General Notes
Location : Amarapura township / Mandalay . Drawing No. ST - 01
General Notes
1. Any part of the document and information shall not be changed or modified without permision.
2. The contractor shall check all drawing and verify level and dimension in advance in work.
3. Unless otherwise stated, all dimension are inches in advance of work.
4. The contractor shall obtain the engineer's approval before concreting and placing of any blinding concrete layer or
reinforement.
5. Concrete
All Structural member = 2500 Mpa
6. Rebar
10 mm diameter and smaller bars = 40000psi ( 280 MPa )
12 mm diameter and greater bars = 60000psi ( 420 MPa )
7. Time for Removal of Formwork.
Excluding cases when concrete strength can be confirmed, refer to the follwoing.
- Unloading Beams sides, Wall and column = 1 Days
- Slabs Formwork = 7 Days
- Beam Formwork = 14 Days
- Cartilever Formwork = 28 Days
8.
C1
Lo SECTION A -A
A A
- 8 X MAIN BAR DIAMETER
SPLICE ZONE
- 100 mm
- 0.5 X ( SMALLER OF C1 OR C2 ) LAP SPLICE AND STIRRUP SPACING REQUIREMENTS FOR BEAMS
50mm MAX
S≤2So - 300 mm
s≤
FLOOR Lo
2h
LEVEL
- LARGER OF C1 OR C2
45°
Lo ≥ - Ho/6
Lo
CONC. GRADE - 460 mm
AS COLUMN
MIN: 2 BARS FOR FULL LENGTH ALONG TOP AND FACE
- 8 X SMALLEST LONG: BAR DIAMETER
S≤d/2
TOP OF So
Lo
FOUNDATION
- 24 X HOOP BAR DIAMETER
75 mm THK:
Lsp
LEAN CONCRETE
300 300
So
MIN MIN
- 300 mm
2h
50mm MAX
- d/4
Title :
Client Name : Ma Thuzar Myint Rev ; 01
General Notes
Location : Amarapura township / Mandalay . Drawing No. ST - 02
db CRITICAL SECTION
D
db
12db
12db
STANDARD 90°HOOK STANDARD 180°HOOK D
MAIN BAR
Ldh = 150 MIN.
db 180°HOOK db
D
D
D
4db
6d
b
NOTATION
COMPRESSION BAR ANCHORAGE AND LAP LENGTHS
1. db = DIAMETER OF DEFORMED BAR f'c = 4000 Psi (28 MPa) f'c = 5000 Psi (35 MPa)
BAR SIZE ANCHORAGE LAP SPLICE ANCHORAGE LAP SPLICE
2. MINIMUM DEVELOPMENT LENGTH = 300mm(STRAIGHT)
(mm) (Ldc) STRAIGHT(Ld) (Ldc) STRAIGHT(Ld)
3. MINIMUM DEVELOPMENT LENGTH=150(HOOK) D10 13 db 20 db 12 db 20 db
4. LAPPING LENGTH IN TENSION D12 19 db 30 db 17 db 30 db
D16 19 db 30 db 17 db 30 db
- CLASS A, SPLICE, TEN = 1.0 Ld
D20 19 db 30 db 17 db 30 db
- CLASS B, SPLICE, TEN = 1.3 Ld
Title :
Client Name : Ma Thuzar Myint Rev ; 01
1FL Column
Location : Amarapura township / Mandalay . Layout Drawing Drawing No. ST - 03
N
11'-3"
E
3'-2" 9" 9" 9" 9"
1' 1' D
9" 9"
1.5" Cover
9"x6"Stirrup Ø10mm rebar 6" c/c
( Lapping area 3" c/c )
12" 9"
11'-6" main Column Ø 18 mm rebar
6"
9"
Cover 1"
9"x9" Col Detail Rebar
9" 9"
1' 1' B
13'
1' 1'
1' 1' A
1"
42
1"
42
1 2
Date :
Project Name : Two and a Half Storey Residential
Building 20/Dec/2020
Title :
Client Name : Ma Thuzar Myint Rev ; 01
Footing Layout Drawing
Location : Amarapura township / Mandalay . Drawing No. ST - 04
**Depth Only 3'-9"ft ( Footing 9" Thk: ) N
11'-3" only 1" Lean Concrete
E
3'-2" 2'-3"
D
3'
10'-6"
Main Bar Ø16mm Both Ways ( One layer )
5'
11'-6"
cover 3"
5' 5' C
13' 5'
1'-2" 1'-2"
Hard Core and Sand 6"
5'
5' 5' B
3' 3'
1'-6"
13' 1'-6"
1' 1'
8' 8'
2'
A
2' 14'-3"
1 2
Date :
Project Name : Two and a Half Storey Residential
Building 20/Dec/2020
Title :
Client Name : Ma Thuzar Myint Rev ; 01
Ground Beam
Location : Amarapura township / Mandalay . Layout Drawing Drawing No. ST - 05
N
11'-3"
GB 9"x9"
E
3'-2" 9"
D
GB 9"x9"
9" 9" 6"x6" Stirrup
GB 9"x9"
GB 9"x9"
9" Ø10 mm@ 6"c/c
11'-6" 5" Main bar 6 Ø 16 mm
9"
Cover 1"
9" All GB' size are 9"x9"
C
GB 9"x9"
GB 9"x9"
GB 9"x9"
13'
9"
GB 9"x9"
B
GB 9"x9"
GB 9"x9"
13' 9"
GB 9"x9"
A
GB 9"x1'6"
9"
1 2
Date :
Project Name : Two and a Half Storey Residential
Building 20/Dec/2020
Title :
Client Name : Ma Thuzar Myint Rev ; 01
Excavation Plan
Location : Amarapura township / Mandalay . Drawing No. ST - 06
N
11'-3"
E
3'-2"
D
5' 5' B
13'
8'
A
14'-3"
1 2