Pending Canals Nov 20
Pending Canals Nov 20
five
Soil storeys (including
investigation report
future expansion).
incomplete.River width for which additional details sought from field offices
STATUS OF DESIGN IN CANALS DIVISION, IDRB - Details
However of work
provision foroflift,
not furnished,details Er. Balakrishnan Mannarackal Er. Basil J
Sl No. Name of Work Date of Receipt Remarks on the fire Details
locksafety Required
and other
not given.FRL Superintending
Superintending Engineer,Engineer Executive
Executive Engineer
Engineer Additional Remarks
Proposed Irrigation
Construction Complex
of regulator cumatbridge design
Design ofplan indent
twoawaited
checks mandatory
storage requirements
height not
1 06.05.2020 Revised IrrigationRaj
Er.Sunil North
D Circle Irrigation
Er. Jisha Division
A
Thalassery, Kannur river in dams to be carried out. for multi
Cross storey
section buildings
at the
2
across Muvattupuzha
KIIFB-Kerala Forest Department- 17.09.2020 received
Details awaited
furnished. Since low
as per KMBR were not
Kozhikode
South circle ,TVPM Thalassery
Irrigation division,Kottayam
Murinjapuzha in vaikom Constituency According to the proposal, proposed
water levelsite with
is more, Er.Sunil
Mob Raj D
- 9446957393 Er.Balachandran.
Mob: 8606205424P. K
Elephant Rehabilitation centre included.storage
Hence itheight
was Mob:9447063414 9895416675 Location for the second check
3 in Kottayam District 29.05.2020 now design of one check chainage
effective and levels are South circle ,TVPM Irrigation Division,TVPM
project,Kottor-Construction of requested dam to be finalised
dam started.Certain not
will less.toSo
submitted.
be revise
Nthe the of Mob:9447063414
value 9447450809
check dams in Neyyar Reservoir clarifications are required planrock
soft including
feasibilityisofnotthese
given. at
regulator
and letter drafted. vide details.
the site may be
Design submitted
letter no: ascertained
KIIFB-CONSTRUCTION OF
REGULATOR CUM LOCK WITH 15/2017/IDRB/CS-AD6
FOOT BRIDGE ACROSS dated 06/12/2018. CE(I&A) Sunil Raj, Superintending Engineer, Jisha, Executive Engineer
vide letter dated Irrigation south Irrigation Division
4 MEENACHIL RIVER AT 18.01.2019
22.05.2020 requested to circle,Thiruvananthapuram. Mob - Kottayam. Mob -
THAZHATHANGADI IN shift the site to 300m 9447063414 9496291722
ARPOOKKARA PANCHAYATH downstream. Detailed
KOTTAYAM DISTRICT investigation eport awaited
from site.
Detailed investigation
report
Authenticated Soil
NABARD XXIII-Construction of check investigation report, Suresh babu, Executive Soil investigation report of 2010
Baji Chandran, Superintending
dam across Karimpuzha river at discharge, average bed Engineer, MI Division, furnished is not authenticated.
5 27.07.2020 Additional details awaited Engineer, MI Central circle, Ernakulam.
Poosalikadavu in Karimpuzha slope, location co- Palakkad. Mob - Reduced level of bore hole not
Mob - 9946771889
panchayat in Palakkad district ordinates of check dam 9995444195 furnished.
not given.
Additionaldesign
Revised detailshas been Discharge, cross
LSGD - Construction of Thanissery requested vide
submitted fromletter
Executive
No sections, MFL, Bed level, This work is coming under
Executive Engineer, LSGD,
6 checkdam – Karalam Panchayath - 21.01.2020 Engineer, LSGD, Thrissur
CS-AD9/4/2016-IDRB, location of boreholes, site Thrissur district Panchayat
Additional details details Thrissur District Panchayat
Iringalakuda block District14/08/2019.
dated Panchayat . details plan and location (LSGD)
Construction of Regulator cum awaited. of design Proposal drawing
of check dam
Preliminary design
not given. Balakrishnan M , Superintending
Revision Suja K.S , Irrigation
Bridge at Kankakkadavu across showing
started. general
Additional
Details such as soildetails Engineer, TESSYMON KK
7 31.03.2016 including footpath is Poorna Division Malapurram. Mob- Entrusted KERI, Peechi for soil
Bharathapuzha
Neeleswaram-Bakel
KIP(RB) in Kuttipuram
Navigation
Main canal earth slippage at Investigation arrangement,
whether diamondroadshutter IrrigationSNorth
Y Circle
8 16.5.2019 mentioned in report
Non not investigation report, Er. Arun Circle,
KIP(RB) K Jacob KIP(RB)
9961734844
Er. Division NoII,
Jolly Susan Cheriyan
Panchayath-
route-Construction
ch.17000m reg ofRevision
Lock cum1 received. formation
or vertical
survey level, vertical
shutter
details etc to
arebe Kozhikode. MobKottarakkara
- 9446957393 Kottarakkara
investigation and topographycal
Kasargod Development Package - Compliance Report of Kiifb Director,
Mob: Inland
9495552282 Navigation Directorate, Inland navigation survey
9 bridge acrossofdiversion clearence
needed. inofthe 5mlock
from Er. Arun K Jacob Er. Jolly Susan Cheriyan
Construction
Kasargod a bridgecanal
Development
at
across
Package -
23/10/2020 Details
and awaitedAppraisal
Technical provided
Kollam Mob: 9847524381
division,Kannur
Nambiarkal which level, High tide and Director, Inland Navigation Directorate, Inland navigation Single lane bridge of 25 to 30 m
10 Kariangode iriver
Construction
Kanhanged
of a at
Muncipality
Puliyannoor
tractorway in
across 22.10.2020 Report. But proposal for
Preliminary design started portion, Canal discharge. Er. Arun
9447175074 K Jacob Er. Jolly
7994761709Susan Cheriyan
in Kasargod district revision not yet recieved. Low tide level,
Feasibility Existing
of approach Kollam
Director, Inland Navigation Directorate, division,Kannur
Inland navigation span islane
Single to bebridge
designed.
of 25 to 30 m
11 Kayyur-Cheemeni
Kariangode river atpanchayat of in
cheriyakkara 22.10.2020 Preliminary design started bridges on U/s andofD/S
road , crossection 9447175074
Kollam 7994761709
division,Kannur span is to be designed.
Kasargod district
Kayyur-Cheemeni panchayat of were called
proposed for. Now
canal. 9447175074 7994761709
Kasargod district details has beeen
furnished through mail by
the Assistant Executive
Engineer.