Professional Documents
Culture Documents
BPM 305 (Tma01) - Project Scheduling and Control (Mohamed Ali B1210887) BPM 305 (Tma01) - Project Scheduling and Control (Mohamed Ali B1210887)
BPM 305 (Tma01) - Project Scheduling and Control (Mohamed Ali B1210887) BPM 305 (Tma01) - Project Scheduling and Control (Mohamed Ali B1210887)
BPM 305 (TMA01) – PROJECT SCHEDULING AND CONTROL (MOHAMED ALI B1210887)
The UCA consist of the addition of all areas at very floor storey in a building or
st
stru
ruct
cture
ure whwhic
ich
h ar
are
e not
not encl
enclos
osed
ed encom
encompapassi
ssing
ng roof
roofed
ed ba
balc
lconi
onies,
es, opopen
en
verandas, porches and porticos, uncovered link ways attached alongside buildings,
undercr
und ercroft
oftss and usable
usable spa
space
ce und
under
er buildi
buildings
ngs,, une
unencl
nclosed
osed acce
access
ss galler
galleries
ies
which includes ground floor and other vehicular covered areas of building not
fully covered by full height walls. The computations can be made by scaling,
ta
taki
king
ng of
offf or calc
calcul
ulat
atin
ing
g th
the
e bou
bounde
nded
d and
and inte
interv
rven
enin
ingg area
area be
betw
twee
eenn the
the
surrounding walls and balustrade from the internal surface of UCA disregarding
and neglecting the thickness of the wall or balustrade.
Where size or area of site plot ratio is known or given, calculation of allowable
floor area can be computed for planning assessment as seen in scenario 3
below:
Page 7 of 22