Case Study Bahria Town - Phase 6: Hapter #6
Case Study Bahria Town - Phase 6: Hapter #6
hapter #6:
Task was to design the water supply scheme for bahria town phase-6 by keeping in mind various
parameter and figures, and task is finally fulfilled.
average daily usage of water per capita, which is different for different areas depending upon the;
Availability of water
Climatic parameters like temperature, rainfall etc.
Life style of the population
Per capita demand depends upon the various factors such as:
• Cost of water
• Metering
• Standard of living etc.
Water used per capita is the sum of all types of uses such as:
• Domestic purposes
• Non-domestic purposes i.e., for commercial areas (15% of domestic purposes)
• Unaccounted water (10% of domestic)
• Fire demand (5 lpcd)
Considering all these parameter we calculate the per capita water demand
Mosque 50 lpcd
Demand multiplier:
We calculate the average daily demand but we are going to design the water supply scheme on
peak hourly demand so to convert average daily demand into peak hourly demand, demand
multiplier will be 2.25
B-Draw pipeline:
Water pipes should be laid out in loops to avoid dead-ends that create stagnant water. Water pipes
must be buried at least 48 inches below the ground surface in Ohio to protect them from freezing.
1- draw pipeline throughout the plan and draw node where two pipe meet and layout pipeline
according to grid iron system or looped system
2- name each length and node of having elevation 220 m
3-Measure length of each pipe
4- calculate demand on each node in litre per sec
Overhead tank :
locate the tank near mosque on meadow with
initial level =17m
maximum level=18m
ninimum level = 15m
elevation=220m
Demand on each node:
1-Calculate demand of each block , ,mosque, commercial area, baheria height
By formula
Total demand = population x per capita water demand
Calculate demand of each green belt , park, monument
Total demand = area x 7 litre per m2 per day
2- divide demand of each block, commercial area, beheria height, mosque , green belt, mosque by
no of nodes serving them
For example demand of A block is = 50160 litres/day
After the assigning values of base demand and diameter on links we run the project on EPANET
and run was successful .its gives the pressure value at nodes. Which is minimum required.
Finally we had designed the water supply scheme for bahria town phase -6 with minimum
residual pressure at each node and diameter of each pipe having head loss less than 0.001 meter