Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 4

Proposed building was for

five
Soil storeys (including
investigation report
future expansion).
incomplete.River width for which additional details sought from field offices
STATUS OF DESIGN IN CANALS DIVISION, IDRB - Details
However of work
provision foroflift,
not furnished,details Er. Balakrishnan Mannarackal Er. Basil J
Sl No. Name of Work Date of Receipt Remarks on the fire Details
locksafety Required
and other
not given.FRL Superintending
Superintending Engineer,Engineer Executive
Executive Engineer
Engineer Additional Remarks
Proposed Irrigation
Construction Complex
of regulator cumatbridge design
Design ofplan indent
twoawaited
checks mandatory
storage requirements
height not
1 06.05.2020 Revised IrrigationRaj
Er.Sunil North
D Circle Irrigation
Er. Jisha Division
A
Thalassery, Kannur river in dams to be carried out. for multi
Cross storey
section buildings
at the
2
across Muvattupuzha
KIIFB-Kerala Forest Department- 17.09.2020 received
Details awaited
furnished. Since low
as per KMBR were not
Kozhikode
South circle ,TVPM Thalassery
Irrigation division,Kottayam
Murinjapuzha in vaikom Constituency According to the proposal, proposed
water levelsite with
is more, Er.Sunil
Mob Raj D
- 9446957393 Er.Balachandran.
Mob: 8606205424P. K
Elephant Rehabilitation centre included.storage
Hence itheight
was Mob:9447063414 9895416675 Location for the second check
3 in Kottayam District 29.05.2020 now design of one check chainage
effective and levels are South circle ,TVPM Irrigation Division,TVPM
project,Kottor-Construction of requested dam to be finalised
dam started.Certain not
will less.toSo
submitted.
be revise
Nthe the of Mob:9447063414
value 9447450809
check dams in Neyyar Reservoir clarifications are required planrock
soft including
feasibilityisofnotthese
given. at
regulator
and letter drafted. vide details.
the site may be
Design submitted
letter no: ascertained
KIIFB-CONSTRUCTION OF
REGULATOR CUM LOCK WITH 15/2017/IDRB/CS-AD6
FOOT BRIDGE ACROSS dated 06/12/2018. CE(I&A) Sunil Raj, Superintending Engineer, Jisha, Executive Engineer
vide letter dated Irrigation south Irrigation Division
4 MEENACHIL RIVER AT 18.01.2019
22.05.2020 requested to circle,Thiruvananthapuram. Mob - Kottayam. Mob -
THAZHATHANGADI IN shift the site to 300m 9447063414 9496291722
ARPOOKKARA PANCHAYATH downstream. Detailed
KOTTAYAM DISTRICT investigation eport awaited
from site.
Detailed investigation
report
Authenticated Soil
NABARD XXIII-Construction of check investigation report, Suresh babu, Executive Soil investigation report of 2010
Baji Chandran, Superintending
dam across Karimpuzha river at discharge, average bed Engineer, MI Division, furnished is not authenticated.
5 27.07.2020 Additional details awaited Engineer, MI Central circle, Ernakulam.
Poosalikadavu in Karimpuzha slope, location co- Palakkad. Mob - Reduced level of bore hole not
Mob - 9946771889
panchayat in Palakkad district ordinates of check dam 9995444195 furnished.
not given.
Additionaldesign
Revised detailshas been Discharge, cross
LSGD - Construction of Thanissery requested vide
submitted fromletter
Executive
No sections, MFL, Bed level, This work is coming under
Executive Engineer, LSGD,
6 checkdam – Karalam Panchayath - 21.01.2020 Engineer, LSGD, Thrissur
CS-AD9/4/2016-IDRB, location of boreholes, site Thrissur district Panchayat
Additional details details Thrissur District Panchayat
Iringalakuda block District14/08/2019.
dated Panchayat . details plan and location (LSGD)
Construction of Regulator cum awaited. of design Proposal drawing
of check dam
Preliminary design
not given. Balakrishnan M , Superintending
Revision Suja K.S , Irrigation
Bridge at Kankakkadavu across showing
started. general
Additional
Details such as soildetails Engineer, TESSYMON KK
7 31.03.2016 including footpath is Poorna Division Malapurram. Mob- Entrusted KERI, Peechi for soil
Bharathapuzha
Neeleswaram-Bakel
KIP(RB) in Kuttipuram
Navigation
Main canal earth slippage at Investigation arrangement,
whether diamondroadshutter IrrigationSNorth
Y Circle
8 16.5.2019 mentioned in report
Non not investigation report, Er. Arun Circle,
KIP(RB) K Jacob KIP(RB)
9961734844
Er. Division NoII,
Jolly Susan Cheriyan
Panchayath-
route-Construction
ch.17000m reg ofRevision
Lock cum1 received. formation
or vertical
survey level, vertical
shutter
details etc to
arebe Kozhikode. MobKottarakkara
- 9446957393 Kottarakkara
investigation and topographycal
Kasargod Development Package - Compliance Report of Kiifb Director,
Mob: Inland
9495552282 Navigation Directorate, Inland navigation survey
9 bridge acrossofdiversion clearence
needed. inofthe 5mlock
from Er. Arun K Jacob Er. Jolly Susan Cheriyan
Construction
Kasargod a bridgecanal
Development
at
across
Package -
23/10/2020 Details
and awaitedAppraisal
Technical provided
Kollam Mob: 9847524381
division,Kannur
Nambiarkal which level, High tide and Director, Inland Navigation Directorate, Inland navigation Single lane bridge of 25 to 30 m
10 Kariangode iriver
Construction
Kanhanged
of a at
Muncipality
Puliyannoor
tractorway in
across 22.10.2020 Report. But proposal for
Preliminary design started portion, Canal discharge. Er. Arun
9447175074 K Jacob Er. Jolly
7994761709Susan Cheriyan
in Kasargod district revision not yet recieved. Low tide level,
Feasibility Existing
of approach Kollam
Director, Inland Navigation Directorate, division,Kannur
Inland navigation span islane
Single to bebridge
designed.
of 25 to 30 m
11 Kayyur-Cheemeni
Kariangode river atpanchayat of in
cheriyakkara 22.10.2020 Preliminary design started bridges on U/s andofD/S
road , crossection 9447175074
Kollam 7994761709
division,Kannur span is to be designed.
Kasargod district
Kayyur-Cheemeni panchayat of were called
proposed for. Now
canal. 9447175074 7994761709
Kasargod district details has beeen
furnished through mail by
the Assistant Executive
Engineer.
STATUS OF DESIGN IN CANALS DIVISION, IDRB (as on 20.11.2020)

Sl No. Name of Work Date of Receipt Remarks on the design


indent received
DESIGN WORKS IN PROGRESS

Karappuzha Project- Padinjaraveedu


1 Branch Canal ch.1110m to 1210 m- 25.09.2020
Design of canal and protection wall.

BSP-VBC-Construction of Branch Canal


2 From Chainage 2390 M 15.10.2020
to 2680 M Incuding CD Works

BSP-VBC-Construction of Branch Canal


3 From Chainage 2045 M to 2390 M 20.10.2020
Incuding CD Works

Construction of check dam across


4 Thoothapuzha at Thonikadavu in Vilayur 25.9.2020
Construction
panchayath ofofPalakkad
check dam across
district
Thoothapuzha at Mundorssikadavu in
5 Urgent coastal protection work at 17.09.2020
Sreekrishnapuram panchayath of
6 Chellanam
BSP:Venniyode- bazar,
Palakkad district Chalakkadavu
branch Canal: and 23.09.2020
7 Cheriyakadavu
Construction of Aqueduct: Ch 1715m to 30.09.2020
ch 2045m
WORKS FOR WHICH ADDITIONAL DETAILS AWAITED
Proposed Irrigation
Construction Complex
of regulator cumatbridge
8 06.05.2020 Revised
Design ofplantwoawaited
checks dams
Thalassery,
across Kannur river in
Muvattupuzha
9 BSP- Venniyode Branch canal- 17.09.2020 Details
to be awaited
carried out. According
MurinjapuzhaForest
KIIFB-Kerala in vaikom Constituency in
Department- Design submitted vide letter
10 Construction
Construction of
of Aqueduct
a CheckDam from Ch: 4340 14.09.2020 to
no:the proposal, now design
Kottayam
KIIFB-
Elephant
to Ch:4560
District
Construction
Rehabilitation centreacross
of regulator cum lock 15/2017/IDRB/CS-AD6
11 PAYASWININ
with footbridge River
across atMeenachil
ADHUR river at 29.05.2020 of one06/12/2018.
dated check dam CE(I&A)
project,Kottor-Construction
NABARD XXIII-Construction ofofcheck
check
13 CHONAMPALLAOM
Thazhathangadi KARADKA
in Arpookara 15.09.2020 started.Certain
Design
Revised
vide under
design
letter dated clarifications
progress.
has been
22.05.2020
dams
dam in Neyyar Reservoir
across Karimpuzha river at
14 Panchayath-KASARGODE
panchayath, Kottayam District 18.01.2019 are required
submitted
requested to and
vide shift letter
letter
theNositeCS-
to
Poosalikadavu in Karimpuzha panchayat drafted.
Additional details awaited
AD9/4/2016-IDRB,
300m downstream. requested
dated
Date for
15 LSGD - Construction
Construction of Thanissery
of Regulator cum Bridge at 27.07.2020 Additional details
in Palakkad
(REVISION) district from Executive
14/08/2019.
joint inspection Engineer,
Revision of
for assessing
16 checkdam
Kankakkadavu– Karalam
acrossPanchayath
Bharathapuzha - in 21.01.2020
LSGD,
design Thrissur
including
the suitability of District
footpath
the site is
17 Iringalakuda block
Kuttipuram Panchayath
Construction of a checkdam across
(REVISION) 31.03.2016 Panchayat
mentioned
requesrted
Design .from
in details
completedNon awaited.
CE(I&A)
and
18 Thoothapuzha at Thonikadavu
Neeleswaram-Bakel Navigation inroute-
Vilayur 25.9.2020 Compliance Report of Kiifb
KIP(RB) Main canal earth slippage at submitted
Investigationto DD
report not
19 Panchayath
Construction
Kasargod
ch.17000m of(REVISION)
of Palakkad
Lock cum
Development
reg
District
bridge across
Package - 16.5.2019 and Technical Appraisal
received.
20 diversion canal
Construction
Kasargod of at Nambiarkal
a bridge
Development acrossi -
Package 10/23/2020 Details awaited
Report. But proposal for
21 Kanhanged
Kariangode Muncipality
Constructionriverof a at in Kasargod
Puliyannoor
tractorway acrossin 22.10.2020 revision
Preliminarynot design
yet recieved.
started
22 district
Kayyur-Cheemeni
Kariangode river atpanchayat
cheriyakkara of in 22.10.2020 Preliminary design started
Kasargod district panchayat of
Kayyur-Cheemeni
Kasargod district
on 20.11.2020)
Superintending
Details Required Executive Engineer Additional Remarks
Engineer

Name Mob Name Mob

Design and drawing submitted for


review and approval

Design and drawing completed


and submitted for review

Design and drawing completed


and submitted for review

Design and drawings completed


and submitted for review
Design
Designcompleted.
and drawing Action
approvedtaken
for vetting the same from National
Institute building
Proposed of Ocean was Technology
for five
Design
throughinCE(I&A)
progress
storeys
Soil (including
investigation future
report Design already
Er. Balakrishnan
WAITED expansion).
incomplete.River However widthprovision
not for Er. Basil J furnished. CE P1
Mannarackal
lift, fire safety andofother
furnished,details lock not Executive Engineer asked redesign of
Superintending Engineer, Er. Jisha A
mandatory storage
given.FRL requirements
heightfor notmulti Er.Sunil
Er. Raj
Satheeshan D Circle
K Irrigation
Er Sheena Division
AS additional 2 spans
Irrigation North Irrigation
storey buildings
furnished. Since as lowper KMBR
water level is South circle ,TVPM
Superintending Engineer, Thalassery
Executive Engineer, but later EE vide his
Cross section at the proposed site Kozhikode division,Kottayam
were
more,
Nil not included. Hence it was
effective storage height will Er.Sunil Balakrishnan
Mob:9447063414
Project Circle
Raj D2,Mannarackal Mob:
BSP 8606205424
Division,
Er.Balachandran. letter dated
with chainage and levels are Mob - 9446957393 Sanjeev,
9895416675 ExecutiveP. K Location
Clarificationfor the
requested
be less. Sototherevise
feasibility of not (Additional
the plan South circlecharge),
Kannur ,TVPM Padinjarethara
Irrigation
Engineer Division,TVPM 05.10.2020
second
requested check replied
sincedamtheto
submitted. Jisha, Executive Soil investigation
including these
regulator atNthe
valuesiteof
details. softbe
may rock is Sunil
Superintending
Mob: Raj,
6238404169
Mob:9447063414 Engineer, Mob:
Superintending Minor 9497814833
9447450809
Irrigation Division no
be
siteadditional
finalised
is located design
on the
not given. Baji
Minor Chandran,
Irrigation Circle Engineer report of 2010
ascertained
Authenticated Soil investigation Engineer, Irrigation south Suresh Site visit
is required. proposed
Need on
Superintending
Kozhikode. Mob Engineer,
- Irrigationbabu,
Kasargode. MobExecutive
Division - cuved
furnished portion
is notof the
report, discharge,
Discharge, average MFL,
cross sections, bed circle,Thiruvananthapura Engineer,
9447409043 MI Division, 20-11-2020
clarification
river.work isfrom CE
MI Central
9446957393
Balakrishnan circle,
M, Kottayam.
Executive Mob -
Engineer, authenticated.
This coming
slope,
Bed level, location co-ordinates
location of boreholes, of m. Mob - 9447063414 Palakkad. Mob - P1
Ernakulam.
Superintending MobEngineer,
- 9496291722
LSGD,
Suja K.S Thrissur District
, Irrigation Reduced level of
under Thrissur district
check
site plan dam and not given. details of
location Baji Chandran, 9995444195
9946771889
Irrigation North Circle Suresh
Panchayat babu, Executive bore hole not
Panchayat (LSGD)
Additional
check damdetails
Preliminary not Proposal
given.
design started. Superintending Engineer, Division Malapurram.
Poorna S Ycircle, Engineer,
TESSYMON MI K Division,
K Drawings
furnished. under
Entrusted KERI,
drawing
Nil
Additional
Details
Additional showing
such details
as soil
details investigation Kozhikode.
general
Proposal
whether MI Central Mob - Mob- 9961734844
Palakkad. Mob -Cheriyan preparation
arrangement,
drawing showing road formation
general KIP(RB)
Er. Arun Circle,
9446957393
Ernakulam. K Jacob
Mob - KIP(RB) Division
Er. Jolly Susan NoII, Peechi for soil
report, survey details etc are
diamond shutter or vertical shutter Kottarakkara 9995444195
level, vertical
arrangement, clearence
road of
formation 5m Director,
Er. Arun
9946771889 Inland
K Jacob Navigation Kottarakkara
Inland
Er. navigation
Jolly Susan Cheriyan investigation and
needed.
to be provided in the lock portion, Mob: 9495552282 Single lane bridge of
from Directorate, Kollam Mob: 9847524381
division,Kannur topographycal survey
Canalwhich
level, vertical level,
discharge. High
clearence tide
of 5m
Feasibility and
of Director,
Er. Arun K Inland
Jacob Navigation Inland
Er. Jollynavigation
Susan Cheriyan 25 to 30
Single m span
lane bridge is of
to
Low tide level, Existing bridges 9447175074 Navigation 7994761709
from
approach which level,
road High tide
, crossection of on Director,
and Directorate, Kollam
Inland division,Kannur
Inland navigation be to
25 designed.
30 m span is to
U/s
Low and
proposed tideD/Slevel,were
canal. calledbridges
Existing for. Now 9447175074Kollam
on Directorate, 7994761709
division,Kannur
details be designed.
U/s andhas D/Sbeeen furnished
were called for. Now 9447175074 7994761709
through
details has mailbeeen
by thefurnished
Assistant
Executive
through mail Engineer.
by the Assistant
Executive Engineer.
DeputyDirector Assistant Director

Name ' Mob: e-mail: Name ' Mob: e-mail:

Er. Litty Augustin Er. Anugeetha B


9746676411
Litty Augustin 9400769808
Beena.S ,
litty1705@yahoo.com
9746676411
Ajitha Kumari B M anugeetha.b@gmail.com
9446022022,7beena2@gmail.c
Athulya Das A S
litty1705@yahoo.com
9447351114
Litty Augustin om Augustin
9496367467
Litty
bmajith@yahoo.in
9746676411 athulya2017irr@gmail.com
9746676411
Vinod Chandran R S,
Ajit Kumar .T, 9446556285,
litty1705@yahoo.com litty1705@yahoo.com
9995674636,
Vinod Chandran R S,
ajitkumart22@gmail.com
Ajit Kumar .T, 9446556285, vinodchandranrs@gmail.com
9995674636,
ajitkumart22@gmail.com
Ajit Kumar .T, 9446556285, Parvathy M M, 9447717533,
NCR
Ajit of Kiifb
Kumar .T,and
ajitkumart22@gmail.com TAR from CE vinodchandranrs@gmail.com
9446556285, parvathy.m.m@gmail.com
Parvathy M M, 9447717533,
( I& A) with proposal for
ajitkumart22@gmail.com parvathy.m.m@gmail.com
revision
Litty Augustin not recieved. Sheeja Regulator
S Nair cum bridge
9746676411
Litty Augustin 9495325011
Sheeja S Nair
litty1705@yahoo.com
9746676411
Litty Augustin sheejasn@gmail.com
9495325011
Beena.S ,
litty1705@yahoo.com
9746676411 sheejasn@gmail.com
9446022022,7beena2@gmail.c
Vinod Chandran R S,
Ajit Kumar .T, 9446556285,
litty1705@yahoo.com om
9995674636,
ajitkumart22@gmail.com
Nidhi Sasidharan, 9995208686, vinodchandranrs@gmail.com
nidhisasidharan@gmail.com

You might also like