F -6 (SP-1 ; QM -3) BSC-'UltraTech PPC' Issue Date:07.01.

2021
`

UltraTech Cement
TEST CERTIFICATE
FOR

Portland Pozzolana Cement


(Fly Ash based)

Test & Compliance


Particulars Test Results Requirements of
CHEMICAL REQUIREMENTS
IS:1489-2015(Part 1)
4.0(100-X)
31.62 ________ Max
1. Insoluble Residue (% by mass) __________ X+
100
(x = Declared % of Fly Ash)
0.60 X Min
2. Magnesia (% by mass) 0.72
__________ 6.00 Max
3. Sulphuric Anhydride (% by mass) 2.32
__________ 3.50 Max
4. Loss on Ignition (% by mass) 1.10
__________ 5.00 Max
5. Total Chlorides (% by mass) 0.014
__________ 0.10 Max

PHYSICAL REQUIREMENTS
1. Fineness (m2/kg) 353
__________ 300 Min
2. Standard Consistency (%) 30.50
__________
3. Setting Time (minutes)
a.Initial 165
__________ 30 Min
b.Final 225
__________ 600 Max
4. Soundness
a.Le-Chat Expansion (mm) 1.0
__________ 10.0 Max
b.Autoclave Expansion (%) 0.048
__________ 0.8 Max
5. Compressive Strength (MPa)
a.72 +/- 1hr.(3 days) 29.7
__________ 16 Min
b.168 +/- 2 hr.(7 days) 40.4
__________ 22 Min
c.672 +/- 4 hr.(28 days) 59.7
__________ 33 Min
6. Drying Shrinkage (%) UT
__________ 0.15 Max
7. % of Fly Ash addition 35.00
__________ 15.00 Min
35.00 Max
The above cement complies with the requirements of
IS:1489-2015(Part 1) for Portland Pozzolana Cement (Fly Ash based)
*Amount of Fly Ash addition in finished cement does not vary
more than +/ - 3% from the declared value.
Date of Dispatch : 02.12.2020
Week no : 49 of 2020
HOD(QC)
UltraTech Cement Limited
CIN:L26940MH2000PLC128420
Works:Hotgi Cement Works, Hotgi Station - 413 215,District- Solapur (Maharashtra)