N o Chainage Description Severity Possible Reasons Remedial Measures

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 29

N Chainage Figure Description Severity Possible Remedial

o reasons measures
1 0+000 Patch N/A  Bad  Proper
workmanship supervision
Size = 2’ x 1.5’ when pothole when pothole
repairing repairing

2 Alligator crack Low  Inadequate  Remove the


structural cracked
Size = 0.25” design pavement,
width  Poor rebuild the
construction base and
of the install new
pavement pavement
base
 Allowing
vehicles with
weights that
exceed the
tolerances
3 0+010 Patch N/A  Bad  Proper
workmanship supervision
Size = 3’ x 4’ when pothole when pothole
repairing repairing

4 0+020 Edge Break  Loss of  Full-depth


support patching
Size = 4’ x 3”  Poor load
(length x drop transfer across
height) the joint
5 Patch N/A  Bad  Proper
workmanship supervision
Size = 4’ x 4’ when pothole when pothole
repairing repairing

6 0+030 Edge Break  Loss of  Full-depth


support patching
Size = 8’ x 4”  Poor load
(length x drop transfer across
height) the joint

7 Raveling Low  Loss of Bond  Remove the


between raveled
Aggregate pavement
Particles and replace it
 Aggregate
Segregation
 Inadequate
Compaction
During
Construction
 Traffic
Dislodging
8 0+040 Alligator crack Medium  Inadequate  Remove the
structural cracked
Size = 0.5” design pavement,
width  Poor rebuild the
construction base and
of the install new
pavement pavement
base
 Allowing
vehicles with
weights that
exceed the
tolerances

9 0+050 Edge drop  Improper  Repair the


shoulder shoulder and
Size = 20’ x 5” construction support the
(length x drop pavement well
height)
10 Alligator crack Medium  Inadequate  Remove the
structural cracked
Size = 0.75” design pavement,
width  Poor rebuild the
construction base and
of the install new
pavement pavement
base
 Allowing
vehicles with
weights that
exceed the
tolerances
11 0+060 Alligator crack High  Inadequate  Remove the
structural cracked
Size = 1” width design pavement,
 Poor rebuild the
construction base and
of the install new
pavement pavement
base
 Allowing
vehicles with
weights that
exceed the
tolerances
0+070 Edge break  Loss of  Full-depth
support patching
Size = 10’ x 5”  Poor load
(length x drop transfer across
height) the joint

Block crack High  Typically  Remove and


caused by replace the
Size = 1.5” shrinkage of cracked
width the asphalt pavement
pavement due layer with an
to temperature overlay
cycles

0+080 Alligator crack High  Inadequate  Remove the


structural cracked
Size = 1” width design pavement,
 Poor rebuild the
construction base and
of the install new
pavement pavement
base
 Allowing
vehicles with
weights that
exceed the
tolerances
0+090 Alligator crack Medium  Inadequate  Remove the
structural cracked
Size = 0.5” design pavement,
width  Poor rebuild the
construction base and
of the install new
pavement pavement
base
 Allowing
vehicles with
weights that
exceed the
tolerances
Patch N/A  Bad  Proper
workmanship supervision
Size = 2’x3’ when pothole when pothole
repairing repairing
0+100 Alligator crack Medium  Inadequate  Remove the
structural cracked
Size = 0.5” design pavement,
width  Poor rebuild the
construction base and
of the install new
pavement pavement
base
 Allowing
vehicles with
weights that
exceed the
tolerances
0+110 Edge break  Loss of  Full-depth
support patching
Size = 12’x10”  Poor load
(length x drop transfer across
height) the joint
Utility cut  Damaging the  Patching
pavement by
Size = 4’x1’ utility
providers

0+120 Longitudinal Medium  A poorly  Crack Sealing


crack constructed
joint
Size = 10’x0.5”  Shrinkage of
(Length x the asphalt
Width) layer
 Cracks
reflecting up
from an
underlying
layer
 Longitudinal
segregation
due to
improper
paver
operation
Edge drop  Improper  Repair the
shoulder shoulder and
Size = 10’x4” construction support the
(length x drop pavement well
height)

0+130 Pothole  Potholes are  Patching


the end result
Size = 2’x0.5” of fatigue
cracking
0+140 Edge drop  Improper  Repair the
shoulder shoulder and
Size = 30’x5” construction support the
(length x drop pavement well
height)

Patch N/A  Bad  Proper


workmanship supervision
Size = 4’x4’ when pothole when pothole
repairing repairing
0+150 Longitudinal Low  A poorly  Crack
crack constructed Sealing
joint
Size = 4’x0.25”  Shrinkage of
(Length x the asphalt
Width) layer
 Cracks
reflecting up
from an
underlying
layer
 Longitudinal
segregation
due to
improper
paver
operation
0+160 Alligator crack Low  Inadequate  Remove the
structural cracked
Size = 0.25” design pavement,
width  Poor rebuild the
construction base and
of the install new
pavement pavement
base
 Allowing
vehicles with
weights that
exceed the
tolerances
Alligator crack Medium  Inadequate  Remove the
structural cracked
Size = 0.5” design pavement,
width  Poor rebuild the
construction base and
of the install new
pavement pavement
base
 Allowing
vehicles with
weights that
exceed the
tolerances
0+170 Edge break  Loss of  Full-depth
support patching
Size = 12’x10”  Poor load
(length x drop transfer across
height) the joint

0+180 Utility cut  Damaging the  Patching


pavement by
Size = 1.5’ utility
across the road providers
0+190 Alligator crack Medium  Inadequate  Remove the
structural cracked
Size= 0.5” design pavement,
width  Poor rebuild the
construction base and
of the install new
pavement pavement
base
 Allowing
vehicles with
weights that
exceed the
tolerances
Edge break  Loss of  Full-depth
support patching
Size = 15’x4”  Poor load
(length x drop transfer across
height) the joint
0+200 Alligator crack Medium  Inadequate  Remove the
structural cracked
Size = 0.5” design pavement,
width  Poor rebuild the
construction base and
of the install new
pavement pavement
base
 Allowing
vehicles with
weights that
exceed the
tolerances
0+210 Patch N/A  Bad  Proper
workmanship supervision
Size = 3’x3’ when pothole when pothole
repairing repairing
0+220 Pothole  Potholes are  Patching
the end result
Size = 3’x3’ of fatigue
cracking

0+230 Edge break  Loss of  Full-depth


support patching
Size = 7’x5”  Poor load
(length x drop transfer across
height) the joint
0+240 Alligator crack Medium  Inadequate  Remove the
structural cracked
Size = 0.5” design pavement,
width  Poor rebuild the
construction base and
of the install new
pavement pavement
base
 Allowing
vehicles with
weights that
exceed the
tolerances
0+250 Edge break  Loss of  Full-depth
support patching
Size = 12’x5”  Poor load
(length x drop transfer across
height) the joint
N Chainage Figure Description Severity
o
1 0+250 Patch N/A

Size = 3.5’ x 4’
2 0+252 Alligator Crack Low

Size = 0.25” width

3 0+252 Alligator Crack Medium

Size = 0.5” width


4 0+254 Alligator Crack Low

Size = 0.25” width


5 0+256 Edge Break

Size = 10’ x 6” (Length x drop


height)
6 0+262 Patch N/A

Size = 2.5’ x 4’ (Width x


Length)
7 0+263 Raveling Low

8 0+263 Edge Break

Size = 8’ x 4” (Length x drop


height)
9 0+263 Alligator Crack Medium

Size = 0.5” width

10 0+266 Edge Break

Size = 10’ x 7” (Length x drop


height)
11 0+266 Alligator Crack Medium

Size = 0.5” width


12 0+268 Pothole N/A

Size = 1’ x 1’ (Length x
Width)

13 0+272 Edge Break

Size = 8’ x 4” (Length x drop


height)
14 0+275 Alligator Crack Medium

Size = 0.45” width