Schedule B Work Done: Months Units Remarks Sr. No. Qty of Supervisor Qty of Traffic Guard

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

Schedule B Work Done

Part Design and Construction of elevated viaduct and 6 elevated stations viz. MTNL
Metro, SG Bharve Marg, Kurla Terminous, Kurla East, EEH & Chembur [Excluding
Architectural Finishing & Preengineered steel roof structure of Stations] from
Chainage 46749.923 m to 52665.359 m of Line 2B Corridor [D.N.Nagar to Mandale]
of Mumbai Metro Rail Project of MMRDA

DETAILS: WORK COMPLETED BY EARLIER CONTRACTOR M/S MBZ-RCC UP TO 31ST JANUARY, 2020

Deployment of adequate manpower for 8 hrs. shift for day and night management
of traffic in intersection, roadway influenced by contractor and traffic diversions at
various levels.

Sr. Qty of Qty of Traffic


Months Units Remarks
No. Supervisor guard

1 Upto Oct-18 Shifts 0 1327 IPC1


2 Nov-18 Shifts 0 382.00 IPC2
3 Dec-18 & Jan-19 Shifts 0 643.00 IPC3
4 Feb-19 Shifts 0 391.00 IPC4
5 Mar-19 Shifts 0 387.00 IPC5
6 Apr-19 Shifts 0 528.00 IPC6
7 May-19 Shifts 0 560.00 IPC7
8 Jun-19 Shifts 0 549.00 IPC8
9 Jul-19 Shifts 31.00 485.00 IPC9
10 Aug-19 Shifts 52.00 790.00 IPC10
Total 83.00 6,042.00