7/25/2019 Launch

Complete a damage report each visit to a property. If new dam


Damages to Report" section of the damage report form.
Update all damages found in the "Previously Reported Damag
Cuts are exterior only, since the property was not entered sele

Damage reports and photos need to be submitted to Vendor 3


(based on the field completion date). Bids to remedy damages
the completion being uploaded.

Report exterior damages when performing grass cuts. Th


property damage, roof leaks, and missing/stolen air condi