAME TO ACHIEVE THE REQUIRED GAP BETWEEN WALL PANELS
Work to written dimensions only. DO NOT SCALE. If in doubt ask.
ISSUE 9

STAGGERED GROUND
2014
E3

FLOOR
MASONRY OUTER LEAF

Sips Eco Panel

2 LAYERS OF 15mm LAFARGE GTEC FIRE


BOARD. ALL PLASTERBOARD JOINTS SHOULD
BE STAGGERED WITH JOINTS FILLED AND
REINFORCED WITH LAFARGE GTEC JOINTING
SYSTEM
EXTERNAL WALL CAVITY (MIN 50mm)

5mm (MIN) RESILIENT FLANKING STRIP


CLOSE CAVITY WITH A SLEEVED WIRE
REINFORCED MINERAL WOOL BATT CAVITY
STOP

JOISTS MAY SPAN IN EITHER DIRECTION

CLOSE SPACES BETWEEN FLOOR JOISTS


WITH FULL DEPTH TIMBER BLOCKING OR
CONTINUOUS HEADER JOIST WHERE JOISTS
ARE AT RIGHT ANGLES TO THE WALL

SEAL ALL PERIMETER JOINTS WITH TAPE


OR CAULK WITH SEALANT

ELEVATION
Work to written dimensions only. DO NOT SCALE. If in doubt ask.
ISSUE 9

EXTERNAL FLANKING
2014
E4

WALL JUNCTION
E5
ISSUE 9
2014
MASONRY OUTER LEAF (MIN 100mm THICK,
OR TO SUIT DESIGN)

EXTERNAL WALL CAVITY (60mm)

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


INNER LEAF SIPS PANEL. WHERE THERE IS
NO SEPARATING FLOOR E.G. FOR HOUSES;
12.5mm LAFARGE E BOARD ON
10-25mm BATTENS AT 600mm c/c.

INNER LEAF WHERE THERE IS A


SEPARATING FLOOR E.G. FOR FLATS.

WALL TO WALL
TWO LAYER OF 15mm LAFARGE GTEC
FIRE BOARD. ALL JOINTS STAGGERED

EXTERNAL FLANKING
AND REINFORCED WITH LAFARGE
GTEC JOINTING SYSTEM.

CLOSE CAVITY WITH A SLEEVED WIRE


REINFORCED MINERAL WOOL BATT CAVITY
STOP

SEAL ALL PERIMETER JOINTS WITH TAPE


OR CAULK WITH SEALANT

SEPARATING WALL
FULL CONSTRUCTION OF
TO BE READ IN CONJUNCTION
WITH ROBUST DETAIL E19 FOR

PLAN
MASONRY OUTER LEAF (MIN 100mm THICK, OR TO SUIT DESIGN)

EXTERNAL WALL CAVITY

FOR PLASTERBOARD SPECIFICATION REFER TO ROBUST DETAIL 5

IF PRE-COMPLETION CERTIFICATE REQUIRED SEEK SPECIALIST ADVICE

CLOSE CAVITY WITH A SLEEVED WIRE


REINFORCED MINERAL WOOL BATT
CAVITY STOP TO COMPLETELY FILL
CAVITY WIDTH

SEAL ALL PERIMETER JOINTS WITH TAPE


OR CAULK WITH SEALANT

TO BE READ IN CONJUNCTION
WITH DETAIL E19 FOR FULL
CONSTRUCTION OF
SEPARATING WALL

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


ISSUE 9

STAGGERED PARTY
2014
E6

WALL USING STUDS


MASONRY OUTER LEAF (MIN 100mm THICK, OR TO SUIT DESIGN)

EXTERNAL WALL CAVITY

FOR PLASTERBOARD SPECIFICATION REFER TO ROBUST DETAIL 5.

IF PRE-COMPLETION CERTIFICATE REQUIRED SEEK SPECIALIST ADVICE

CLOSE CAVITY WITH A SLEEVED WIRE


REINFORCED MINERAL WOOL BATT
CAVITY STOP

SEAL ALL PERIMETER JOINTS WITH TAPE


OR CAULK WITH SEALANT

TO BE READ IN CONJUNCTION
WITH DETAIL 19 FOR FULL
CONSTRUCTION OF
SEPARATING WALL

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


ISSUE 9
E6.1

STAGGERED PARTY
2014

WALL USING SIPS


MASONARY OUTER LEAF

EXTERNAL WALL CAVITY (MIN 50mm)


Sips Eco Panels

FOR PLASTERBOARD
SPECIFICATION REFER TO
ROBUST DETAIL 5
5mm (MIN) RESILIENT
FLANKING STRIP

JOISTS MAY SPAN IN EITHER


DIRECTION
OPEN
PERPEND TRIMMED BLOCKING TO END OF
JOIST

CLOSE SPACES BETWEEN


FLOOR JOISTS WITH FULL
DEPTH TIMBER BLOCKING OR
CONTINUOUS HEADER JOIST
WHERE JOISTS ARE AT RIGHT
ANGLES TO THE WALL
SITE FIXED SHEATHING BOARD FOR DEPTH
OF FLOOR
CLOSE CAVITY WITH A SLEEVED WIRE
REINFORCED MINERAL WOOL BATT
CAVITY STOP

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


ISSUE 9

EXTERNAL WALL
2014
E7

FLOOR JUNCTION
MASONARY OUTER LEAF
EXTERNAL WALL CAVITY (MIN 50mm)

Sips Eco Panel

FOR PLASTERBOARD SPECIFICATION


REFER TO ROBUST DETAIL 5

5mm (MIN) RESILIENT


FLANKING STRIP

JOISTS MAY SPAN IN EITHER


DIRECTION
OPEN
PERPEND SOFTWOOD TIMBER INFILL
BETWEEN SUPPORTING TOP
CHORDS/FLANGES OF JOISTS
BUILT INTO FRAME TO SUPPORT
FLOOR (BOTTOM CHORD NOT
BUILT INTO FRAME)

RING BEAMS PACKED TO STUD WIDTH

CLOSE CAVITY WITH A SLEEVED WIRE


REINFORCED MINERAL WOOL BATT CAVITY
STOP
SEAL ALL PERIMETER JOINTS WITH TAPE
OR CAULK WITH SEALANT

FOR PLASTERBOARD SPECIFICATION


REFER TO ROBUST DETAIL 5

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


ISSUE 9

EXTERNAL WALL TOP


2014
E8

CHORD SUPPORTED
TO BE READ IN CONJUNCTION
WITH DETAIL E19 FOR FULL
CONSTRUCTION OF
SEPARATING WALL

SEAL ALL PERIMETER JOINTS


WITH TAPE OR CAULK WITH
SEALANT

WHERE REQUIRED INTERNAL


WALL TO COMPLY WITH
BUILDING REGULATIONS
REQUIREMENT E2

THIS DETAILSHOWS A JUNCTION DETAIL


WHERE THE INTERNAL WALL IS FIXED
THROUGH THE SEPARATING WALL LINING;
OTHER JUNCTION DETAILS ARE ACCEPTABLE
PROVIDED ALL JOINTS ARE SEALED WITH
TAPE OR CAULKED WITH SEALANT

PLAN
Work to written dimensions only. DO NOT SCALE. If in doubt ask.
ISSUE 9

INTERNAL SEPARATING
2014
E9

WALL JUNCTION
NOTE: DETAIL SHOWS TOP
CHORD/FLANGE SUPPORTED

SEAL ALL PERIMETER JOINTS WITH


TAPE OR CAULK WITH SEALANT

HEAPLATE FIXED TO INTERNAL WALL


BEAMS

INTERNAL LOADBEARING WALL

5mm (MIN) RESILIENT FLANKING STRIP

SOFTWOOD TIMBER INFILL BETWEEN


SUPPORTING TOP CHORDS/FLANGES
WHERE REQUIRED

FLOOR DECKING

INTERNAL WALL BEAMS

SOFTWOOD TIMBER NOGGINGS


FOR RESILIENT BAR SUPPORT
(LEAVE A SMALL GAP AT END OF
RESILIENT BAR)

METAL WEB JOIST

HEADPLATE FIXED TO INTERNAL


WALL BEAMS
ISSUE 9

LOADBEARING WALL
E10

2014

PARALLEL TO JOISTS
INTERNAL LOADBEARING WALL

5mm (MIN) RESILIENT FLANKING STRIP

SOFTWOOD TIMBER INFILL BETWEEN


SUPPORTING TOP CHORDS/FLANGES
WHERE REQUIRED

FLOOR DECKING

INTERNAL WALL BEAMS

METAL WEB JOIST

SEAL ALL PERIMETER JOINTS


WITH TAPE OR CAULK WITH
SEALANT

HEADPLATE FIXED TO INTERNAL


WALL BEAMS

NOTE: DETAIL SHOWS TOP CHORD/FLANGE SUPPORTED

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


ISSUE 9

LOADBEARING WALL
E11

2014

PERPENDICULAR TO
JOISTS
5mm (MIN) RESILIENT
FLANKING STRIP
EXTRA METAL WEB JOIST
UNDER INTERNAL WALL

FLOOR DECKING

SOFTWOOD TIMBER
NOGGINGS FOR RESILIENT
BAR SUPPORT (LEAVE A
SMALL GAP AT END OF
RESILENT BAR)

HEADPLATE FIXED TO JOIST

SEAL ALL PERIMETER JOINTS


WITH TAPE OR CAULK WITH
SEALENT

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


ISSUE 9

NON LOADBEARING WALL


E12

2014

PARALLEL TO JOISTS
SEAL ALL PERIMETER JOINTS WITH
TAPE OR CAULK WITH SEALANT

HEADPLATE FIXED TO JOIST

WHERE REQUIRED INTERNAL WALL


TO COMPLY WITH BUILDING
REGULATIONS REQUIREMENT E2

5mm (MIN) RESILIENT FLANKING


STRIP

FLOATING FLOOR

METAL WEB JOIST

*NOTE - NON LOADINGBEARING


PARTITIONS MAY ALSO BE TAKEN
DIRECTLY OFF THE FLOATING
FLOOR TREATMENT, CHECK WITH
MANUFACTURER'S INSTRUCTIONS
FOR INSTALLATION

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


ISSUE 9

NON LOADBEARING WALL


E13

2014

PERPENDICULAR TO
JOISTS
39 REDUC FOUNDATION
EXTRA FLOOR DECKING

18mm OSB WORKING


PLATFORM

JOISTS

ABSORBENT MATERIAL

25mm RESILIENT BARS

2 x 15mm PLASTERBOARD

FLOOR DECKING: 39MM REDUC FOUNDATION EXTRA.

JOISTS: 240mm (MIN) TIMBER I-JOISTS

BETWEEN JOISTS

DO:
LAY QUILT (MIN 100mm THICK) BETWEEN ALL JOISTS, INCLUDING DOUBLED UP
I-JOISTS, ENSURING NO GAPS REMAIN
ENSURE FLOATING FLOOR TREATMENT IS SUITABLE AND IS INSTALLED IN
ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS
ENSURE QUILT IS LAID BETWEEN AND NOT UNDER FLOOR BATTENS
INSTALL FLANKING STRIPS AROUND THE PERIMETER OF THE FLOORING
BOARD TO ISOLATE FLOOR FROM WALLS AND SKIRTINGS
ENSURE RESILIENT CEILING BARS ARE FIXED AT RIGHT ANGLES TO THE
JOISTS
REFER TO ROBUST DETAIL 25 FOR CEILING SPECIFICATION.
STAGGER JOISTS IN CEILING LAYERS

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


ISSUE 9

SEPARATING FLOOR
E14

2014

TREATMENT 1
FLOATING FLOOR

FLOOR DECKING

JOISTS

ABSORBENT
MATERIAL

CEILING

(MIN)

JOISTS: 240mm (MIN) TIMBER I-JOISTS

ABSORBENT MATERIAL: 100mm (MIN) MINERAL WOOL QUILT

DO:
LAY QUILT (MIN 100mm THICK) BETWEEN ALL JOISTS, INCLUDING
DOUBLED UP I-JOISTS, ENSURING NO GAPS REMAIN
ENSURE FLOATING FLOOR TREATMENT IS SUITABLE AND IS
INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S
INSTRUCTIONS
ENSURE QUILT IS LAID BETWEEN AND NOT UNDER FLOOR
BATTENS
INSTALL FLANKING STRIPS AROUND THE PERIMETER OF THE
FLOORING BOARD TO ISOLATE FLOOR FROM WALLS AND
SKIRTINGS
ENSURE RESILIENT CEILING BARS ARE FIXED AT RIGHT ANGLES
TO THE JOISTS
REFER TO ROBUST DETAIL 25 FOR CEILING SPECIFICATION.
STAGGER JOISTS IN CEILING LAYERS

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


ISSUE 9

SEPARATING FLOOR
E15

2014

TREATMENT 2
18mm t & g FLOORING BOARD on
19mm GYPROC PLANK (nominally 13.5 kg/m ) on
RESILIENT COMPOSITE DEEP BATTENS AT 600mm c/c
(resilient bar must be continuous and pre-bonded to batten) on
15mm OSB 3 or 4 to BS EN 300
on FLOOR JOISTS

MINERAL WOOL QUILT LAID BETWEEN


BATTENS;
13mm (min) 33-36 kg/m or
25mm (min) 10-36 kg/m
MIN.
70

PLY WEB JOISTS


.

SERVICES, WHERE
REQUIRED, MAY BE
LOCATED ABOVE OR
BELOW QUILT.
100mm (MIN) MINERAL WOOL QUILT INSULATION
(10-36kg/m

PLY WEB I JOISTS PROVIDE 2 LAYERS OF 15mm GYPSUM


PLASTERBOARD.
ULTRA JOISTS PROVIDE 2 LAYERS OF 15mm GYPROC SOUNDBLOC
ON BR1 GYPFRAME RESILIENT BARS AT MAXIMUM 450mm c/c.

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


ISSUE 9

SEPARATING FLOOR
E16

2014

TREATMENT 2.1
CLOSE CAVITY WITH A SLEEVED
WIRE REINFORCED MINERAL
WOOL BATT CAVITY STOP

INTERNAL FLOOR TO COMPLY WITH


BUILDING REGULATIONS
REQUIREMENT E2
FLOOR JOISTS MAY SPAN IN
EITHER DIRECTION

INTERNAL FLOORS SHOULD NOT BE


CONTINOUS BETWEEN DWELLINGS

CLOSE SPACES BETWEEN FLOOR


JOISTS WITH FULL DEPTH TIMBER
BLOCKING WHERE JOISTS ARE AT
RIGHT ANGLES TO WALL

SEAL ALL PERIMETER JOINTS WITH


TAPE OR CAULK WITH SEALANT

TO BE READ IN CONJUNCTION
WITH E19 FOR FULL
CONSTRUCTION OF
SEPARATING WALL

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


ISSUE 9

INTERMEDIATE FLOOR -
E17

2014

HOUSE
TIMBER FRAME AND METAL FLOATING FLOOR
WEB JOISTS

FLOOR DECKING

JOISTS

ABSORBANT
MATERIAL

CEILING
JOIST TYPE DO
IMPORTANT
ENSURE CORRECT METAL WEB
ONLY THE FOLLOWING METAL WEB JOISTS ARE BEING USED (SEE JOIST
JOISTS MAY BE USED: TYPE)
MiTek Posi-Joist LAY QUILT (MIN 100mm THICK)
Prestoplan PresWeb BETWEEN JOISTS ENSURING NO
WOLF easi-joist GAPS REMAIN
Gang Nail ecojoist ENSURE FLOATING FLOOR
TREATMENT IS SUITABLE AND IS
NOTES: INSTALLED IN ACCORDANCE WITH
THE MANUFACTURER'S
ALTHOUGH SINGLE HEADER AND INSTRUCTIONS
SOLEPLATES ARE INDICATED, ENSURE QUILT WITHIN FLOATING
INCREASING THE NUMBER OF HEADER FLOOR IS LAID BETWEEN AND NOT
AND SOLEPLATES WOULD BE UNDER FLOATING FLOOR BATTENS
ACCEPTABLE, HOWEVER, ALL DIMENSION INSTALL RESILIENT FLANKING
SPECIFICATIONS WITHIN ROBUST STRIPS AROUND THE PERIMETER
DETAILS MUCT BE ADHERED TO. OF THE FLOORING BOARD TO
ISOLATE FLOOR FROM WALLS AND
METAL WEB JOISTS CAN BE TOP SKIRTINGS
CHORD/FLANGE SUPPORTED OR FULLY ENSURE RESILIENT CEILING BARS
BUILT-IN AND SUPPORTED ON THE PANEL ARE FIXED AT RIGHT ANGLES TO
AND THIS IS PERMITTED, HOWEVER, ALL THE JOISTS
DIMENSION SPECIFICATIONS WITHIN ENSURE TIMBER FLOOR CEILING
ROBUST DETAILS MUST BE AHERED TO. TREATMENT IS FIXED CORRECTLY
NOTE THAT JOIST HANGERS MUST NOT STAGGER JOINTS IN CEILING
BE USED TO SUPPORT SEPARATING LAYERS
FLOOR JOISTS

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


ISSUE 9

SEPARATING FLOOR
E18

2014

CONSTRUCTION
METAL WEB JOISTS
WALL WALL
WIDTH WIDTH

SERVICE
BATTENS

WALL LINING WALL LINING

SHEATHING Sips Eco Panel

ABSORBENT POLYSTYRENE WITH


MATERIAL DENSITY OF 18kg/m3

95mm x 45mm STUDS AT 600mm c/c 119 Sips Eco Panel


(NOT APPROVED BY ROBUST DETAILS).
STUD WALL
WALL WIDTH: 262mm BETWEEN INNER FACES OF WALL LININGS. 50mm CAVITY

WALL LINING: 2 LAYERS OF 15mm GYPROC WALLBOARD WITH JOINTS STAGGERED.

SHEATHING: 11mm THICK OSB BOARD.

SIDES. MATERIAL MAY BE UNFACED, PAPER FACED OR WIRE REINFORCED.

Sips Eco Panel


WALL WIDTH 288mm BETWEEN INNER FACES OF WALL LININGS. 50mm CAVITY

WALL LINING: 2 LAYERS OF 15mm GYPROC WALLBOARD WITH JOINTS STAGGERED ON 25mm
BATTENS. INFILL BETWEEN BATTENS WITH MINERAL WOOL INSULATION.

TIES (where required structurally): TIES BETWEEN FRAMES NOT MORE THAN 40mm x 3mm, AT 1200mm
(MIN) CENTRES HORIZONTALLY, ONE ROW OF TIES PER STOREY HEIGHT VERTICALLY.

DO:

KEEP WALL LININGS AT LEAST 240mm APART


ENSURE THAT THE 50mm (MIN) GAP BETWEEN THE WALL PANELS IS MAINTAINED.
ENSURE QUILT OR BATTS COVER WHOLE LINING AREA, FITTING TIGHT BETWEEN STUDS
WITHOUT SAGGING.
ENSURE THAT ALL CAVITY STOPS/CLOSERS ARE FLEXIBLE OR ARE FIXED TO ONE FRAME
ONLY.
MAKE SURE THERE IS NO CONNECTION BETWEEN THE TWO LEAVES EXCEPT WHERE TIES
ARE NECESSARY FOR STRUCTURAL REASONS (SEE ABOVE)
STAGGER JOINTS IN WALL LININGS TO AVOID AIR PATHS.
SEAL ALL JOINTS IN OUTER LAYER WITH TAPE OR CAULK WITH SEALANT.

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


ISSUE 9

SEPARATING WALL
E19

2014

CONSTRUCTION
REFER TO SEPARATING
COMPARTMENT WALL DETAIL

IF USING WALL REQUIRING


PRE-COMPLETION TESTING -
SEEK SPECIALIST ADVICE
REFER TO CM 510 FOR
PLASTERBOARD SPECIFICATION.

5mm (MIN) RESILIENT FLANKING


STRIP

FLOOR DECKING RUNS UNDER


SOLE PLATE
CLOSE SPACES BETWEEN
FLOOR JOISTS WITH FULL
DEPTH TIMBER BLOCKING OR
CONTINUOUS HEADER JOIST
WHERE JOISTS ARE AT RIGHT
ANGLES TO THE WALL

JOISTS MAY SPAN IN EITHER


DIRECTION
SEAL ALL PERIMETER JOINTS
WITH TAPE OR CAULK WITH
SEALANT

CLOSE CAVITY WITH A SLEEVED


WIRE REINFORCED MINERAL
WOOL BATT CAVITY STOP

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


ISSUE 9

SEPARATING WALL
E20

2014

CONSTRUCTION
REFER TO SEPARATING
COMPARTMENT WALL DETAIL

IF USING WALL REQUIRING


PRE-COMPLETION TESTING -
SEEK SPECIALIST ADVICE
REFER TO CM 510 FOR
PLASTERBOARD SPECIFICATION.

5mm (MIN) RESILIENT FLANKING


STRIP

FLOOR DECKING RUNS UNDER


SOLE PLATE
CLOSE SPACES BETWEEN
FLOOR JOISTS WITH FULL
DEPTH TIMBER BLOCKING OR
CONTINUOUS HEADER JOIST
WHERE JOISTS ARE AT RIGHT
ANGLES TO THE WALL

JOISTS MAY SPAN IN EITHER


DIRECTION
SEAL ALL PERIMETER JOINTS
WITH TAPE OR CAULK WITH
SEALANT

CLOSE CAVITY WITH A SLEEVED


WIRE REINFORCED MINERAL
WOOL BATT CAVITY STOP

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


ISSUE 9

SEPARATING FLOOR
E21

2014

CONSTRUCTION
LOAD
BEARING
SEAL ALL PERIMETER JOINTS
WITH TAPE OR CAULK WITH
SEALANT

WHERE REQUIRED INTERNAL


WALL TO COMPLY WITH
BUILDING REGULATIONS
REQUIREMENT E2

5mm (MIN) RESILIENT


FLANKING STRIP

ELEVATIONS
NON LOAD
BEARING
RESILIENT BAR NOGGING
SEAL ALL PERIMETER JOINTS WITH
TAPE OR CAULK WITH SEALANT
HEADPLATE FIXED TO RESILIENT BAR
NOGGING

WHERE REQUIRED INTERNAL WALL TO


COMPLY WITH BUILDING REGULATIONS
REQUIREMENT E2

ADDITIONAL SUPPORT TO PARTITION

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


ISSUE 9

INTERNAL WALLS FLOOR


E22

2014

TO CEILING
SURROUND SOCKETS IN
30mm PLASTERBOARD

25 20kg/m3 MINERAL
WOOL

ELECTRICAL SOCKETS, SWTICHES, ETC.

STAGGER SOCKETS, SWITCHES, ETC.


ON EACH SIDE OF THE WALL SUCH
THAT THEY ARE NOT POSITIONED IN
OPPOSITE BAYS

PIPED SERVICES

SERVICE DUCT WITHIN


SEPARATING WALL

STAGGER PIPED SERVICES ON


EACH SIDE OF THE WALL SUCH
THAT THEY ARE NOT
POSITIONED IN OPPOSITE
BAYS

TO BE READ IN CONJUNCTION
WITH E19 FOR FULL
CONSTRUCTION OF
SEPARATING WALL

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


ISSUE 9

SEPARATING WALL -
E23

2014

SOCKETS AND SERVICES


25mm (MIN) MINERAL WOOL QUILT

PIPE BOXED IN WITH TWO LAYERS OF


GYPSUM-BASED BOARD COMBINED

5mm (MIN) FLANKING


STRIP

ALL VOIDS AROUND


PIPE SEALED

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


ISSUE 9

SEPARATING FLOOR
E24

2014

PIPE PENETRATION
CEILING TREATMENT

TIMBER FLOOR CEILING TREATMENT MUST BE EITHER DOWNLIGHTERS AND RECESSED LIGHTING
CT1. CT2 OR CT3 (SEE BELOW). ALL JOINTS TO OUTER DOWNLIGHTERS OR RECESSED LIGHTING MAY BE
LAYERS OF CEILING MUST BE SEALED WITH TAPE OR INSTALLED IN THE CEILING:
CAULKED WITH SEALENT. IN ACCORDANCE WITH THE MANUFACTURER'S
INSTRUCTIONS
THE MAXIMUM LOAD ON RESILIENT BARS SHOULD NOT
EXCEED THAT SPECIFIED IN THE MANUFACTURER'S THE CEILING AREA IN EACH ROOM UNLESS
INSTRUCTIONS THE USE OF A GREATER DENSITY OF LIGHT
FITTINGS IS SUPPORTED BY TESTING
ENSURE CEILING LAYERS HAVE STAGGERED JOINTS UNDERTAKEN IN ACCORDANCE WITH
AT CENTRES NOT LESS THAN 0.75m
SERVICES MUST NOT PUNCTURE CEILING LININGS
INTO OPENINGS NOT EXCEEDING 100mm
(EXCEPT CABLES, WHICH SHOULD BE SEALED AROUND
DIAMETER OR 100 x 100mm
WITH FLEXIBLE SEALENT)
PARTICULAR ATTENTION SHOULD ALSO BE PAID
TO BUILDING REGULATIONS PART B - FIRE SAFETY

CEILING BOARD FIXINGS MUST NOT PENETRATE


OR TOUCH JOISTS

16mm (MIN) RESILIENT BARS WITH CT1 AND CT2


16mm (MIN) METAL RESILIENT CEILING BARS
MOUNTED AT RIGHT ANGLES TO THE JOISTS AT
400mm CENTRES (BARS MUST ACHIEVE A MINIMUM
LABORATORY PERFORMANCE OF rd Rw+Ctr=17dB
AND rd Lw=16dB)

CEILING TREATMENT CT1

TWO LAYERS OF GYPSUM-BASED BOARD,

WITH 32mm SCREWS, AND 12.5mm (NOMINAL

CEILING TREATMENT CT2

TWO LAYERS OF GYPSUM-BASED BOARDS

WITH 25mm SCREWS AND SECOND LAYER OF

FIXED WITH 42mm SCREWS

25mm (MIN) RESILIENT BARS WITH CT3

25mm (MIN) METAL RESILIENT CEILING BARS


MOUNTED AT RIGHT ANGLES TO THE JOISTS AT
400mm CENTRES (BARS MUST ACHIEVE A MINIMUM
LABORATORY PERFORMANCE OF rd Rw+Ctr=17dB
AND rd Lw=16dB)

CEILING TREATMENT CT3

TWO LAYERS OF GYPSUM-BASED BOARD,

WITH 30mm SCREWS AND SECOND LAYER OF

SCREWS

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


ISSUE 9

CEILING
E25

2014

TREATMENT
JUNCTION BETWEEN
SEPARATING WALL AND ROOF
FILLED WITH FLEXIBLE
CLOSER

CAVITY SEPARATING WALL


CONTINUOUS TO UNDERSIDE
OF ROOF

REFER TO ROBUST DETAIL 5


FOR PLASTERBOARD
SPECIFICATION.

ABSORBENT MATERIAL NOT


REQUIRED IN SEPARATING
WALL ABOVE CEILING

EXTERNAL WALL CAVTIY


CLOSED AT EAVES LEVEL
WITH A FLEXIBLE MATERIAL
(E.G MINERAL WOOL). IF A
RIGID MATERIAL IS USED,
THEN IT SHOULD ONLY BE
BONDED TO ONE LEAF

100mm (MIN) MINERAL WOOL

BETWEEN CEILING JOISTS

SEAL ALL PERIMETER JOINTS


WITH TAPE OR CAULK WITH
SEALANT

Work to written dimensions only. DO NOT SCALE. If in doubt ask.


ISSUE 9
E26

2014

ROOF JUNCTION