AXIAL MOM-Y MOM-Z SHEAR-Y SHEAR-Z TORSION (My2+Mz2)^.

5
(max/min) (long) (trans) (trans) (long)
Total Case 22406 1389 29028 991 83 0 29033
702 645 -1408 -26515 -1128 -86 0 0

SUMMARY CRITICAL CASE 1 1 <= Response Modification Factor ( R )

Pu Mu(long) Mu(trans)
AXIAL - max 22406 -1394 7048 FORCE AT PILE BASE
AXIAL - min 645 -1348 -5416
MOM-Y - max 14944 1389 -5644
MOM-Y - min 14872 -1408 -5326
MOM-Z - max 14682 536 29028 29033
MOM-Z - min 14682 536 -26515
(My2+Mz2)^.5 - max 14682 536 29028
(My2+Mz2)^.5 - min 9591 0 0 0

Written PCA to File : D:\00-Project\01-Ele35\00_Details\00-PierAnalysis\01-Y-1, Span 41+41 m - Sent\011

SHEAR REINFORCEMENT IN COLUMN


f'c = 29.4 MPa  = 0.90 (shear)
fy,stir = 392.3 MPa Cover 0.07 m

V (trans) V (long)
Max V 991 83 kN
Min V -1128 -86 kN
Column Thk 3.80 1.00 m
dv 3.36 0.84 m
vc 900 900 kN/m2
 Vc 2720 2577 kN
Vs 0 0 kN
Av/s 0.00 0.00 cm2/m
DB 12 12 mm
Legs 2 10
@ 0.25 0.25 m
Av/s 9.05 45.24 cm2/m
Not Req Not Req

MAXIMUM TIED BARS SPACING IN COLUMN


Width, b Thk, h
Column dimension 3.80 1.00 m
Main bars diameter, db 32 32 mm
Tied bars dimeter, ds 12 12 mm
Smax (16db, 48ds, b, h ) 0.51 0.51 m

Data GenPcaLoaB1
50000 My (kN-m)

Mx (kN-m)
1000 x 3800 mm

Code: ACI 318-95


6 5
7
-50000 50000
Units: Metric

Run axis: Biaxial

Run option: Investigation

Slenderness: Not considered

Column type: Structural

Bars: User-defined

Date: 10/28/16

Time: 17:07:55

-50000
P = 14682 kN
PCACOL V3.00 (PCA 1999) - Licensed to: KS, Bangkok, THA

File: D:\00-PRO~1\01-Ele35\00_DET~1\00-PIE~1\01-Y-1~1\011\ZPILE(~1\P3810Bx.COL

Project:

Column: Engineer:

f'c = 29.42 MPa fy = 490.3 MPa Ag = 3.8e+006 mm^2 54 #32 bars

Ec = 25493 MPa Es = 200000 MPa As = 43254 mm^2 Rho = 1.14%

fc = 25.007 MPa e_rup = Infinity Xo = 0 mm Iy = 4.57e+012 mm^4

e_u = 0.003 mm/mm Yo = 0 mm Iy = 3.17e+011 mm^4

Beta1 = 0.836656 Clear spacing = 127 mm Clear cover = 87 mm

Confinement: Other phi(a) = 0.8, phi(b) = 0.9, phi(c) = 0.75