DFCC BOUNDARY
CL OF EXISTING
CL OF EXISTING
CL OF DFC
CL OF DFC
DN TRACK
UP TRACK
DN TRACK
UP TRACK
(I) PILE : 75mm (II) PILE CAP : 75mm (III) PIER,PIER CAP :50mm
(SKEW DIMENSIONS ARE SHOWN IN BRACKET)
9. CRASH BARRIER SHALL BE AS PER LATEST IRC STANDARD.
10. THE STRUCTURE WILL BE DESIGNED AS PER LATEST IRC / IS SPECIFICATIONS FOR MODERATE
CONDITION EXPOSURE.
102.611
102.094
102.380
103.672
110.552
110.664
101.986
102.209
102.903
103.257
104.148
104.648
105.148
105.648
106.148
106.648
107.148
107.648
108.148
108.648
109.148
109.648
110.136
110.889
111.147
111.326
111.425
111.448
111.448
111.448
111.448
111.448
111.448
111.448
111.416
111.276
111.025
110.196
109.696
109.196
108.696
108.196
107.696
107.196
106.696
106.196
105.696
105.196
104.696
104.196
PROPOSED ROAD LEVEL AT 11. ALL THE SETTING OUT DIMENSIONS AND REDUCED LEVEL ETC. SHALL BE VERIFIED AT SITE
CENTRELINE (m) BEFORE STARTING THE WORK.
12. DESIGN LOADING: ONE LANE OF 70R OR TWO LANE OF CLASS A LOADING
13. PROPER PROTECTION MEASURES SHALL BE TAKEN WHILE EXECUTING THE WORK
103.171
104.391
102.471
103.541
102.791
102.781
102.147
101.810
101.486
101.394
101.473
101.737
102.082
102.490
104.013
104.154
104.577
104.657
103.432
103.543
101.844
102.220
102.346
101.206
101.973
102.832
102.742
102.784
102.844
102.992
103.014
103.002
103.102
103.067
103.093
103.094
102.957
102.862
102.652
102.474
102.828
103.665
104.438
103.455
101.969
102.095
101.865
101.635
101.915
100.785
102.459
103.118
103.098
EXISTING ROAD LEVEL AT NEAR THE RAILWAY TRACK.
14. SAFETY WORK SHOULD BE PROVIDE LIKE PROTECTIVE SCREENS,EARTHING, CAUTION BOARD ETC.
CENTRELINE (m) 15. CHECK & VERIFIED THE ALIGNMENT BEFORE STARTING EXECUTION WORK.
16. BED LEVEL,FRL, SHOULD BE VERIFIED BEFORE EXECUTION.
-0+020
0+000
0+020
0+040
0+060
0+080
0+100
0+120
0+140
0+160
0+180
0+200
0+220
0+240
0+260
0+280
0+300
0+320
0+340
0+360
0+380
0+400
0+420
0+440
0+460
0+480
0+500
0+520
0+540
0+560
0+580
0+600
0+620
0+640
0+660
0+680
0+700
0+720
0+740
0+760
0+780
0+800
0+820
0+840
0+860
0+880
0+900
0+920
0+940
0+960
0+980
1+000
1+020
17. THE APPROACHES WORK SHOULD BE DONE WITH MOST SPECIFICATION.
CHAINAGE 18. SHAPES AND SIZE OF PIER, PIER CAP, BEARING SHOWN IN THIS DRG. TENTATIVE. AND ARE
SUBJECTED TO CHANGE IN FINAL DESIGN & DRAWING
19. EXCAVATION OF ROB WORK SHALL BE DONE ONLY IN PRESENCE OF AUTHORIZED RAILWAY
REPRESENTATIVE TO ENSURE THE SAFETY OF RUNNING TRAIN PROPER PRECAUTION
SHALL BE TAKEN DURING EXCAVATION OF FOUNDATION NEAR THE TRACK PROPER SHORING
SHALL BE DONE TO PROTECT SLOPE FAILURE OF SOIL.
20. 6mm THK. LINER PROVIDED UP TO 6.0m DEPTH.
RCC T-BEAM
KERB STONE 107.568m - 37.560m
RCC CRASH 24.0m SPAN
BARRIER
2.0% 2.0% TOTAL LENGTH 542.124m - 354.914m
OF APPROACH
HAUNCH
SEISMIC
ARRESTER
TOTAL LENGTH - 74.560m -
OF RAILWAY
SEISMIC C/S GIRDER
RESTRAINER
(2800x1200Dx500W)
ELASTOMERIC BEARING
RCC PEDESTAL
END OF RE WALL
END OF RE WALL
START OF RE WALL
START OF RE WALL
RCC CIRCULAR PIER
TOP OF TOP OF BOTTOM OF TOP OF TOP OF BOTTOM OF
RCC CIRCULAR PIER LOCATION PIER CAP BED LEVEL PILE CAP PILE CAP LOCATION PIER CAP BED LEVEL PILE CAP PILE CAP
ROB @ 99 APL3 108.020 102.057 101.557 99.757 APR3 107.977 102.815 102.214 100.414
ARRESTER
APL6 106.635 102.093 101.557 99.757 APR6 105.905 102.765 102.214 100.414
START OF RE WALL
START OF RE WALL
END OF RE WALL
END OF RE WALL
180mm THICK PANEL FACIA
180mm THICK PANEL FACIA APL7 106.035 101.943 101.044 99.244