F-3 (IMS-SP-07) RC-'UltraTech PPC' Issue Date:09.12.

2020
`

UltraTech Cement
TEST CERTIFICATE
FOR

Portland Pozzolana Cement


(Fly Ash based)

Test & Compliance


Particulars Test Results Requirements of
CHEMICAL REQUIREMENTS
IS:1489-2015(Part 1)
4.0(100-X)
32.44 ________ Max
1. Insoluble Residue (% by mass) __________ X+
100
(x = Declared % of Fly Ash)
0.60 X Min
2. Magnesia (% by mass) 0.84
__________ 6.00 Max
3. Sulphuric Anhydride (% by mass) 2.20
__________ 3.50 Max
4. Loss on Ignition (% by mass) 1.52
__________ 5.00 Max
5. Total Chlorides (% by mass) __________ 0.10 Max

PHYSICAL REQUIREMENTS
1. Fineness (m2/kg) 364
__________ 300 Min
2. Standard Consistency (%) 30.5
__________
3. Setting Time (minutes)
a.Initial 180
__________ 30 Min
b.Final 245
__________ 600 Max
4. Soundness
a.Le-Chat Expansion (mm) 0.5
__________ 10.0 Max
b.Autoclave Expansion (%) 0.070
__________ 0.8 Max
5. Compressive Strength (MPa)
a.72 +/- 1hr.(3 days) 30.0
__________ 16 Min
b.168 +/- 2 hr.(7 days) UT
__________ 22 Min
c.672 +/- 4 hr.(28 days) UT
__________ 33 Min
6. Drying Shrinkage (%) UT
__________ 0.15 Max
7. % of Fly Ash addition 35.00
__________ 15.0 Min
35.0 Max
The above cement complies with the requirements of
IS:1489-2015(Part 1) for Portland Pozzolana Cement (Fly Ash based)
*Amount of Fly Ash addition in finished cement does not vary
more than +/ - 3% from the declared value.
Date of Dispatch : 02.12.2020