Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 4

Laboratory No.

11
Migrate the following electrical control systems to
STAIRCASE language or FUNCTION BLOCK DIAGRAM
(FBD)
Names of the members: Yheruslava Galarza
Department: Santa Cruz de la Sierra
College:UCB
Teacher's name: Fernando Vargas
Code and name of the discipline: IND-203 P2
Department of Mechatronic and Industrial Engineering
Date of realization: 19/05/2020
1.- Insert only the image of each one and attach a video of 2 minutes
maximum of one of the programs explaining the operation.

1.- Direct Start of an Electric motor


2.- Direct Start of an Electric motor Initial and Permanent Pulse
3.- Start reversal of motor rotation
4.- Sequential Start of 4 Dependent Electric Motors
5.- Automatic rotation inversion, 5 seconds of work and 2 seconds of rest
6.- Star Triangle Start

1. Direct Start of an Electric motor

2. Direct Start of an Electric motor Initial and Permanent Pulse

4. Sequential Start of 4 Dependent Electric Motors

3. Start reversal of motor rotation


5. Automatic rotation inversion, 5 seconds of work and 2 seconds of rest

6. Star Triangle Start


- Conclusions
For the resolution of this laboratory, the ladder language was
chosen as the programming method.
It is very important to make a diagram of the process prior to
programming. It is also necessary to define the number of
inputs and outputs that the process requires, in order to make
the choice of the most optimal PLC model for the task. It
should be noted that in the program, all the actions are
carried out sequentially, following the order in which the
steps were written and that, unlike the relays and actual
contacts (whose number is determined by the physical
implementation of these elements). In the PLC it can be
considered that there are infinite auxiliary contacts for each
input, output, etc.

You might also like