αf = 279 βf = 60 αs =
No Strike Trend (αd) dip/plunge (βd) DD Jarak Joint αn = (180±αd)
SET
Kekar N ……0E ( .. ) (m)
1 A 193 38 283 0 13
2 A 191 24 281 0.375 11
3 A 169 20 259 0.33 349
4 A 155 22 245 0.12 335
5 A 145 22 235 0.461 325
6 A 288 35 18 0.31 108
7 A 257 22 347 0.85 77
8 A 209 25 299 0.185 29
9 A 104 47 194 0.405 284
10 A 80 66 170 0.6 260
11 A 227 64 317 0.112 47
12 A 205 59 295 0.87 25
13 A 234 61 180 0.84 54
14 A 122 71 179 0.575 302
15 A 163 55 237 0.14 343
16 A 140 59 209 3.15 320
17 A 150 46 253 0.22 330
18 A 155 57 189 8.95 335
19 A 195 57 195 0.232 15
20 A 176 42 211 0.365 356
21 A 175 46 248 0.12 355
22 A 203 48 255 0.16 23
23 A 195 65 225 0.155 15
Indeks Kekuatan
Point Load > 10 10-Apr 4-Feb 2-Jan
(MPa)
Kekuatan Batuan Utuh
Kuat Tekan
> 250 100-200 50-100 25-50
Uniaksial (MPa)
Pembobotan 15 12 7 4
RQD 90-100 75-90 50-75 25-50
Pembobotan 20 17 13 8
Pembobotan 20 15 10 8
Gores
Permukaan
garis/bahan
sangat kasar, Agak kasar, Agak kasar,
Kondisi Bidang Lemah pengisi
tidak menerus, pemisahan pemisahan
<5mm,
tidak ada <1mm, agak <1mm,
pemisahan 1-
pemisahan, lapuk sangat lapuk
5 mm,
tidak lapuk
menerus
(Lihat D)
Pembobotan 30 25 20 10
Kering
Keadaan umum Lembab Basah Menetes
sepenuhnya
Pembobotan 15 10 7 4
Total
PANDUAN PEMBOBOTAN KONDISI BIDANG-BIDANG
DISKONTINUITAS
Parameter Pembobotan
5 sd 25 1 sd 5 <1 Pembobotan 6 4 2 1 0
<60mm Pembobotan 6 5 3 1 0
Pembobotan 6 4 2 2 0
Sedikit Pelapukan Pelapukan pelapukan
0 Pelapukan segar
lapuk menengah tinggi lengkap
>125 Pembobotan 6 5 3 1 0
>0.5
Jumlah 10
Mengalir
0 RMR 54
44
SMR 54
Kriteria
Sangat
Kasus faktor Menguntungkan
menguntungkan
koreksi
P 73 > 30 30 - 20
T -107 > 31 31 - 20
F1 0.168831169 0.15 0.4
F3 P 85 < 20 20 - 30
P F2 0.15 0.4
T F2 1 1
P 4 > 10 1 sd 10
T 166 < 110 110 - 120
F3 0.024096386 0 -6
SMR 54
Keterangan :
SMR = RMRbasic – (F1 x F2 x F3) + F4
T SMR 72.75
P SMR 69.9
20 - 10 5 sd 10 <5
21 - 10 6 sd 10 <6
0.7 0.85 1
30 - 35 35 - 45 > 45
0.7 0.85 1
1 1 1
0 0 - (-10) < -10
> 120
-25 -50 -60
Peledakan Peledakan
mekanis buruk
0 -8
αj 270 βj 85
αs 197 βs 81
Deskripsi
II I
40 - 21 20 - 0
Jelek Sangat jelek
Bidang atau Bidang besar atau
baji besar seperti tanah
Sangat perlu Reexcavation
perbaikan
Kasus Kriteria faktor koreksi
P |αj - αs|
T |αj - αs - 180|
P/T F1
P |βj|
P F2
T F2
P βj - βs
T βj + βs
P/T F3
Sangat menguntungkan Menguntungkan Sedang Tak menguntungkan
> 30 30 - 20 20 - 10 5 sd 10
0.15 0.4 0.7 0.85
< 20 20 - 30 30 - 35 35 - 45
0.15 0.4 0.7 0.85
1 1 1 1
> 10 Oct-00 0 0 - (-10)
< 110 110 - 120 > 120
0 -6 -25 -50
Sangat tak menguntungkan αj dip dir. kekar
αs dip dir. lereng
<5 βj dip kekar
1 βs dip lereng
> 45 P longsoran bidang
1 T longsoran guling
1
< -10
Keterangan :
-60
Join Set Number Jn
A Massive, no or few joints 0.5 1
B One joint set 2
C One joint set plus random joints 3
D Two joint sets 4
E Two joint sets plus random joints 6
F Three joint sets 9
G Three joint sets plus random joints 12
H Four or more joint sets, random heavily jointed “sugar 15
J Crushed rock, earth like 20
Note: i) For tunnel intersections, use 3 x Jn
ii) For portals, use 2 x Jn
Φr
4 Joint Alteration Number approx. Ja
a) Rock-wall contact (no mineral fillings, only coatings)
Tightly healed, hard, non-softening, impermeable filling,
A 0.75
i.e., quartz or epidote.
B Unaltered joint walls, surface staining only. 25-35° 1
Sigma 1 1054500
Sigma c 99.82
Pembobota 10564.02
Tinggi 9
ESR 1.6
5.625
Pembanding
X 1.53 2.3409 2.5173 X 1.34
Y 0.42 0.1764 1.5866 Y 0.39
Selisih 0.2
0.175923
2.275923
Selisih 0.6
Panjang 2.3
Pendek 0.75 0.195652
2.595652
UCS = 23 x Is Prediksi Nilai (50) (MPa) Natural Kering Jenuh
99.82 2,109 2,009 2,210
31.97 2 1,701 1,983
183.08 2 2,018 2,210
32.2 2 1,726 1,999
* Diperoleh dari hasil pengukuran mekanika batuaan semester 4.
Shaft 500 meter3 dibawah permukaan
0.0576 0.0801
0.0225 0.283019
meter
1.7956 1.9477
0.1521 1.3956
meter
kg 1000 ton
cm meter
Pembanding
X 1.62 2.6244 3.4344 X 0.24 0.0576 0.0801
Y 0.9 0.81 1.853213 Y 0.15 0.0225 0.283019
Selisih 0.4 meter
0.061087
0.338913
1.938913
Pembanding
X 1.53 2.3409 2.5173 X 1.34 1.7956 1.9477
Y 0.42 0.1764 1.5866 Y 0.39 0.1521 1.3956
Selisih 0.2 meter
0.175923
2.275923
Selisih 0.6
Panjang 2.3
Pendek 0.75 0.195652
2.595652