VENTILATION PLAN FOR CONFINED SPACE ENTRY (DIAGRAM)

PLANT : GAS PROCESSING SANTONG (GPS), PETRONAS GAS BERHAD (PGB)


AREA : GPP5 (UNIT 02)
EQUIPMENT NO : C5-0201A/B
PMT NO. : PMT 107925 / PMT 107926
EQUIPMENT DESC : ABSORBER
JOB. DESC: INSTALLATION OF RANDOM PACKING
CONTRACTOR : ENPROSERVE (M) SDN BHD

MANHOLE 3

12" BLOWER (OUT) -1 UNIT


12" BLOWER (OUT) - 1 UNIT

VENTILATION POINT (BLOWER OUT)

MANHOLE 2
30.65 MTR

12" BLOWER (OUT) -2


AUTHORISED
ENTRANT PERSON VENTILATION POINT (BLOWER OUT)

STANDBY PERSON

MANHOLE 1
VENTILATION POINT (BLOWER IN)

12" BLOWER (IN) -1 UNIT


12" BLOWER (IN) - 1 UNIT

WORKER ENTRY POINT

SCAFFOLDING
VENTILATION PLAN DIAGRAM FOR
CONFINED SPACE ENTRY AT ABSORBER 4.88 MTR
C5-0201A/B, GPP5

REMARKS :
- CONTINOUS VENTILATION DURING SILENT HOUR
- THIS VENTILATION FLOW APPLICABLE FOR WELDING, CUTTING AND GRINDING WORKS, NOT APPLICABLE FOR PAINTING

Prepared by: Review by: Approved by:

.................................................................................... .................................................................................... .........................................................................

Name: Name: Name :


Position: Position: Position:
Date: Date: Date: