User Manual: GZF850-VH Repeater
User Manual: GZF850-VH Repeater
User Manual: GZF850-VH Repeater
GZF850-VH Repeater
(B40Y02JW02YF)
User Manual
Nov. 2010
FiberHome reserves the right to make changes without further notice to any
assume any liability arising out of the application or use any product or circuit
described herein.
or duplicated, in any form or by any means without the prior written permission of
FiberHome Corporation.
■Warning
Do not modify, disassemble or remove the cover. These actions could cause electrical
shock. We shall never be responsible for any problems caused by your reconstruction or
modification.
Do not touch the internal components. They may have high voltage or high temperature.
You may get electrical shock or burnt.
When the system is operating, keep your hands and face away from it. Otherwise, you
may get injured by an accident.
■Caution
Please read catalogue and instruction manual carefully before use.
Use the products within the specified input voltage, temperature and humidity. Use of
products in non-specified condition may damage the product.
Connect the frame ground terminal to the ground terminal of the device for safety. Use
of the products without ground connection may cause an electrical shock.
Do not use the product in the environment with strong electromagnetic field, gas and
conductive substances.
ii
Preface
network. It receives and amplifies forward and reverse Radio Frequency (RF) signal to
extend the coverage of base station. This user manual covers the system frame, technical
iii
INDEX
1. GENERAL ........................................................................................................................................... 1
2. APPLICATIONS.................................................................................................................................. 6
3 INSTALLATION ................................................................................................................................... 8
iv
User Manual
1. General
Forward
BTS BCS MS
PD PD PA
LNA
D BCS D
L L
Monitor Door
X & Battery Sensor X
C C
P PA P
LNA
Reverse
Modem
Power Supply
GZF850-VH
(B40Y02JW02YF)
1
User Manual
state-of-the-art performance such as minimized noise figure, time delay and IMD,
Modular design: Modular design is easier for operators to make upgrade and
maintenance.
Monitor and control (M&C): The interior M&C module is the core to control the whole
Perfect query, statistic and report: It can support query, statistic and report for the
history data including log, repeater data and query data etc.
range of -25°C ~ +55°C (for outdoor repeater only) so that the product can work
reliably in a wide range of environments; the power supply of the integrated system is
designed with high redundancy to make sure that the power module can work under
normal load in 55°C and start normally in -25°C; the repeater is provided with
multi-level lightning protection devices to ensure reliable lightning protection for the
power supply, antenna and feeder. The lightning protection device of the power supply
2-level protection, so that it can absorb very high lightning strike energy as well as
2
User Manual
Window98/ME.
Technical Specification
UPLINK DOWNLINK
Frequency Band 824 ~ 849MHz 869 ~ 894MHz
Number of Band Adjustable Modules 2
Filter Bandwidth 2-15MHz and 1-6MHz
Output Power 33±2dBm 40±2dBm
System Gain 90±2dB
Automatic Level Control Within2 dB or shut off
ATT Range in 1dB Step 0~25dB
3
User Manual
Ripple in pass band ≤6dB
Noise Figure ≤6dB
VSWR ≤1.5
Group Delay ≤9μs(System delay)
9kHz~1GHz/100kHz ≤-36dBm
Spurious Emission
1GHz~12.75GHz/1MHz ≤-30dBm
MECHANICAL SPECIFICATION
1.5 Interfaces
4
User Manual
1.6 Structure
5
User Manual
1.6.3 Dimension
2. Applications
Accessing the signal by using a small Yagi antenna or Logarithm period antenna, low
power repeater amplifies the signal and combines the indoor distribution system, which
Yagi ANT
Ceiling ANT
Repeater Splitter
Power Switch
Cable
Ceiling ANT
6
User Manual
7
User Manual
3 Installation
Start
Project Preparation
Unpacking&goods checking
Antenna&feeder installation
Repeater installation
Grounding
AC power connection
End
Fig. 3-1 the general workflow of the repeater
To ensure safety during the installation, make sure to wear safety belt for
overhead operations and wear safety hats for on-the-ground operations, and
8
User Manual
Technicians will take charge of the equipment installation and the user’s technicians
should provide help if necessary. To ensure the normal running and maintenance of
the equipment, the user’s technicians should proactively work together with engineers
and technicians and get familiar with the installation, structure, cabling, debugging
procedure, etc.
Before installation, the installation technicians should consult with the project manager
of the user and learn whether the installation site is ready for equipment installation.
Specifically, they should survey such items as the installation site, iron tower or high
pole, surrounding environment (temperature and humidity) and power supply. Where
conditions permit, they should make an on-site survey together with the relevant
Installation tools include: electric percussion drill, iron hammer, pulley, rope, safety belt,
safety hat, ladder, screwdriver, hacksaw, knife, pliers, spanner, compass, tape,
9
User Manual
The installation technicians should keep on hand, and read in advance, such
The repeater is designed to work outdoors under the temperature -25℃~55℃ and
in most areas. The following basic conditions should be ready before installation:
3. There are appropriate buildings, iron towers or high poles to mount the donor
3. The installation building, iron tower or high pole should be provided with lightning
4. The antenna backstay or roof should be provided with a pole to help mount the
10
User Manual
antenna. The diameter of the pole may be 50mm ~ 105mm, depending on the
antenna. All metal parts should be properly grounded and provided with lightning
protection facilities.
Check whether the packing box is intact in appearance. If any goods are wrong or
missing or if the outer package is damaged seriously, stop unpacking immediately and
Open the packing box if it is intact. Handle with care to avoid damaging anything.
After the packing box is opened, check whether the goods inside match the packing
list and whether the packing list matches the inspection list in the Unpacking
Inspection Report. If any goods are wrong or missing or if the outer package is
damaged seriously, find out the cause, and report to the relevant department.
After unpacking inspection, fill out the Unpacking Inspection Report. Both parties shall
sign the report, and then the goods shall be handed over to the user. Each party shall
hold one copy of the Unpacking Inspection Report, and the project supervisor should
feed back the “Inspection Conclusion” within seven days to the vendor for
documentation.
11
User Manual
The Repeater is attached with such installation fittings as installation board and fixing
pieces. The chassis of the repeater can be mounted either on the wall or on a high
pole. The bottom of the equipment is usually about 1.2 m above the ground.
12
User Manual
4. Site Commissioning
Note: Please excuse us for not giving any further notice about any changes of
The following steps are the process of connecting PC or laptop to the repeater on the
Open the LMS software file, running the LMS firstly, click the icon of LMS with the right
button of the mouse, and then choose open to get access into the LMS.
13
User Manual
Step1: Choose the “Serial” which connect with testing equipment, then Click “open
serial”. We need RS232 cable to connect the repeater with the PC or laptop.
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
Port 1 Port 2
14
User Manual
The pin 2 and pin 3 of the RS232 cable are crossing connected, and two pins 5 of the
two tie-ins are connected directly. Pins left are not connected.
15
User Manual
Change software interface to “File View”, and then click file 850-VH that is related to
testing equipment. Then Click “Query” to ensure successful connection between the
PC and testing equipment.
Click “Set Parameter” to keep the RF switch open, and change the work channel.
16
User Manual
Work Channel 1: It displays the start frequency (ARFCN) of the first adjustable band
Work Channel 2: It displays the stop frequency (ARFCN) of the first adjustable band
Work Channel 3: It displays the start frequency (ARFCN) of the second adjustable band
Work Channel 4: It displays the stop frequency (ARFCN) of the second adjustable band
Note: If users have any problems for above items, please refer to local