14 Nov, 2018 29 Mar, 2019 - 19 Apr, 2019

PT. RE menyampaikan : Rencana Proses Pengosongan Batu Bara


Rencana Pek. Pancang di Line B Grid 1-7
Line B 12 Des – 20 Des 2018 (MoM 29 Mar 2019
(MoM 14 Nov 2018) 20 Jan, 2019 - 11 Apr, 2019 & MoM 18 Apr 2019)
Rencana Proses Pengosongan Batu Bara di Line B~C
(MoM 15 Jan 2019)
12 Dec, 2018 - 20 Dec, 2018
Rencana Pek. Pancang 15 Apr, 2019
Line B Grid 1-14 1 Mar, 2019 Rencana
PLAN (MoM 14 Nov 2018)
13 Dec, 2018 Aktual Pengosongan Finish Pek. Pile Cap
PT. PJB menyampaikan : Batu Bara Line B Di Line B
Pek. Pancang di Line B dipindah Grid 8~14 (100 %) (MoM 15 Jan 2019)
(Daily Report)
Kronologi Ke Line C (stok batu Bara tinggi)
pekerjaan -MoM 13 Des 2018-
Pancang
Apr Apr
14 Nov, 2018 Nov 2/23/2019 3/19/2019 4/5/2019 1 May, 2019

19 Mar, 2019 - 5 Apr, 2019 22 Apr, 2019 - 30 Apr, 2019


Pekerjaan Pancang Pekerjaan Pancang
Line B Grid 8 – 14 Line B Grid 1 – 7
(Daily Report) (Daily Report)
16 Nov, 2018 - 23 Feb, 2019
26 Feb, 2019 - 26 Mar, 2019 6 Apr, 2019 21 Apr, 2019
Pekerjaan Pancang
ACTUAL Line A Grid 1~14
Pekerjaan Pancang Start Idle Finish Idle
Line C Grid 1~14 Alat Pancang Alat Pancang
(Daily Report)
(Daily Report)

Klaim Idle
Alat Pancang
(16 Hari)