Professional Documents
Culture Documents
4G Expansion Signed Sites List 20200626
4G Expansion Signed Sites List 20200626
C
SB
Test
Tool Et.
HW Test Team ET Test Team
Validation Team
Tamirat
Tamirat
Tamirat
Tamirat
Tamirat
Tamirat
Tamirat
Tamirat
Tamirat
Tamirat
Tamirat
Tamirat
Tamirat
Tamirat
Tamirat
Tamirat
Tamirat
Tamirat
Tamirat
Tamirat
Tamirat
Tamirat
Tamirat
Tamirat
Tamirat
Tamirat
Tamirat
Tamirat
Tamirat
Tamirat
Tamirat
Tamirat
Tamirat
Tamirat
Tamirat
Tamirat
Tamirat
Tamirat
Tamirat
Tamirat
Tamirat
Tamirat
Tamirat
Tamirat
Tamirat
Tamirat
Tamirat
Tamirat
Tamirat
Tamirat
Tamirat
Tamirat
Tamirat
Tamirat
Tamirat
Report (HW Check
Site ID Report Done Status
Date) Date
Ping test is done 20 times, C2_moc twice, All DL KPI's faill. PCI0 serves high
C2_only 4 CSFB successful
Detach time and Erab setup time are not checked for all secrors
Detach time and Erab setup time are not checked for all secrors
all ping tests(both pin32 and ping 1460) are done 20 times
almost one third of the serving cell is PCI 0
DL test did not follow test methodology, ping done 20 times,High serving PCI0 for all tests,
C2_CSFB success rate below thr, all ping and DL test did not follow testmethodology. PCI0 serves more percentage.
Validation Date
6/13/2020
6/16/2020
5/28/2020
5/31/2020
6/2/2020
6/11/2020
6/13/2020